CORRIDOR AESTHETIC MEETING

THE SOUTHERN GATEWAY PROJECT

APRIL 2016

Page 2: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

The Southern Gateway Project

Corridor Aesthetics

• 2003 Corridor Aesthetics Review

• Current Aesthetic Influences

• Corridor Inventory/Assessment

• Corridor Elements

• Aesthetic Theme

I-35E Lower Strata

US 67 Upper Strata

Oak Cliff Laced Strata

• Corridor Enhancements

• Next Steps

Page 3: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

2003 Corridor Analysis

Corridor Aesthetics

Corridor Analysis identified

the following:

MAN-MADE FEATURES

Major Roadway

Interchanges

Underpass and Overpass

Conditions

DART Interface

Airport Interface

NATURAL FEATURES

Creek Crossings

POLITICAL BOUNDARIES

City Limits

Page 4: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

2003 District Identifier

Corridor Aesthetics

Developed distinctive markers

for each of the five

neighborhoods and city

districts:

DeSoto/Lancaster

Cedar Hill/Duncanville

Southeast Oak Cliff

Southwest Oak Cliff

Oak Cliff

The objective is to maintain

structural consistency of

hardscape elements

throughout the length of the corridor.

DISTRICT IDENTIFIER

Page 5: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

2003 Thematic Design

Corridor Aesthetics

The urban design of the Southern Gateway corridor evolved from the site analysis

process that considered the adjacent neighborhood character of the corridor

beginning in the suburban areas of Lancaster and Cedar Hill and continuing

through many diverse neighborhoods to the urban center of Oak Cliff. The design

took the area’s rolling hills, mature trees and exposed native limestone into

consideration. The limestone geology, or strata, established the corridor theme

and was interpreted through pattern in the hardscape design elements of the

corridor.

Page 6: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

2003 Concept Studies

Corridor Aesthetics

Page 7: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Corridor Aesthetics

2003 Concept Studies

Page 8: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Corridor Aesthetics

2003 Concept Studies

Page 9: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Current Aesthetic Influence - Dallas Horseshoe Project

Corridor Aesthetics

Page 10: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Current Aesthetic Influence - Trinity Parkway

Corridor Aesthetics

Page 11: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Current Aesthetic Influence - Margaret Hunt Hill Bridge

Corridor Aesthetics

Page 12: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Current Aesthetic Influence - Margaret McDermott Bridge

Corridor Aesthetics

Page 13: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

13

The Southern Gateway Project - Project Location Map

Corridor Aesthetics

Page 14: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Corridor Inventory & Analysis

Corridor Aesthetics

Page 15: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Corridor Assessment

Corridor Aesthetics

Page 16: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Corridor Elements

Corridor Aesthetics

Corridor Elements are standard engineering elements that can be affected with aesthetic treatments, collectively totaling 1% or less of the project cost and can be included in the project.

Budgeted aesthetic treatments ( from 1% or less of the total project cost)

Page 17: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Corridor Elements

Corridor Aesthetics

Signage

Corridor Elements are standard engineering elements that can be affected with aesthetic treatments, collectively totaling 1% or less of the project cost and can be included in the project.

Budgeted aesthetic treatments ( from 1% or less of the total project cost)

Page 18: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Corridor Aesthetics

Corridor Elements

Corridor Elements are standard engineering elements that can be affected with aesthetic treatments, collectively totaling 1% or less of the project cost and can be included in the project.

Bents

Budgeted aesthetic treatments ( from 1% or less of the total project cost)

Page 19: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Corridor Aesthetics

Corridor Elements

Noise Walls

Corridor Elements are standard engineering elements that can be affected with aesthetic treatments, collectively totaling 1% or less of the project cost and can be included in the project.

Budgeted aesthetic treatments ( from 1% or less of the total project cost)

Page 20: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Aesthetic Theme Application

Corridor Aesthetics

Page 21: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Oak Cliff Laced Strata - Precedent & Influence

Corridor Aesthetics

Page 22: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Rug g e d Fla g sto ne Pho e nix Lime sto ne

Oak Cliff Laced Strata – Formliner Texture

Corridor Aesthetics

Fra c ture d Ro p e

Page 23: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Oak Cliff Laced Strata - Underpass Prototype

Corridor Aesthetics

Page 24: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Oak Cliff Laced Strata - Overpass Prototype

Corridor Aesthetics

Page 25: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Oak Cliff Laced Strata - Canyon Prototype

Corridor Aesthetics

Page 26: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Oak Cliff Laced Strata - Bridge Bent & Column Type

Corridor Aesthetics

Brid g e Be nt Pro to typ e

Dire c t Co nne c to r Co lumn

Page 27: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Oak Cliff Laced Strata - Noise Wall

Corridor Aesthetics

No ise Wa ll Pro to typ e

Page 28: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

28

Oak Cliff Baseline - Overpass Prototype

Corridor Aesthetics

Page 29: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Oak Cliff Laced Strata - Overpass Prototype

Corridor Aesthetics

Page 30: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

US 67 Upper Strata - Precedent & Influence

Corridor Aesthetics

Page 31: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

US 67 Upper Strata – Formliner Texture

Corridor Aesthetics

Bush Ha mme r Fra c ture d Ro p e Sp lit Fa c e Ro c k

Page 32: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

US 67 Upper Strata - Noise Wall

Corridor Aesthetics

No ise Wa ll Pro to typ e

Page 33: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

City of Dallas Funded Enhancement Opportunities

Corridor Aesthetics

City of Dallas Funded Enhancement Opportunities require financing for construction and operation costs. The city will be responsible for maintenance.

NOT included within the TxDOT 1% Aesthetic Corridor Enhancement.

Page 34: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Corridor Aesthetics

La nd sc a p e

Mo nume nt

Sig na g e

De c o ra tive

Ha rd sc a pe

Enha nc e d Pe d e stria n

Pa ve me nt (p a ve rs)

City of Dallas Funded Enhancement Opportunities

Overpass Enhancement Opportunities

NOT included within the TxDOT 1% Aesthetic Corridor Enhancement.

Page 35: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

City of Dallas Funded Enhancement Opportunities

Corridor Aesthetics

La nd sc a p e

Mo nume nt

Sig na g e

Enha nc e d Pe d e stria n

Pa ve me nt (p a ve rs)

Underpass Enhancement Opportunities

NOT included within the TxDOT 1% Aesthetic Corridor Enhancement.

Page 36: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

36

Corridor Aesthetics Technical Guidelines

Page 37: THE SOUTHERN GATEWAY PROJECT CORRIDOR AESTHETIC …...collectively totaling 1% or less of the project cost and can be included in the project. Budgeted aesthetic treatments ( from

Next Steps

Corridor Aesthetics

1. TxDOT Finalizes Draft Aesthetic Guidelines and initiates Design-Build Project

• Segment 1 (IH-35E) – Full Reconstruction, full implementation of guidelines

• Segment 2A (US 67) – Widening of existing, partial implementation of

guidelines

o Full implementation of guidelines for proposed Noise Walls

o Widening of existing bridges along with retaining walls will receive In

Kind aesthetic implementation

2. City of Dallas/Stakeholders develop standalone aesthetic/landscaping

enhancement projects

3. Projects submitted for funding:

• TxDOT Green Ribbon Landscape Improvements Program

• Other

4. City of Dallas design, construction and maintenance of enhancement projects