Page 1: THE SLURRY PIPELINE revolution

THE SLURRY PIPELINE

revolution

Page 2: THE SLURRY PIPELINE revolution

3El Halassa mine in Khouribga

The world’s largest phophate reserves formed around 70 million years agoThe Moroccan phosphate deposits, of sedimentary type, formed about 70 million years ago.OCP has exclusive access to Morocco’s phosphate reserves,the world’s largest*. The Group extracts a wide variety ofrocks of different grades and produces a wide-ranging portfolio of products.

* according to US Geological Survey

Page 3: THE SLURRY PIPELINE revolution

5

OCP,WORLD LEADERIN THE PHOSPHATE INDUSTRYWith exclusive access to the world's largest phosphate reserves, OCP maintains its position as the world leader in the phosphate industry, including phosphate rock, phosphoric acid and phosphate fertilizer. Fully integrated, the Group is engaged at each stage of the value chain, from mining to processing to the sale of phosphate products.

Boasting major industrial plants designed according to the best international standards in processes, technologies and industrial tools, OCP produces close to 28 million tons of phosphate rock, 3 million tons of P2O5 phosphoric acid and 4 million tons of fertilizer (MAP, DAP…).

Moreover, its appropriately tailored organization has allowed this global leader to export more than 28% of phosphate in all its forms, with mining capacities exceeding 34 million tons per year.

Thus, with almost a 100-years experience in industrial development, the Group has successfully confirmed its unique positioning and unequaled flexibility in a highly-specialized and complex industry.

IN FERTILIZER EXPORTATIONS

IN PHOSPHATEROCK EXPORTATIONS

IN PHOSPHORIC ACID

EXPORTATIONS

5

*OCP & IFA, 2013

19%

33%

47%

GLOBAL MARKET SHARES*

Page 4: THE SLURRY PIPELINE revolution

7

In order to meet the world's growing agricultural needs in phosphate and fertilizing solutions, the Group has initiated in 2008 a historical turning point with the rollout of a new comprehensive Industrial Transformation Strategy.

This revolutionary process, requiring a 145 billion MAD investment for the whole program, prerequisites a radical transformation in the Group’s 23,000 employees working, operating, and behaving modes.

Hence, the ultimate objective of doubling the extraction capacity of the mines and tripling the processing capacity by 2025 will allow the Group

to achieve another change in the scale.It will also help enhance the production capacity of phosphates and fertilizers, optimize cost effectiveness, invest in R&D and reinforce the World Class leadership of the Group by combining performance and industrial development.

In order to achieve this ambitious strategy, OCP introduced in 2008 a new era of industrial development by launching mega-projects on the Group's different operating plants.

Being a true technological exploit, the industrial development program is announcing in-depth transformation of both the production tools and industry practices.

145 BILLION MAD WILL BE INVESTED BY 2025

The first integrated fertilizer production unit - Jorf Lasfar

Page 5: THE SLURRY PIPELINE revolution

9

Harnessing flexibility to ensure an adapted production to market fluctuations Ability to quickly adapt the mining operation processes and granulation capacity to produce different volumes of ore, acid and fertilizers and adapt to the cycles of a volatile market.

Un engagement durable pour une responsabilité éco-citoyenneConscience au quotidien

Présente dans le travail, système de production, ...

A long-term commitment for aneco-citizenresponsibilitySustainable development is deeply rooted in project management and in upstream strategic thinking. It is present in the day-to-day work, the production system and in the eco-design of industrial investments.

OCP ProductionSystem (OPS)An industrial model exclusive to the Group, at the service of the industrial strategy, involving in-depth transformation of production tools and of industrial practices and processes.

Terminal station of the Slurry Pipeline - Jorf Lasfar

Pursuing the development and the diversification of the asset portfolioto meet the growing demand of food requirements.

2x3x

the extracting capacity

the processing capacity

Continuing to invest in the industrial assets, R&D and innovation to maintain the most competitive cash costs worldwide.

Cost leadership:massive savings and sustainable policy

Page 6: THE SLURRY PIPELINE revolution

11

THE SLURRY PIPELINE REVOLUTION:THE FIRST OF ITS KIND IN MOROCCOAmong the OCP projects implemented as part of the industrial development program is the Slurry Pipeline. This major change in the Group's industrial process relies predominantly on the technological leap of pipeline hydraulic transport to meet the twin challenge of volume growth and cost optimization throughout the value chain.

Th is techno log ica l sh i f t marks fundamental changes in the phosphate transport approach in Morocco, with the shift of the production chain from discrete to continuous and integrated mode, from phosphate m in ing to bene f i c i a t i on i n the processing units up to loading of phosphate products onto the ship for export.

11Phosphate pulp storage facility - Jorf Lasfar

Secondary pipelines: 48 km

Primary pipeline: 187 km

Page 7: THE SLURRY PIPELINE revolution

1313

Head station of the Slurry Pipeline - Khouribga

Page 8: THE SLURRY PIPELINE revolution

15

PROJECT CONTENT

• 187 km length and 900 mm diameter primary pipeline connecting the head station in Khouribga to the terminal station in Jorf Lasfar.

