May 2020 Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 The Sizewell C Project 6.3 Revision: 1.0 Applicable Regulation: Regulation 5(2)(a) PINS Reference Number: EN010012 Volume 2 Main Development Site Chapter 19 Groundwater and Surface Water Appendix 19B: Sizewell C Conceptual Site Model of the Hydrogeological Regime Part 5 of 5

The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

May 2020

Planning Act 2008 Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009

The Sizewell C Project

6.3

Revision: 1.0

Applicable Regulation: Regulation 5(2)(a)

PINS Reference Number: EN010012

Volume 2 Main Development SiteChapter 19 Groundwater and Surface Water Appendix 19B: Sizewell C Conceptual Site Model of the Hydrogeological Regime Part 5 of 5

Page 2: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2
Page 3: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2
Page 4: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2
Page 5: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2
Page 6: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

0

0.2

0.4

0.6

0.8

1

1.2

-0.2

0.0

0.2

0.4

0.6

0.8

1.0

1.2

01/0

1/20

19

26/0

1/20

19

20/0

2/20

19

17/0

3/20

19

11/0

4/20

19

06/0

5/20

19

31/0

5/20

19

Daily

Rai

nfal

l mm

Aver

age

Hour

ly W

ater

Leve

l mAO

D

Chart 7E: Groundwater Levels Within C3 Boreholes and Neighbouring Peat Piezometers, 2019

P10

P13

C3S

C3D

No Rainfall Data

Page 7: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

This Chart supersedes Chart 8 in the 2015 CSM Report

Page 8: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2
Page 9: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2
Page 10: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2
Page 11: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2
Page 12: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

0

0.2

0.4

0.6

0.8

1

1.2

0.0

0.1

0.2

0.3

0.4

0.5

0.6

0.7

0.8

0.9

1.0

01/0

1/20

19

26/0

1/20

19

20/0

2/20

19

17/0

3/20

19

11/0

4/20

19

06/0

5/20

19

31/0

5/20

19

Daily

Rai

nfal

l mm

Aver

age

Hour

ly W

ater

Leve

l mAO

D

Chart 8E: Groundwater Levels Within C4 Boreholes and Neighbouring Peat Piezometers, 2019

P12

C4S

C4D

No Rainfall Data

Page 13: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

P9

P8

P7

P6

P5

P4

P3 P2

P1

P15

P14

P12

P11

P10

0.7

0.6

0.67

0.68

0.660.69

0.71

0.65

0.64

0.62

0.63

0.61

0.59

0.72

0.58

0.73

0.57

0.73

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIXB1

FIGURE 19B 1.1

0 0.04 0.08 0.12 0.16 0.2KM

Project Title:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:4,000 @A3

2013 PEAT PIEZOMETERS

WATER LEVEL IN PEAT MONITORINGBOREHOLES (MAOD)

GROUNDWATER IN PEAT DEPOSITS DURINGPUMPING AT MINSMERE SLUICE (07/01/2014)

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

KEY

EXTENT OF THE PEAT DEPOSITS.PEAT CONTOURS ARE CONSTRAINED TO THE

5129919/SZC/201 IN THE 2015 CSM REPORTTHIS FIGURE SUPERSEDES DRAWINGNOTES

5 5

Page 14: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

P9

P8

P7

P6

P5

P4

P3 P2

P1

P15

P14

P12

P11

P10

0.5

0.52

0.6

0.51

0.49

0.48

0.53

0.47

0.54

0.46

0.55

0.45

0.56

0.57

0.58

0.44

0.43

0.590.

610.

620.

630.

64

0.65

0.42

0.66

0.410.4

0.50.41

0.59

0.52

0.58

0.51

0.42

0.52 0.41

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIXB1

FIGURE 19B 1.2

0 0.04 0.08 0.12 0.16 0.2KM

Project Title:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:4,000 @A3

2013 PEAT PIEZOMETERS

WATER LEVEL IN PEAT MONITORINGBOREHOLES (MAOD)

GROUNDWATER IN PEAT DEPOSITS POSTPUMPING AT MINSMERE SLUICE (01/06/2014)

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

KEY

EXTENT OF THE PEAT DEPOSITS.PEAT CONTOURS ARE CONSTRAINED TO THE

55129919/SZC/202 IN THE 20155 CSM REPORTTHIS FIGURE SUPERSEDES DRAWINGNOTES

Page 15: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

C4 (S&D)

C3 (S&D)

C2 (S&D)

C1 (S&D)

GW3

GW2

PZ8PZ7 PZ6

PZ5

PZ3

PZ2

GW20

PZ21

PZ20

PZ19 PZ17

PZ16

PZ15

PZ14

PZ13

PZ11PZ10

PZ18 & GW6S

1

2

0.9

1.11.

