eference Number: PPC/ A/ 1008889/ VN02
SCOTTISH ENVIRONMENT PROTECTION AGENCY
POLLUTION PREVENTION AND CONTROL ACT 1999
POLLUTION PREVENTION AND CONTROL ( SCOTLAND) REGULATIONS 2012
THE REGULATIONS")
NOTICE OF VARIATION TO PERMIT
Permit No: PPC/ A/1008889 ( As Varied)
To: SCOTTISH AND SOUTHERN ENERGY LIMITED
Address: INVERALMOND HOUSE
200 DUNKELD ROAD
PERTH
PHI 3AQ
The Scottish Environment Protection Agency (" SEPA"), in exercise of its powers
under Regulation 46 of the Regulations, hereby gives you notice that it has decided, to vary permit PPC/ A/ 1008889 ( As Varied) granted under the Regulations The
variations are specified in the Schedule to this notice and take effect on 25
OCTOBER 2017
4
Date:
tathorised to sign on behalf of the
Scottish Environment Protection Agency
Right of Appeal
Under Regulation 58 of the Regulations you are entitled to appeal to the Scottish Ministers against theconditions attached to this Notice, except where SEPA has served this Notice to implement a direction
to SEPA of the Scottish Ministers. The bringing of an appeal will not have the effect of suspending theoperation of the conditions attached to this Notice. The procedures and timescales for the making of anappeal are set out in Schedule 8 of the Regulations.
PPC- A- 1008889- VN02- SSE Stornoway Power Station doc
Scottish Environment Protection Agency
PAGE LEFT INTENTIONALLY BLANK
Scottish Environment Protection Agency
Reference Number: PPC/ A/ 1008889NN02
SCOTTISH ENVIRONMENT PROTECTION AGENCY
POLLUTION PREVENTION AND CONTROL ACT 1999
POLLUTION PREVENTION AND CONTROL ( SCOTLAND) REGULATIONS 2012
THE REGULATIONS")
SCHEDULE TO NOTICE OF VARIATION UNDER REGULATION 46( 8)
Operator: Scottish and Southern Energy LimitedPermit Number: PPC/ A/ 1008889 ( As Varied)
Date of Permit: 31 July 2007Variation No: 02
Permit number PPC/ A/ 1008889 ( As Varied) has been varied as follows
1. In the INTERPRETATION OF TERMS, the phrase the Regulations" means The
Pollution Prevention and Control ( Scotland) Regulations 2000;" is deleted and
replaced with: "" the Regulations" means The Pollution Prevention and Control
Scotland) Regulations 2012;"
2. In Schedule 1, condition 1. 1. 5. 1, the number 13. 6" is deleted and replaced with
12. 0".
3. In Schedule 1, condition 1. 1. 5. 1, the table is deleted and replaced with:
Table 1
Engine
Number
1
Thermal Input
MW)
5. 1
Electrical Output
MW)
2. 0
Engine Type
Mirrlees KVSS
2 5. 1 2. 0
4. 6
Mirrlees KVSS
Mirrlees KV Major Mk23 10. 5
5 7. 4 2. 2 Mirrlees KVSS
6 5. 1 2. 0 Mirrlees KVSS
8 9. 2 3. 5 Mirrlees KV Major Mk1
9 12. 0 4. 6 Mirrlees KV Major Mk2
10 9. 5 4. 6 Mirrlees KV Major Mk2
4. In Schedule 1, condition 1. 1. 6. 1. 1 is deleted.
5. In Schedule 1, condition 1. 1. 6. 1. 2, the phrase: " Two Bulk fuel storage tanks, each
of 2000 tonne capacity" is deleted and replaced with: " Three bulk fuel storage tanks
Tank No. 1, No. 2 and No. 3), each of 145 tonne capacity and two daily servicetanks."
6. In Schedule 1, condition 1. 1. 6. 2. 1, the phrase: " Two 30 000 litre bulk tanks," is
deleted and replaced with: " One 30, 000 litre bulk lubrication oil tank and one waste
oil sludge tank,"
7. In Schedule 1, condition 1. 1. 6. 3 the phrase: " and surface waters" is deleted and
replaced with " groundwater arising from the site of the installation".
PPC- A- 1000889- VN02- SSE Slornoway Power Slation docPage 1 of 9
Scottish Environment Protection Agency
Reference Number: PPC/ A/ 1008889NN02
8. In Schedule 1, after condition 1. 1. 6. 4, a new condition 1. 1. 6. 5 is added: " A
Klargester ` forecourt' type interceptor and a Siltbuster Tilted Plate Separator ( TPS)
for treating oil contaminated water from the surface water and oily water drainagesystem."
