8/3/2019 The Seven Waste
1/14
Waste
Waste Elimination
8/3/2019 The Seven Waste
2/14
Contents of an Operation
Value Added Work
The part of the job the customer wants to pay for
Non Value Added or Hidden Waste
Work that does not add value but is necessary under thecurren opera ng con ons
Work that does not add value and is not necessary
WASTE
The7Wastes2
8/3/2019 The Seven Waste
3/14
What is Value Added Work?
Work that increases the value of a part..e. a w c c anges e , orm or unc on
o geroll
e.g. p essbend
heat treatl
drillf rm
glue
assemble
weld
paint.polish
The7Wastes3
8/3/2019 The Seven Waste
4/14
What is Hidden Waste?
Work that does not add value but is necessar
tool chan eover
under the current operating conditions.
inspection
arts handlin
unavoidable transportation parts
unwra in of urchased arts
The7Wastes4
8/3/2019 The Seven Waste
5/14
What is Obvious Waste?
Work that does not add value Inventory Operator movements
1. Overproduction
.Transportation
2. Waiting
3. Transportation
Process Defects
4. Process5. Inventory
Waiting
6. Operator Movements
7. Defects
Overproduction
The7Wastes5
8/3/2019 The Seven Waste
6/14
77Wastes - Overproduction
1. Makin more than the customer needs
Making in large batches
Overrunning an unstable process
To produce more than is required*
To produce before required*
Overproduction
The 7 Wastes6
8/3/2019 The Seven Waste
7/14
77Wastes - Waiting
2. Man or Machine Waitin
Waiting for material
Waiting for maintenance waiting-time
Waiting for tool change
Waiting for quality check
Waiting for quality checks
Non value added work in c cle
Operator inactivity during cycle
Machine inactivity during cycle
The 7 Wastes7
8/3/2019 The Seven Waste
8/14
77Wastes - Transportation
3. Material/ arts movement Trans ortation
Unnecessary moving or handling of parts.
Handling equipment moving with no parts.
Raw material batch sizes not matching production batch size.
Material stored a long way from point of use.
The 7 Wastes8
8/3/2019 The Seven Waste
9/14
77Wastes - Process
4. Inefficient Process
Wrong choice of equipment
Bad definition of customer's needs Process Useless operations
Excessive movement in process cycle
Excessive set-up or downtime
Slow com licated rocesses
Useless refinement
Bottlenecks Unbalanced process
The 7 Wastes9
8/3/2019 The Seven Waste
10/14
77Wastes - Inventory
5. Lar e Stocks
Stock pile of finished goods
High WIP
Inventory
High raw materials
Excessive racking and warehouse space
The 7 Wastes
10
8/3/2019 The Seven Waste
11/14
Types of Waste - Inventory
Inventory conceals problems, makes control difficult and
Delays action in dealing with faultsand defects
o scures t e opportun ty or mprovement.
Eliminate rocks
Reduces need to face up to fast toolchangeovers
= solve problems
= eliminate waste
capability Goods can become damaged or
Creates unnecessary searching and
movement of materials
Machinebreakdown
Supplier
deliveryLongtravelling
Conceals excess personnel
Takes up space
par s
The7Wastes 11
8/3/2019 The Seven Waste
12/14
77 Wastes - Operator Movements
6. Useless motion
Looking for tools, materials etc
Double handling Operator movements
Turning
Bending
Walking
etc
The 7 Wastes12
8/3/2019 The Seven Waste
13/14
77Wastes - Defects
7. Less than Perfect Parts
Scrap
ReworkDefects
Trimming
Rejects
Delay due to defects
Trans ortation due to defects
Re-inspection and sorting
Rework area inside production process Overtime to meet demand due to poor quality
The 7 Wastes13
8/3/2019 The Seven Waste
14/14
What is Obvious Waste?
Work that does not add value Inventory Operator movements
1. Overproduction
.Transportation
2. Waiting
3. Transportation
Process Defects
4. Process5. Inventory
Waiting
6. Operator Movements
7. Defects
Overproduction
The7Wastes
14