• 48 km secondary pipelines (300 to 500 mm diameter) connecting the washing plants to the head station.

• Main pipeline's head station consisting of 4 pulpreservoirs and the main pumping station supplying the mineral pipeline.

• The terminal station at Jorf Lasfar with 8 tanks designed to receive and distribute the phosphate pulp to the different consumption functions.

• Valve and pressure monitoring stations.

• Data Control and Acquisition System.

An innovative large-scale projectThis mineral pipeline secures the continuous transport of phosphate pulp from Khouribga mines to the Jorf Phosphate Hub integrated processing platform, where it will be transformed into derivative products, while cutting down on several intermediate steps for its transport.

No changeStep removed under the new production modeStep strongly modified under the new process

Former Mode: 20 Mt/y, several intermediate stocks, discontinuous transport

New Mode: 38 Mt/y, transport by Slurry Pipeline, continuous process

1. HS: Head Station 2. TS: Terminal Station

Mining Washing,Crushing,Flotation

Storage Conveyor Drying Transportand storage

Loading Transport by train

Unloading in Casablanca

Unloading at Jorf Lasfar Export

Export

Processing

Mining Washing,Crushing,Flotation

Head station Transport via Slurry Pipeline

Terminal station

TS2HS1

Export

ExportProcessing

Continuous transportation mode Transportation of the phosphate pulp and elimination of the drying phase prior to transport.

Terminal station Head station Oued Oum Er Rabiaa

900

800

700

600

500

400

300

200

100

Route of the Slurry Pipeline,optimized to take advantage of the Khouribga minig area steepness

Page 9: THE SLURRY PIPELINE revolution

17

phosphate pulp (consisting of 60% phosphate and 40% water) after it had been mined and washed in Khouribga – with a total capacity of no less than 38 million tons of phosphates per year.

Phosphate rock from the different mines of Khouribga is enriched in four processing units through washing and flotation. Equipped with crushers and thickeners, these units allow for the preparation of phosphate pulp for pipeline hydro-transport. Crushed and thickened pulp is

Technological innovation and engineeringStretching over a distance of nearly 235 km, the Khouribga-Jorf Lasfar Integrated Line’s Slurry Pipeline, flowing thanks to natural gravity, achieved the impressive feat of transporting the

then stored in tanks upon leaving the washing plants and are then pumped via secondary pipelines up to a collecting station located near the Merah washing plant, called head station.

From this station, phosphate pulp supplies the main pipeline ensuring the hydro-transport from Khouribga to the Jorf Lasfar processing platform.

Finally, the terminal station, consisting of storage tanks, is designed for the receipt and distribution of phosphate pulp.

Thus, as it has been designed, the pipeline route has been fully optimized as to minimize the length of the main pipeline, and thereby reduce route constraints and avoid passing through population centers.

Receipt of the phosphate pulp at the Jorf Lasfar processing platform

Page 10: THE SLURRY PIPELINE revolution

19

The Khouribga-Jorf Lasfar pipeline is lying at a depth of two meters below ground level. Very robust and made of special alloy steel, it is protected thanks to an internal and external coating and enjoys cathode corrosion protection.Equipped with 4 intermediate pressure control stations set every 40 km, the Slurry Pipeline provides directly the pressure-related data necessary to the monitoring system (SCADA) including three basic components:• A monitoring system consisting of controllers and computers network managed and supervised from several locations;• A communication system ensuring the transmission of data between various locations all along the pipeline ;

• A software connection that assists the operators in the monitoring data evaluation and allows them to respond quickly to any abnormal situation.

The data analysis system is fitted with a software providing for the continuous evaluation of data originated from the SCADA system of the pipeline.This system is used to highlight the measures necessary in case of likely leak detections.

Hence, the specific feature of this secure process is to considerably improves the volume/production cost competitiveness while significantly reducing the ecological footprint, thanks to sizable savings in water and energy consumption.

An optimum Control System

Page 11: THE SLURRY PIPELINE revolution

21

98%availability rate

THE SLURRY PIPELINEAT THE VERY HEART OF THE TRANSFORMATION PROCESS

total length including the main pipeline and the secondary pipelines

235KM

in overall investments

billiondirhams

4.5

Reductions in CO2

emissions

Tons/year930 000

reduction oflogistic costs

90% of water saved every year thanks to rock's

natural moisture retention capability

3million m3

as compared to18 million tons before

million tons capacity of transporting phosphates

per year

The world's largest transport capacity

38

the Slurry Pipelinewith

the largest diameter

90cm

Page 12: THE SLURRY PIPELINE revolution

23

Innovative projectsfor asustainable agriculture...As a major player in global agriculture, OCP's primary mission is to provide farmers over the world with tools to improve yields, enhance productivity and boost their income.

The Group has initiated an ambitious strategy to move into the rank of the most environment-friendly corporations, firmly confident that sustainable development is the only option to guarantee long-term shared value creation.

This environmental excellence strategy reflects the operational excellence strategy OCP is committed in.