9
Studia Quaternaria, vol. 31, no. 2 (2014): 91–99. DOI: 10.2478/squa-2014-0009 THE ROLE OF GEOPHYSICAL ERT METHOD TO EVALUATE THE LEAKPROOFNESS OF DIAPRAGM WALL OF DEEP FOUNDATION TRENCHES ON THE EXAMPLE OF THE CONSTRUCTION OF RETAIL AND OFFICE COMPLEX IN LUBLIN, POLAND Grzegorz Pacanowski 1 , Pawe³ Czarniak 1 , Anna B¹kowska 2 , Rados³aw Mieszkowski 2 , Fabian Welc 3 1 Polish Geological Institute – National Research Institute, Rakowiecka 4, 00-975 Warsaw, Poland, e-mails: [email protected], [email protected] 2 University of Warsaw, Faculty of Geology, Institute of Hydrogeology and Engineering Geology, ¯wirki i Wigury 93, 02-089 Warsaw, Poland, e-mail: [email protected], [email protected] 3 Instytut Archeologii Uniwersytet Kardyna³a Stefana Wyszyñskiego, ul. Woycickiego 1/3, no. 23, 01-938 Warszawa, Poland, e-mail: [email protected]. Abstract This paper addresses the problem of assessing the leakproofness of the bottom of a deep foundation trench, secured by cavity wall, using geophysical methods of electrical resistivity tomography. The study was conducted on a large con- struction project in Lublin, in a place where there are complicated soil-water conditions: the groundwater level is above the proposed depth of foundation trench, the subsoil is heterogeneous, and there are karsted and weathered car- bonate sediments with confined aquifer below the bottom of the trench. A hydraulic fracture occurred at the bottom of the trench during the engineering works, which caused the water flow into the trench. In order to recognize the soil-water conditions the first stage of geophysical measurements of electrical resistivity tomography (ERT) was made. The applied methodology allowed to determine the extent of the hydraulic fracture zone within the bottom of foundation trench. In order to assess the leakproofness of Diaphragm Wall the geophysical ERT measurements were repeated (stage 2) A clear reduction in the value of the electrical resistivity of soils in the area of hydraulic fracture was caused by clay injection. The results of ERT measurements are discussed and graphically presented. Key words: Electrical Resistivity Tomography (ERT), hydraulic fracture, clay injection, foundation trench, complicated soil-water conditions. Manuscript received 5 May 2014, accepted 6 November 2014 INTRODUCTION Geophysical methods began to be used to solve geo- technical problems in the ‘60s and ‘70s of the twentieth cen- tury (Keller & Frischknecht 1966, Bogoslovsky & Ogilvy 1977), mainly the seismic method and the electrical resistiv- ity method. Currently non-invasive geophysical surveys are performed to identify soil-water conditions at the design stage of any large construction project. Geophysical investi- gation can determine or elaborate on: geological structure (Keller & Frischknecht, 1966), elastic soils parameters and degree of consolidation of soils (Foti & Lancellotta, 2003), identification of buried technical infrastructure (Jol et al. 2009), shallow cavities in rock mass (Martínez-Pagán et al., 2013), monitoring of the environment (Sharma, 2002), hy- drogeological conditions (Kirsch, 2009; Brunet et al., 2010), risk of landslides processes (Göktürkler et al., 2008; Hack, 2000), hazards of mining areas (Chambers et al., 2007) and many others (e.g. Kowalczyk, Mieszkowski, 2011 and Barski, Mieszkowski, 2014). In the case of construction projects that are, or will be sited in complicated soil-water conditions (e.g. shallow groundwater level or the impact of soils of low bearing ca- pacity) geophysical monitoring is conducted. Its purpose is to control the soils before and after stabilization works, such as the seal (injection) of clayey slurry or cementing. Geo- physical investigations on structures of this type are de- scribed, in the works of Cardarelli et al. (2007), Farooq et al. (2007), Ramirez et al. (1993), Daily & Ramirez (2000), Santarato et al. (2011) and Slater et al. (2000). The paper focuses on the presentation of the methodol- ogy and results of geophysical ERT method used to deter-

THE ROLE OF GEO PHYS I CAL ERT METHOD TO EVAL U ATE THE ...archive.sciendo.com/SQUA/squa.2014.31.issue-2/squa... · Geo phys i cal meth ods be gan to be used to solve geo-tech ni

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: THE ROLE OF GEO PHYS I CAL ERT METHOD TO EVAL U ATE THE ...archive.sciendo.com/SQUA/squa.2014.31.issue-2/squa... · Geo phys i cal meth ods be gan to be used to solve geo-tech ni

Studia Quaternaria, vol. 31, no. 2 (2014): 91–99.