2

1.3

1.41.

5

1.8

1.6

1.7

1.9

0.8

0.7

2.1

0.71.3

1.8

1.4

1.7

1 1.51.3

0.9

1.2

1.1

1.6

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.3

0 0.08 0.16 0.24 0.32 0.4KM

Project Title:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:8,079 @A3

2013 BHs with loggers

2010 BHs with loggers

WATER LEVEL IN CRAG MONITORINGBOREHOLES (MAOD)

KEY

NOTES

GROUNDWATER CONTOURS IN CRAG AQUIFERDURING STORM SURGE (06/12/2013)

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

TextTextText

GROUNDWATER FLOW DIRECTION

55129919/SZC/203 IN THE 20155 CSM REPORT

THIS FIGURE SUPERSEDES DRAWING

Page 16: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

C4 (S&D)

C3 (S&D)

C2 (S&D)

C1 (S&D)

GW3

GW2

PZ8PZ7 PZ6

PZ5

PZ3

PZ2

GW20

PZ21

PZ20

PZ19 PZ17

PZ16

PZ15

PZ14

PZ13

PZ11PZ10

PZ18 & GW6S

1

2 0.7

0.8

0.9

1.1

1.21.

3

1.41.5

1.6

1.9

1.7

1.8

0.6

0.5

2.1

0.7

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.4

0 0.085 0.17 0.255 0.34 0.425KM

Project Title:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:8,653 @A3

2013 BHs with loggers

2010 BHs with loggers

WATER LEVEL IN CRAG MONITORINGBOREHOLES (MAOD)

KEY

NOTES

GROUNDWATER CONTOURS IN CRAG AQUIFERDURING NORMAL CONDITIONS (11/06/2014)

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

55129919/SZC/204 IN THE 20155 CSM REPORT

THIS FIGURE SUPERSEDES DRAWING

Page 17: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

C4 (S&D)

C3 (S&D)

C2 (S&D)

C1 (S&D)

GW3

GW2

PZ8PZ7 PZ6

PZ5

PZ3

PZ2

GW20

PZ21

PZ20

PZ19 PZ17

PZ16

PZ15

PZ14

PZ13

PZ11PZ10

PZ18 & GW6S

1

2

0.8

0.9

1.11.

21.3

1.4

1.5

1.9

1.6

1.71.8

0.7

2.1

0.6

0.8

0.6

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.5

0 0.085 0.17 0.255 0.34 0.425KM

Project Title:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:8,657 @A3

2013 BHs with loggers

2010 BHs with loggers

WATER LEVEL IN CRAG MONITORINGBOREHOLES (MAOD)

GROUNDWATER CONTOURS IN CRAG AQUIFERDURING PUMPING AT SLUICE (28/02/2014)

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

5

KEY

REPORTTHIS FIGURE SUPERSEDES DRAWINGNOTES

5129919/SZC/20 5 IN THE 20155 CSM

Page 18: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

BP23

BDG1A

C4 (S&D)

C3 (S&D)

C2 (S&D)

C1 (S&D)

GW3

GW2

PZ8PZ7 PZ6

PZ5

PZ3

PZ2

GW20

PZ21

PZ20

PZ19 PZ17

PZ16

PZ15

PZ14

PZ13

PZ11PZ10

PZ18 & GW6S

1

1.1

1.2

1.3

1.7

1.6

1.4

1.5

1.8

0.9

0.8

1.9

2

0.7 0.6

2.1

0.9SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.6

0 0.085 0.17 0.255 0.34 0.425KM

Project Title:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:8,653 @A3

2014 BHs WITH LOGGERS

2013 BHs with loggers

2010 BHs with loggers

WATER LEVEL IN CRAG MONITORINGBOREHOLES (MAOD)

KEY

NOTES

GROUNDWATER CONTOURS IN CRAG AQUIFERDURING MID TIDAL CYCLE (14/10/2014)