9. In Schedule 1, condition 1. 1. 6. 7 is deleted.
10. In Schedule 1, 1. 2 Site Plan, the site plan is deleted and replaced with:
1. 2 Site Plan
Y+ fB: If ' f AR
11. In Schedule 2, General Conditions, condition 2. 5 and conditions 2. 5. 1 — 2. 5. 3, are
deleted and replaced with:
2. 5 Resource Utilisation
2. 5. 1 At least every four years, the Operator shall carry out a systematicassessment to determine:
2. 5. 1. 1 how and where raw materials ( including water and fuel) and energyare used within the Permitted Installation;
2. 5. 1. 2 the quantities of raw materials ( including water and fuel) and energyused within the Permitted Installation;
2. 5. 1. 3 how and where material losses and wastes are generated within the
Permitted Installation;
PPC- A- 1008889- VN02- SSE Slornoway Power Slallon doe Page 2 of 9
Scottish Environment Protection Agency
Reference Number: PPC/ A/ 1008889/ VN02
2. 5. 1. 4 the quantities of material losses and wastes are generated within the
Permitted Installation;
2. 5. 1. 5 how and where raw materials ( including water) and energy can beutilised more efficiently within the Permitted Installation to reduceresource use and minimise material losses and waste; and
2. 5. 1. 6 which of the resource efficiency measures identified in 2. 5. 1. 5 will beimplemented at the Permitted Installation during the 4 year
assessment cycle.
2. 5. 2 The assessment required by condition 2. 5. 1 shall be recorded usingthe SEPA " systematic assessment of resource use and efficiencytemplate" ( IED - T- 04), or an equivalent format as agreed by SEPA, and reported to SEPA as specified in Table 2. 3.
2. 5. 3 The operator shall implement the resource efficiency measuresidentified in the systematic assessment within the timescales
specified in the systematic assessment.
2. 5. 4 The information required in 2. 5. 1. 2 and 2. 5. 1. 4 shall be recorded
annually.
2. 5. 5 For the purposes of condition 2. 5. 1 " raw materials, " energy" and
fuel" shall, as a minimum, include the materials listed in Table 2. 4.
12. In Schedule 2, condition 2. 6. 1 the number " 2" is deleted, and replaced with " 4".
13. In Schedule 2, Table 2. 1 - Reporting and Notification Requirements is deletedand replaced with:
Table 2. 1 - Reporting and Notification Requirements
rSummary of
Information to be Condition
Date/ Within period/
Frequency to beDate First
ReportDueReported or Notified
2. 4. 4
Reported
Incident investigation Within 14 days of the Within 14 days of the
report date of the Incident date of the first Incident
unless otherwise agreed unless otherwise agreed
in writing with SEPA in writing with SEPA
Resource utilisation 2. 5. 1 At least every 4 years 31 January 2020
Raw material utilisation
data
2. 5. 2 At least every 4 years 31 January 2020
Waste management 2. 6. 1 At least every 4 years Next report due
review 31 January 2020.
Cessation of Permitted 2. 9. 2 Not later than 2 months Not later than 2 months
Activities prior to cessation prior to cessation
Assessment of noise & 3. 1. 2 At least every 4 years 31 January 2018vibration emissions
Drainage integrity survey 3. 3. 1 Every 5 years 31 January 2018
PPC-A- 1008889- VN02- SSE Stornoway Power Stalion doe
Scottish Environment Protection Agency,
Page 3 of 9
Reference Number: PPC/ A/ 1008889/ VN02
Summary of Date/ Within period/
Information to be Condition Frequency to beDate First
ReportDueReported or Notified Reported
and remediation
assessment
Monitoring of emissions 3. 4. 4 Within 2 months of Within 2 months of
to air receipt of emissions receipt of emissions
report report
Mass emissions to air 3. 4. 6 Annually 31 January 2018
Monitoring of emissions 3. 5. 4 Monthly No reporting requirementto water
Environmental 3. 8. 1 Within 4 weeks of the end Within 4 weeks of the end
monitoring results NO2 of monitoring events of the first monitoringidentified in the sampling event in the samplingplan required by condition plan required by condition3. 8. 6. 3. 8. 6
31 January 2018Environmental 3. 8. 6 31 January 2018monitoring NO2 samplingplan
Environmental 3. 8. 6 Annually 31 January 2019monitoring NO2 samplingplan review
14. In Schedule 3, condition 3. 5. 5 the phrase: " The reviewed sampling plan shall bereported each year for the forthcoming calendar year." is deleted.