DOI: 10.2478/squa-2014-0009

THE ROLE OF GEO PHYS I CAL ERT METHODTO EVAL U ATE THE LEAKPROOFNESS OF DIAPRAGM WALL

OF DEEP FOUN DA TION TRENCHES ON THE EX AM PLEOF THE CON STRUC TION OF RE TAIL AND OF FICE COM PLEX

IN LUBLIN, PO LAND

Grzegorz Pacanowski1, Pawe³ Czarniak1, Anna B¹kowska2, Rados³aw Mieszkowski2, Fa bian Welc3

1 Pol ish Geo log i cal In sti tute – Na tional Re search In sti tute, Rakowiecka 4, 00-975 War saw, Poland, e-mails: [email protected], [email protected] Uni ver sity of War saw, Fac ulty of Ge ol ogy, In sti tute of Hydrogeology and En gi neer ing Ge ol ogy, ¯wirki i Wigury 93, 02-089 War saw, Po land, e-mail: [email protected], [email protected] Instytut Archeologii Uniwersytet Kardyna³a Stefana Wyszyñskiego, ul. Woycickiego 1/3, no. 23, 01-938 Warszawa, Poland, e-mail: [email protected].

Ab stractThis pa per ad dresses the prob lem of as sess ing the leakproofness of the bot tom of a deep foun da tion trench, se cured bycav ity wall, us ing geo phys i cal meth ods of elec tri cal re sis tiv ity to mog ra phy. The study was con ducted on a large con -struc tion pro ject in Lublin, in a place where there are com pli cated soil-wa ter con di tions: the ground wa ter level isabove the pro posed depth of foun da tion trench, the sub soil is het er o ge neous, and there are karsted and weath ered car -bon ate sed i ments with con fined aqui fer be low the bot tom of the trench. A hy drau lic frac ture oc curred at the bot tom ofthe trench dur ing the en gi neer ing works, which caused the wa ter flow into the trench. In or der to rec og nize thesoil-wa ter con di tions the first stage of geo phys i cal mea sure ments of elec tri cal re sis tiv ity to mog ra phy (ERT) wasmade. The ap plied meth od ol ogy al lowed to de ter mine the ex tent of the hy drau lic frac ture zone within the bot tom offoun da tion trench. In or der to as sess the leakproofness of Di a phragm Wall the geo phys i cal ERT mea sure ments werere peated (stage 2) A clear re duc tion in the value of the elec tri cal re sis tiv ity of soils in the area of hy drau lic frac ture was caused by clay in jec tion. The re sults of ERT mea sure ments are dis cussed and graph i cally pre sented.

Key words: Elec tri cal Re sis tiv ity To mog ra phy (ERT), hy drau lic frac ture, clay in jec tion, foun da tion trench, com pli catedsoil-wa ter con di tions.

Manu script re ceived 5 May 2014, accepted 6 November 2014

IN TRO DUC TION

Geo phys i cal meth ods be gan to be used to solve geo-tech ni cal prob lems in the ‘60s and ‘70s of the twen ti eth cen -tury (Keller & Frischknecht 1966, Bogoslovsky & Ogilvy1977), mainly the seis mic method and the elec tri cal re sis tiv -ity method. Cur rently non-in va sive geo phys i cal sur veys areper formed to iden tify soil-wa ter con di tions at the de signstage of any large con struc tion pro ject. Geo phys i cal in ves ti -ga tion can de ter mine or elab o rate on: geo log i cal struc ture(Keller & Frischknecht, 1966), elas tic soils pa ram e ters andde gree of con sol i da tion of soils (Foti & Lancellotta, 2003),iden ti fi ca tion of bur ied tech ni cal in fra struc ture (Jol et al.2009), shal low cav i ties in rock mass (Martínez-Pagán et al.,2013), mon i tor ing of the en vi ron ment (Sharma, 2002), hy -drogeolog i cal con di tions (Kirsch, 2009; Bru net et al., 2010),

risk of land slides pro cesses (Göktürkler et al., 2008; Hack,2000), haz ards of min ing ar eas (Cham bers et al., 2007) andmany oth ers (e.g. Kowalczyk, Mieszkowski, 2011 andBarski, Mieszkowski, 2014).