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

55129919/SZC/206 IN THE 20155 CSM REPORT

THIS FIGURE SUPERSEDES DRAWING

Page 19: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

C4 (S&D)

C3 (S&D)

C2 (S&D)

C1 (S&D)

GW3

GW2

PZ8PZ7 PZ6

PZ5

PZ3

PZ2

GW20

PZ21

PZ20

PZ19 PZ17

PZ16

PZ15

PZ14

PZ13

PZ11PZ10

PZ18 & GW6S

1

1.4

1.5

1.3

1.6

1.7

1.2

1.8

2

1.1

1.9

1.15

1.45

1.35

1.55

1.65

1.25

1.75

1.85

0.9

1.05

1.95

0.85

0.95

0.8

2.05

2.1

0.751

1.051.1

1.1

0.95

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.7

0 0.085 0.17 0.255 0.34 0.425KM

Project Title:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:8,650 @A3

2014 BHs with

2013 BHs with

2010 BHs with

WATER LEVEL IN CRAG MONITORINGBOREHOLES (MAOD)

KEY

NOTES

GROUNDWATER CONTOURS IN CRAG AQUIFERDURING LOW TIDE (09/12/2014)

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

55129919/SZC/207 IN THE 20155 CSM REPORT

THIS FIGURE SUPERSEDES DRAWING

Page 20: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

C4 (S&D)

C3 (S&D)

C2 (S&D)

C1 (S&D)

GW3

GW2

PZ8PZ7 PZ6

PZ5

PZ3

PZ2

GW20

PZ21

PZ20

PZ19 PZ17

PZ16

PZ15

PZ14

PZ13

PZ11PZ10

PZ18 & GW6S

1

2

1.21.

4

1.5

1.6

1.3

1.8 1.7

1.9

1.1

0.9

0.8

0.7

0.6

0.5

0.4

0.3

2.1

1

0.8

1.1

0.90.7

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.8

0 0.085 0.17 0.255 0.34 0.425KM

Project Title:

DRAWING TITLE:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:8,650 @A3

2014 BHs with

2013 BHs with

2010 BHs with

WATER LEVEL IN CRAG MONITORINGBOREHOLES (MAOD)

KEY

NOTES

GROUNDWATER CONTOURS IN CRAG AQUIFERDURING HIGH TIDE (09/12/2014)

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

55129919/SZC/208 IN THE 20155 CSM REPORT

THIS FIGURE SUPERSEDES DRAWING

Page 21: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

GW3

GW2

PZ8PZ7 PZ6

PZ5

GW20

PZ21

PZ20

PZ19

PZ18

PZ17

PZ16

PZ15

PZ14

PZ13

PZ11PZ10

PZ 3

PZ 2

BDG1

BP23

C4 D

C4 S

C3 D

C3 S

C2 D

C2 S

C1 D

C1 S

1

1.1

1.2

1.3

1.4

1.5

1.6

0.9

1.7

1.8

0.8

2

1.9

0.70.

6

2.1 0.7

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.9

0 0.1 0.2 0.3 0.4 0.5KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:10,103 @A3

2010 BOREHOLES

2013 BOREHOLES

2014 BOREHOLES

GROUNDWATER CRAG CONTOURS(MAOD) - SUMMER 2015

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING SUMMER 2015 (01/06/2015)GROUNDWATER CONTOURS IN CRAG AQUIFERDRAWING TITLE:

Page 22: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

GW3

GW2

PZ8PZ7 PZ6

PZ5

GW20

PZ21

PZ20

PZ19

PZ18

PZ17

PZ16

PZ15

PZ14

PZ13

PZ11PZ10

PZ 3

PZ 2

BDG1

BP23

C4 D

C4 S

C3 D

C3 S

C2 D

C2 S

C1 D

C1 S

1

1.6

1.5

1.1

1.2

1.3

1.4

0.9

1.7

1.8

0.8 0.7

1.9

2

0.8

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.10

0 0.1 0.2 0.3 0.4 0.5KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:10,103 @A3

2010 BOREHOLES

2013 BOREHOLES

2014 BOREHOLES

GROUNDWATER CRAG CONTOURS(MAOD) - WINTER 2015

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING WINTER 2015 (09/12/2015)GROUNDWATER CONTOURS IN CRAG AQUIFERDRAWING TITLE:

Page 23: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

GW3

GW2

PZ8PZ7 PZ6

PZ5

GW20

PZ21

PZ20

PZ19

PZ18

PZ17

PZ16

PZ15

PZ14

PZ13

PZ11PZ10

PZ 3

PZ 2

GR11

CPB_BP_11

BDG1

BP23

C4 D

C4 S

C3 D

C3 S

C2 D

C2 S

C1 D

C1 S

1

1.2 1.1

1.3

1.6

1.4

1.5

0.9

1.7

0.8

0.7

0.6

1.8

0.50.4

1.9

0.70.8

0.9

0.7

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.11

0 0.1 0.2 0.3 0.4 0.5KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:10,103 @A3

2010 BOREHOLES

2013 BOREHOLES

2014 BOREHOLES

2015 BOREHOLES

GROUNDWATER CRAG CONTOURS(MAOD) - SUMMER 2016

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING SUMMER 2016 (01/06/2016)GROUNDWATER CONTOURS IN CRAG AQUIFERDRAWING TITLE:

Page 24: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

GW3

GW2

PZ8PZ7 PZ6

PZ5

GW20

PZ21

PZ20

PZ19

PZ18

PZ17

PZ16

PZ15

PZ14

PZ13

PZ11PZ10

PZ 3

PZ 2

GR11

CPB_BP_11

BDG1

BP23

C4 D

C4 S

C3 D

C3 S

C2 D

C2 S

C1 D

C1 S

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.12

0 0.1 0.2 0.3 0.4 0.5KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:10,103 @A3

2010 BOREHOLES

2013 BOREHOLES

2014 BOREHOLES

2015 BOREHOLES

GROUNDWATER CRAG CONTOURS(MAOD) - WINTER 2016

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING WINTER 2016 (09/12/2016)GROUNDWATER CONTOURS IN CRAG AQUIFERDRAWING TITLE:

Page 25: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

GW3

GW2

PZ8PZ7 PZ6

PZ5

GW20

PZ21

PZ20

PZ19

PZ18

PZ17

PZ16

PZ15

PZ14

PZ13

PZ11PZ10

PZ 3

PZ 2

GR11

CPB_BP_11

BDG1

BP23

C4 D

C4 S

C3 D

C3 S

C2 D

C2 S

C1 D

C1 S

2

1

1.9

1.8

1.7

1.6 1.4

1.5

0.8

1.3

2.1

1.2

0.9

1.1

2.2

0.7

2.3

2.4

0.6

2.5

0.5

2.6

0.4

2.72.8

0.6

0.7

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.13

0 0.1 0.2 0.3 0.4 0.5KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:10,103 @A3

2010 BOREHOLES

2013 BOREHOLES

2014 BOREHOLES

2015 BOREHOLES

GROUNDWATER CRAG CONTOURS(MAOD) - SUMMER 2017

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING SUMMER 2017 (01/06/2017)GROUNDWATER CONTOURS IN CRAG AQUIFERDRAWING TITLE:

Page 26: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

GW3

GW2

PZ8PZ7 PZ6

PZ5

GW20

PZ21

PZ20

PZ19

PZ18

PZ17

PZ16

PZ15

PZ14

PZ13

PZ11PZ10

PZ 3

PZ 2

GR11

CPB_BP_11

BDG1

BP23

C4 D

C4 S

C3 D

C3 S

C2 D

C2 S

C1 D

C1 S

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.14

0 0.1 0.2 0.3 0.4 0.5KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:10,103 @A3

2010 BOREHOLES

2013 BOREHOLES

2014 BOREHOLES

2015 BOREHOLES

GROUNDWATER CRAG CONTOURS(MAOD) - WINTER 2017

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING WINTER 2017 (09/12/2017)GROUNDWATER CONTOURS IN CRAG AQUIFERDRAWING TITLE:

Page 27: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

GW3

GW2

PZ8PZ7 PZ6

PZ5

GW20

PZ21

PZ20

PZ19

PZ18

PZ17

PZ16

PZ15

PZ14

PZ13

PZ11PZ10

PZ 3

PZ 2

GR11

CPB_BP_11

BDG1

BP23

C4 D

C4 S

C3 D

C3 S

C2 D

C2 S

C1 D

C1 S

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.15

0 0.1 0.2 0.3 0.4 0.5KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:10,103 @A3