15. In Schedule 3, condition 3. 5. 6, the phrases " and report" and " This information
shall be reported in a format agreed in writing with SEPA" are deleted.
16. In Schedule 3, conditions 3. 5. 9; 3. 8. 1; 3. 8. 2; 3. 8. 3; 3. 8. 4; 3. 8. 5; 3. 8. 6; 3. 8. 7;
3. 8. 8; 3. 8. 9 are deleted and replaced with new conditions 3. 8. 1 to 3. 8. 6 inclusive and
Tables 4. 10 and Table 4. 11:
3. 8 Environmental Monitoring
3. 8. 1 The Operator shall carry out Environmental Monitoring for the substancesin Table 4. 10, at or within 10 metres of, the monitoring points specified inTable 4. 10, at the respective frequencies specified in that Table and
subject to the requirements for monitoring specified in Table 4. 11.
3. 8. 2 All of the samples collected in accordance with Condition 3. 8. 1 shall, as far
as is reasonably practicable, be collected at the same time.
3. 8. 3 Where circumstances beyond the control of the Operator prevent the
undertaking of the monitoring as specified ( such as lack of safe access tothe sampling location or the lack of availability of samples), the Operator
shall take all reasonably practicable steps to obtain alternative samples.
PPC- A- 1008009- VN02- SSE Stornoway Power Slallon doc
Scottish Environment Protection Agency
Page 4 of 9
Reference Number: PPC/ A/ 1008889/ VN02
3. 8.4 The monitoring results, with an associated confidence interval shall bereported to SEPA.
3. 8. 5 The Operator shall record the date, time, duration and results of all
monitoring carried out under Condition 3. 8. 1 and report the results asspecified in Table 2. 1. For each result, the report shall include the range of
the parameters specified in Table 4. 10.
3. 8. 6 An environmental monitoring sampling plan shall be implemented andreviewed annually.
Table 4. 10 Environmental Monitorinq Locations and Frequencies
NB 4316 3219
SS
l NB 4316 3217
SS
NB 4316 3215
SS
Sampling Location Methodpoint(s)
Substance SamplingFrequency
Flue Flue Flue
Minimum of 5
Limits for Nitrogen monoxide
locations or as As detailed inAs detailed in sampling
As detailed in
otherwise sampling planplan required NOz
sampling plan
agreed in required by 8. 6Condition 3. 6
11850
required by
writing with Condition 3. 8. 6 Condition 3. 8. 6
SEPA
Table 4. 11 Requirements for Monitorin
Substance Reporting format i Standard / Method
I
As detailed in sampling Diffusion TubesNOz plan required by
condition 3. 8. 6
17. In Schedule 3, Table 4. 1 - Emissions to Air ELVs is deleted and replaced with:
Table 4. 1 - Emissions to Air ELVs
1 liEmission point number 1 2 3
k
Emission source Engines 1, 2, 3 Engines 5, 6 Engines 8, 9, 10
Source of Stack height/ 25. 5/ 0. 92 25. 5/ 0. 92 25. 5/ 0. 92
Emission diameter m
Location on Site Plan Stack 1 Stack 2 Stack 3
from Emission I ( NOx) mg/ Nm3
PPC- A- 1008B89- VN02- SSE Slornoway Power Slation doePage 5 of 9
Scottish Environment Protection Agency
NOR NB 4316 3219
SS
l NB 4316 3217
SS
NB 4316 3215
SSMonitoring
Type of Monitoring
Sampling Location Flue Flue FlueDetails
Limits for Nitrogen monoxideParameters and nitrogen dioxide 1850 1850 11850
from Emission I ( NOx) mg/ Nm3
PPC- A- 1008B89- VN02- SSE Slornoway Power Slation doePage 5 of 9
Scottish Environment Protection Agency
Reference Number: PPC/ A/ 1008889NN02
Source Total Particulate100 100 100
Matter TPM m / Nm3
Carbon monoxide350 350 350
CO) m91Nm3 — — ---
18. In Schedule 3, Table 4. 2 - Emissions to Air Monitoring Requirements is deletedand replaced with:
Table 4.2 - Emissions to Air Monitoring Requirements
Emission
Parameter point
number
Total Particulate 1, 2 and 3
Matter ( TPM)
Nitrogen monoxide 1 1, 2 and 3
and nitrogen
dioxide ( NOx)
Carbon monoxide 1, 2 and 3
Spot Sampling ( SS)
Standard FrequencyOperational
Mode
SRM - BS EN
13284- 1
SRM for BSSee Condition
EN 147923. 4. 5
SRM - BS EN
15058
PPC- A- 1008880- VN02- SSEStornoway Power Sla0on.dea Page 6 of 9
Scottish Environment Protection Agency