In the case of con struc tion pro jects that are, or will besited in com pli cated soil-wa ter con di tions (e.g. shal lowgroundwa ter level or the im pact of soils of low bear ing ca -pac ity) geo phys i cal mon i tor ing is con ducted. Its pur pose isto con trol the soils be fore and af ter sta bi li za tion works, suchas the seal (in jec tion) of clayey slurry or ce ment ing. Geo -phys i cal in ves ti ga tions on struc tures of this type are de -scribed, in the works of Cardarelli et al. (2007), Farooq et al.(2007), Ramirez et al. (1993), Daily & Ramirez (2000),Santarato et al. (2011) and Slat er et al. (2000).

The pa per fo cuses on the pre sen ta tion of the meth od ol -ogy and re sults of geo phys i cal ERT method used to de ter -

Page 2: THE ROLE OF GEO PHYS I CAL ERT METHOD TO EVAL U ATE THE ...archive.sciendo.com/SQUA/squa.2014.31.issue-2/squa... · Geo phys i cal meth ods be gan to be used to solve geo-tech ni

mine the hy drau lic frac ture zone at the bot tom of the se lectedfoun da tion trench and to con trol the leakproofness of soils inthe bot tom of the trench af ter the sealed works.

CASE-HIS TORY

In 2012, gi ant of fice and ser vice com plex started to bebuilt in Lublin (south-east ern part of Po land). The area ofdeep ex ca va tion was ap prox i mately 2.5 ha (Fig. 1). Lo ca tionof the in vest ment is shown in Fig. 2.

Level of the foun da tion plate was de signed at a depth ofap prox i mately 10 m be low ground sur face (161.2 m abovethe sea level). The trench was pro tected by Di a phragm Wall.At the stage of de sign ing the con struc tion a wide range ofgeotechnical and geo log i cal mea sure ments were con ductedto iden tify the geo log i cal struc ture and to de ter mine the phys -i cal and me chan i cal pa ram e ters of soils: drillings, static prob -ing (CPT) and ba sic lab o ra tory tests of soil sam ples col lecteddur ing drill ing. The in ter pre ta tion of the geo log i cal struc turewas shown in the form of geo log i cal cross-sec tions (Fig. 4) –the un ex plored rock and soil mass be tween the bore holes was in ter po lated. On the ba sis of this in ter pre ta tion it was con -

cluded that the deep en ing of the foun da tion trench and theper for mance of the bot tom plate will not en coun ter any en vi -ron men tal dif fi cul ties. In the spring 2013, while dredg ing inthe north-west ern part of the ex ca va tion, the old pre vi ouslyun iden ti fied piezometer was dam aged by the ex ca va tor. Thispiezometer was used to mon i tor the fis sure wa ter level inCre ta ceous sed i ments. Fis sure wa ter level in the Cre ta ceoussed i ments was un der con sid er able piezometric pres sure: it islevel was drilled ca at 155 m above sea level, while sta bi lizedat ca 166 me ters above sea level and about 5 m above the pro -jected bot tom of the foun da tion trench. As a re sult of fail urethe wa ter rap idly be gan to flood the trench. Dam aged piezo-me ter was sealed quickly, then large em bank ment was piledhigh around it to se cure the bot tom of the trench from ex -pand ing hy drau lic frac ture zone and con tin ued flood ing.This ac tion has stopped the flow of wa ter for a pe riod of timebut also stopped con struc tion works for sev eral months.

It was de cided that the area of fail ure will be sealed by di -a phragm wall made of clayey slurry in jec tions. Sche maticlay out of in jec tion holes around the dam aged piezometer isshown in Fig. 3. In or der to de ter mine the ex tent of hy drau licfrac ture zone it was de cided to con duct geo phys i cal mea sure -ments of sys tem 2D and quasi 3D of elec tri cal re sis tiv ity to -mog ra phy (study of quasi 3D re sults were gen er ated from 2D lines). Af ter clayey slurry in jec tions whithin these zones thecon struc tion works have been com pleted with out ma jor pro-blems in 2013.

