Page 1: THE SCOTTISH DATACENTRE SCENE

THE SCOTTISH DATACENTRE SCENE

CHARLIE BOISSEAU27.3.13

Page 2: THE SCOTTISH DATACENTRE SCENE

1. INTRODUCTION2. OUR DATACENTRE JOURNEY3. THE (NOT SO) GRAND TOUR4. CONCLUSIONS

THE SCOTTISH DATACENTRE SCENE

Page 3: THE SCOTTISH DATACENTRE SCENE

FLUENCYEDINBURGH

Page 4: THE SCOTTISH DATACENTRE SCENE

FLUENCYEDINBURGH

Page 5: THE SCOTTISH DATACENTRE SCENE
Page 6: THE SCOTTISH DATACENTRE SCENE
Page 7: THE SCOTTISH DATACENTRE SCENE
Page 8: THE SCOTTISH DATACENTRE SCENE

SPOT THE PROBLEM?

Page 9: THE SCOTTISH DATACENTRE SCENE

THE (NOT SO) GRAND TOUR

Page 10: THE SCOTTISH DATACENTRE SCENE

There’s nothing in Inverness!

INVERNESS

Page 11: THE SCOTTISH DATACENTRE SCENE

ABERDEEN• 2150 ft2

• 800kVA Primary Power

• 630kVA Backup Power

• N+1 Cooling• BT & C&W Fibre

Page 12: THE SCOTTISH DATACENTRE SCENE

ABERDEEN• Tier 3• 3,300 ft2

• 10,000 kVA Total Power

• BT, C&W & SSE Fibre

Page 13: THE SCOTTISH DATACENTRE SCENE

DUNDEE

• Tier 3+• 200 Rack Capacity• 550kVA N+1 Power• 300kVA N+1 UPS• BT, Virgin, SSE, C&W

DUNDEE

Page 14: THE SCOTTISH DATACENTRE SCENE

GLASGOW• 11,000ft2• 200kVA Primary

Power• Soon - 1MVA Power• N+1 Cooling• FM200 Suppression• BT, C&W & Virgin

Fibre

Page 15: THE SCOTTISH DATACENTRE SCENE

GLASGOW• 12,300ft2 Data Floor• 1000kVA Power• BT, Virgin, Thus,

Geo, Level3 & Cogent Fibre

• 0.75kW/m2 Cooling

Page 16: THE SCOTTISH DATACENTRE SCENE

EDINBURGH

• Tier 3• 10,000ft2• 1.2MW Primary

Power• 1.2MW N+1 Backup• FM200 & Argonite

Suppression• BT, Virgin, C&W

Fibre

Page 17: THE SCOTTISH DATACENTRE SCENE

EDINBURGH

• 32,000ft2• Dual 3.2MvA Primary

Power• N+1 Cooling• FM200 Suppression• BT, C&W & Virgin

Fibre

Page 18: THE SCOTTISH DATACENTRE SCENE

(SCOLOCATE)

EDINBURGH

• Tier 3• 75,000ft2• 2 x Primary 3MW

Feeds• Full N+1 Backup

Supply• 14 Fibre Operators• 30+ Carriers

Page 19: THE SCOTTISH DATACENTRE SCENE

DID I MISS ANYONE?NOTABLE ABSENCES:

BT, SSE, VARIOUS BANKS & OTHER PRIVATE DCs

Page 20: THE SCOTTISH DATACENTRE SCENE

CONCLUSIONS

Page 21: THE SCOTTISH DATACENTRE SCENE