Reference Number: PPC/ A/ 1008889/ VN02
19. In Schedule 3, Table 4. 5 - Emissions to Water Environment/ Sewer ELVs is
deleted and replaced with:
Table 4. 5 - Emissions to Water Environment/ Sewer ELVs
Emission point
number _
W1 - W2
Oil -contaminated W2A W213
Frequency
groundwater arising Installation Installation
Source of
Emission
from within the
installation boundary
surface water oily waterdrainage drainage
s))
system system
Destination Stornoway Harbour Stornoway Harbour
Visual
Emission W1 as indicated onW2 as indicated on site plan
location
Source ofNGR
Emission
11Samplinglocation
Free Chlorine
m / I
Oil visual
Oil in water
mg/ 1)
pH
site plan
1 N B43103212 N B43123211
Exit chamber from the Exit chamber Exit chamber
separator from the from the
Klargester Siltbuster
separator separator
N/ A0. 01 N/ A
10
N/ A
No visible oil
5
5to9
20. In Schedule 3, Table 4. 6 - Emissions to Water Environment/ Sewer MonitoringRequirements is deleted and replaced with:
Table 4. 6 - Emissions to Water Environment/ Sewer Monitoring Requirements
Parameter
EmissionTest Reporting
Sampling/ Measurement FrequencyNumber(
Method Formats)) Facility
Oil visual W1 Visual No significant Within the exit Weeklyinspection oil chamber from the
TPS
Oil in water Method A * As mg/ I Within the exit Monthlychamber from the
TPS
pH BS 6068 - As pH units Within the exit Monthly2. 50: 1995 chamber from the
Klargester
interceptor
PPC- A- 1008889- VN02- SSE Stornoway Power Slation doePage 7 of 9
Scottish Environment Protection Agency
Reference Number: PPC/ A/ 1008889/ VN02
Oil visual W2A and
W213
Visual
inspection
No significant
oil
Within the exit
chamber from the
Siltbuster TPS and
the Klargester
interceptor
Weekly
Oil in water Method A * As mg/ I Within the exit Monthlychamber from the
Siltbuster TPS and
the Klargester
interceptor
Total BS 6068 - As mg/ I Within the exit Not less than
Residual 2. 56: 1998 chamber from the 30 minutes and
Oxidant BS EN ISO Klargester not more than 1
Free 7393- interceptor hour after
Chlorine) 2: 1986) draining thesecondary
cooling system
Method A is the applicable analytical method for Hydrocarbon Oil as defined in Environment
Agency Guidance Note M18 and described in " The Determination of Hydrocarbon Oils inWaters by Solvent Extraction, Infra -Red Absorption and Gravimetry 1983" SCA Blue Book 77ISBN 0 11 751728 3)
i Environment Agency Technical Guidance Note ( Monitoring) M18 — monitoring ofdischarges to water and sewer — Version 4 — November 2014
21. In Schedule 3, Table 4. 7 - Mass Emissions to Water Environment is deleted.
22. In Schedule 3, Table 4. 8 - Waste Handling and Storage is deleted and replacedwith:
Table 4. 8 - Waste Handling and Storage
Description of Location of Method of
Waste I Storal I Storage
Oil skimmings from Tilt Waste oil sludge Above
Plate Separators and tank ground tank
Klargester, waste oil,
waste fuel and lube oil
Oil Contaminated
waste
Clip top bins andsealed skip next toengines and skip
next to workshop
Clip top binsand sealed
skip
Maximum
permitted Storage
quantity - Conditions
tonne
20Within tank farm
I containment bund
On impervious
hardstanding
PPC- A- 1008889- VN02- SSE Slornoway Power Slallon. doc Page 8 of 9
Scottish Environment Protection Agency
Reference Number: PPC/ A/ 1008889/ VN02
23. In Schedule 3, Table 4. 9 - Raw Materials Storage is deleted and replaced with:
Table 4. 9 - Raw Materials Storage
PPC- A- 7008089- VN02- SSE Slomowey P~ r S* Jan- On
Scottish Environment Protection Agency
Page 9 of 9
Description; of Lo aaifiiio) o4i, iletblo) d of Permiiiitt+e d Sto)raxge;
Raw Material Stota, gie, St1o, rnie quantity - Co)tid1UJi o) s
taten'ie
Fuel Oil Bulk Tanks No 1, Within above 547 Within tank farm
No 2 and No 3 ground bulk tanks containment bund
and Daily ServiceTanks 1 and 2
Bulk Tank Within above Within tank farmLubricating Oil 30
ground bulk tanks containment bund