2010 BOREHOLES

2013 BOREHOLES

2014 BOREHOLES

2015 BOREHOLES

GROUNDWATER CRAG CONTOURS(MAOD) - SUMMER 2018

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING SUMMER 2018 (01/06/2018)GROUNDWATER CONTOURS IN CRAG AQUIFERDRAWING TITLE:

Page 28: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

GW3

GW2

PZ8PZ7 PZ6PZ5

GW20

PZ21

PZ20

PZ19

PZ18

PZ17

PZ16

PZ15

PZ14

PZ13

PZ11PZ10

PZ 3

PZ 2

GR11

CPB_BP_11

BDG1

BP23

C4 DC4 S

C3 DC3 S

C2 DC2 S

C1 DC1 S

2

1

1.9

1.81.7

1.4

1.6

1.5

1.3

1.2

1.1

2.1

2.22.32.4

0.8

0.9

2.52.6

2.7

0.7

1.2

1

1

1.1

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.16

0 0.1 0.2 0.3 0.4 0.5KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:10,103 @A3

2010 BOREHOLES2013 BOREHOLES2014 BOREHOLES2015 BOREHOLESGROUNDWATER CRAG CONTOURS(MAOD) - WINTER 2018

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHTNOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING WINTER 2018 (09/12/2018)GROUNDWATER CONTOURS IN CRAG AQUIFERDRAWING TITLE:

Page 29: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

0.5

0.6

0.48

0.46

0.52

0.540.56

0.58

0.44

0.42

0.62

0.64

0.4

0.66

0.680.7

0.38

0.36

0.34

0.32

0.72

0.480.64

0.58

0.62

0.56

0.66

P9

P8

P7

P6

P5

P4

P3P2

P1

P15

P14

P12

P11

P10

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.17

0 0.03 0.06 0.09 0.12 0.15KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:3,357 @A3

2013 PEAT BOREHOLES

GROUNDWATER PEAT CONTOURS(MAOD) - WINTER 2015

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING WINTER 2015 (09/12/2015)GROUNDWATER CONTOURS IN PEAT AQUIFERDRAWING TITLE:

Page 30: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

0.5

0.460.48

0.44

0.52

0.54

0.6

0.56

0.4

0.58

0.420.38

0.62

0.64

0.36

0.66

0.34

0.68

0.7

0.5

0.560.

42

0.46

0.54

P9 P8

P7

P6

P5

P4

P3P2

P1

P15

P14

P12

P11

P10

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.18

0 0.03 0.06 0.09 0.12 0.15KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:3,357 @A3

2013 PEAT BOREHOLES

GROUNDWATER PEAT CONTOURS(MAOD) - SUMMER 2016

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING SUMMER 2016 (01/06/2016)GROUNDWATER CONTOURS IN PEAT AQUIFERDRAWING TITLE:

Page 31: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

0.5

0.47

0.48

0.490.

46

0.6 0.51

0.52

0.530.55

0.54

0.56

0.57

0.45

0.580.590.61

0.44

0.62

0.430.42

0.4

0.63

0.41

0.64

0.39

0.65

0.41

0.61

0.59

0.47

0.620.58

0.6

0.44

0.62

0.43

0.42

P9

P8

P7

P6

P5

P4

P3P2

P1

P15

P14

P12

P11

P10

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.19

0 0.03 0.06 0.09 0.12 0.15KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:3,357 @A3

2013 PEAT BOREHOLES

GROUNDWATER PEAT CONTOURS(MAOD) - WINTER 2016

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING WINTER 2016 (09/12/2016)GROUNDWATER CONTOURS IN PEAT AQUIFERDRAWING TITLE:

Page 32: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

0.3

0.4

0.44

0.32

0.34

0.360.38

0.42

0.46

0.48

0.28

0.260.24

0.2

0.22

0.5 0.18

0.16

0.28

0.28

0.260.24

0.26

P9

P8

P7

P6

P5

P4

P3P2

P1

P15

P14

P12

P11

P10

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.20

0 0.03 0.06 0.09 0.12 0.15KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:3,357 @A3