THE GE OL OGY

The ge ol ogy of the in vest ment area was iden ti fied bydrill ing and static prob ing to a depth of ap prox i mately 24 m(to 148.2 m above sea level). Drill ing and prob ing (in the to -tal amount of 23) was lo cated mainly around the per im e ter ofthe pro jected di a phragm walls (Fig. 4).The geo log i cal pro file is (from top): anthropogenic em bank ments (of 4 m thick -ness), Qua ter nary or ganic soils (of 4 m thick ness), Qua ter -nary river sands interbedded by al lu vial soils (silty clay andsilt of a thick ness from 3 to 6 m), Neo gene clays and silts (of9–10 m thick ness) and Cre ta ceous car bon ate rocks. The roof

92 G. PACANOWSKI et al.

Fig. 1. View of the NW part of the foun da tion trench.

Fig. 2. Lo ca tion of the ERT geo phys i cal re search area.

Fig. 3. Sche matic lay out of in jec tion holes around the dam agedpiezometer (area of fail ure).

Page 3: THE ROLE OF GEO PHYS I CAL ERT METHOD TO EVAL U ATE THE ...archive.sciendo.com/SQUA/squa.2014.31.issue-2/squa... · Geo phys i cal meth ods be gan to be used to solve geo-tech ni

of Cre ta ceous de pos its is at depth ca 25 m be low ground sur -face (ca 155 m above sea level).

The floor of the Cre ta ceous rocks wasn’t reached.There are two aqui fers in this pro file:– first ground wa ter level, un con fined aqui fer, in Qua ter -

nary river sands, at a depth of 7.5–8 m (ap prox i mately 164 mabove sea level),

– sec ond ground wa ter level, con fined aqui fer, in theCre ta ceous rocks, level oc curred at a depth of about 20–22 m(150–152 m above sea level), while sta bi lized at a depth of5–6 m (166 m above sea level)

Sim pli fied geo log i cal cross-sec tion in the area of fail ureis pre sented in Fig. 4. It should be noted that the lo ca tion ofgeo log i cal bound aries is al most hor i zon tal, and the dif fer entgeo log i cal lay ers have a sim i lar thick ness. There were noero sion cuts de tected.

THE METH OD OL OGY OF ERTMEA SURE MENTS

Geo phys i cal mea sure ments of elec tri cal re sis tiv ity to -mog ra phy (ERT) were con ducted within the foun da tiontrench. Elec tri cal re sis tiv ity to mog ra phy method was de vel -oped in the late twen ti eth cen tury and is widely de scribed bymany re search ers, for ex am ple by Griffiths & Barker (1993)and Loke’a (2012). This method was cho sen be cause of theex pected con trasts in the elec tri cal re sis tiv ity of soils.

Mea sure ments were car ried out in two stages:– Stage 1: Ex tent of hy drau lic frac ture zone within the

bot tom of the foun da tion trench was spec i fied.– Stage 2: Leakproofness of di a phragm wall (clayey

slurry in jec tions) made in the bot tom of the trench (on the ba -sis of step 1) was spec i fied.

GEO PHYS I CAL ERT METHOD 93

Fig. 4. Sim pli fied geo log i cal cross-sec tion in the area of fail ure (above) and geo phys i cal pic ture of ERT mea sure ment (be low). Geo phys i -cal in ves ti ga tions were per formed af ter re mov ing the top layer of em bank ments and or ganic soils.

Page 4: THE ROLE OF GEO PHYS I CAL ERT METHOD TO EVAL U ATE THE ...archive.sciendo.com/SQUA/squa.2014.31.issue-2/squa... · Geo phys i cal meth ods be gan to be used to solve geo-tech ni

The lo ca tion of mea sure ment pro files are shown in Fig. 5.The frac ture zone is sit u ated in the NW part of the trench (Fig. 5).

The mea sure ments were made us ing Terameter LS ap pa -ra tus (man u fac tured by ABEM , Swe den). The di pole-di polear ray was used. This ar ray was cho sen for two rea sons: firstly it gives high den sity of mea sure ment points, sec ondly it al -lows the use of multi-chan nel mea sure ments. Rel a tively

short time of mea sure ments was very im por tant. In the hy -drau lic frac ture zone (north-west ern part of the trench) therewas 2 m in ter val be tween elec trodes and a length of mea sur -ing pro files was lim ited by the length of the foun da tiontrench to the 80 m. Thus the depth of rec og ni tion of dis tri bu -tion of elec tri cal re sis tiv ity in the sub soil was up to ap prox i -mately 13–14 m.