2013 PEAT BOREHOLES

GROUNDWATER PEAT CONTOURS(MAOD) - SUMMER 2017

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING SUMMER 2017 (01/06/2017)GROUNDWATER CONTOURS IN PEAT AQUIFERDRAWING TITLE:

Page 33: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

0.5

0.56

0.6

0.54

0.52

0.58

0.46

0.480.44

0.62

0.42

0.4

0.64

0.380.36

0.46

P9

P8

P7

P6

P5

P4

P3P2

P1

P15

P14

P12

P11

P10

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.21

0 0.03 0.06 0.09 0.12 0.15KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:3,357 @A3

2013 PEAT BOREHOLES

GROUNDWATER PEAT CONTOURS(MAOD) - WINTER 2017

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING WINTER 2017 (09/12/2017)GROUNDWATER CONTOURS IN PEAT AQUIFERDRAWING TITLE:

Page 34: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

0.4

0.440.46

0.36

0.34

0.38

0.42

0.30.32

0.28

0.48

0.26

0.5

0.24

0.22

0.2

0.34

P9

P8

P7

P6

P5

P4

P3P2

P1

P15

P14

P12

P11

P10

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.22

0 0.03 0.06 0.09 0.12 0.15KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:3,357 @A3

2013 PEAT BOREHOLES

GROUNDWATER PEAT CONTOURS(MAOD) - SUMMER 2018

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING SUMMER 2018 (01/06/2018)GROUNDWATER CONTOURS IN PEAT AQUIFERDRAWING TITLE:

Page 35: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

0.6

0.7

0.67

0.680.66

0.69

0.59

0.65

0.58

0.61

0.64

0.620.63

0.57

0.710.72

0.56

0.55

0.73

0.54

0.74

0.570.56

P9

P8

P7

P6

P5

P4

P3 P2

P1

P15

P14

P12

P11

P10

SIZEWELL C PROJECTENVIRONMENTAL STATEMENTVOLUME 2CHAPTER 19B1GROUNDWATER AND SURFACE WATER APPENDIX B1

FIGURE 19B 1.23

0 0.03 0.06 0.09 0.12 0.15KM

Project Title:

DRAWING NO:

DATE: DRAWN: SCALE :

JAN 2020 S.R.HSCALE BAR

Reproduced from Ordnance Survey map with the permission ofOrdnance Survey on behalf of the controller of Her Majesty'sStationery Office © Crown Copyright (2019). All Rightsreserved. NNB GenCo 0100060408.

1:3,357 @A3

2013 PEAT BOREHOLES

GROUNDWATER PEAT CONTOURS(MAOD) - WINTER 2018

KEY

NOTES

© Copyright 2020 NNB Generation Company (SZC) Limited. No part of this drawingis to be reproduced without prior permission of NNB Generation Company (SZC) Limited.

COPYRIGHT

NOT PROTECTIVELY MARKED

GROUNDWATER FLOW DIRECTION

PEAT CONTOURS ARE CONSTRAINED TO THEEXTENT OF THE PEAT DEPOSITS

DURING WINTER 2018 (09/12/2018)GROUNDWATER CONTOURS IN PEAT AQUIFERDRAWING TITLE:

Page 36: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

Sea

SeaSea

Fresh

Fresh Fresh

Mixing

0

100

00

00

00

0

100

100

100100100

100

100

Plot 1: Crag Water Quality 2015 to 2019

Page 37: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

Sea

SeaSea

Fresh

Fresh Fresh

Mixing

100

00

00

00

0

100

100

100100100

100

100

0

Plot 2: Made Ground Water Quality 2015 to 2019

Page 38: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

Sea

SeaSea

Fresh

Fresh Fresh

Mixing

Sea

SSea

Fresh

resh Fresh

MixingM gg

0

Plot 3: Peat Water Quality 2015 to 2019

Page 39: The Sizewell C Project · 43 42 4 63 41 64 39 65 41 61 59 47 62 58 6 44 62 43 P9 42 P8 P7 P6 P5 P4 P3 P2 P1 P15 P14 P12 P11 P10 SIZEWELL C PROJECT ENVIRONMENTAL STATEMENT VOLUME 2

Sea

SeaSea

Fresh

Fresh Fresh

Mixing

Sea

SeSea

Fresh

resh Fresh

MixingM gg

0

Plot 4: Surface Water Quality 2015 to 2019