94 G. PACANOWSKI et al.

Fig. 5. Doc u men tary map of ERT mea sure ments.

Page 5: THE ROLE OF GEO PHYS I CAL ERT METHOD TO EVAL U ATE THE ...archive.sciendo.com/SQUA/squa.2014.31.issue-2/squa... · Geo phys i cal meth ods be gan to be used to solve geo-tech ni

Ad di tional mea sure ments were car ried out in the en tiretrench area to de velop a map of the roof of Neo gene co he sivede pos its. This soil layer was par tic u larly im por tant, be causeit pro tects the trench from the con fined aqui fer. Ad di tional

ERT pro files were also made us ing di pole-di pole ar ray, butthe in ter val of the elec trodes was in creased to 3–4 m whichgives a slightly greater depth of pros pect ing.

GEO PHYS I CAL ERT METHOD 95

Fig. 6. Elec tri cal re sis tiv ity cross-sec tion- stage 1, pro file 14.

Fig. 7. Elec tri cal re sis tiv ity cross-sec tion- stage 2, pro file 14 (Ex pla na tions as Fig. 6).

Page 6: THE ROLE OF GEO PHYS I CAL ERT METHOD TO EVAL U ATE THE ...archive.sciendo.com/SQUA/squa.2014.31.issue-2/squa... · Geo phys i cal meth ods be gan to be used to solve geo-tech ni

RE SULTS

RES2Dinv pro gram (Loke, 2012) was used to pro cessthe data re ceived. There are clear con trasts in soils re sis tiv ityin the area cov ered by the ERT mea sure ments:

– a com plex of river sands interbedded by al lu vial soils(silty clay and silt) with resistivities above 50 Wm,

– co he sive soils com plex – Neo gene clays and silts withlow resistivities of 5 to 40 Wm,

– hy drau lic frac ture zone within the co he sive soils com -plex of resitivities from 40 to 70 Wm.

Stage I

ERT mea sure ments al low to clearly iden tify the hy drau -lic frac ture zone (layer IV – Fig. 6). Re fers to pro file 14, at the depth of bot tom of foun da tion trench soils of low re sis tiv itydom i nate – co he sive soils of very low per me abil ity. The hy -drau lic frac ture zone crosses the foun da tion depth in the

40–42 m of pro file length. The value of re sis tiv ity are in -creased in this zone to 60–80 W m and con trasts to the co he -sive soils (5–40 Wm).

In the range of 30–32 m and 65–68 m of pro file lengththere were also dis tin guished soils of be in creased value ofelec tri cal re sis tiv ity. There are prob a bly sat u rated sands.Their pres ence in the bot tom of the foun da tion trench maycause some prob lems dur ing the con struc tion works.

Stage II

ERT mea sure ments showed that di a phragm wall cov -ered the en tire em bank ment and cohesionless soils foundedin the bot tom of the trench (layer II and the sur face layer of V– Fig. 6). The re duc tion of the elec tric re sis tiv ity in the area of hy drau lic frac ture zone, en tire area of em bank ment andcohesionless soils in the bot tom of the trench was noted as are sults of clayey slurry in jec tions (Fig. 7.).

Clayey di a phragm wall re duced anom aly IV at 30–32 m

96 G. PACANOWSKI et al.

Fig. 8. Cross-sec tion of dif fer ences be tween fig. 6 and fig. 7.

Page 7: THE ROLE OF GEO PHYS I CAL ERT METHOD TO EVAL U ATE THE ...archive.sciendo.com/SQUA/squa.2014.31.issue-2/squa... · Geo phys i cal meth ods be gan to be used to solve geo-tech ni

of pro file length, but in creased re sis tiv ity zone at the 65–68 m of pro file length re mained al most un changed.

The com par i son of the dis tri bu tion of elec tri cal re sis tiv -ity for stage 1 and stage 2, and re sis tiv ity de crease af ter in jec -tion works for se lected pro file is pre sented in Fig. 8. Redcolor marks the places where there was the great est change in

per cent age value of re sis tiv ity, white color – where there isthe small est change.

The ef fect of clayey slurry in jec tions is also noted in theother ERT pro files due to the con trast to the re sis tiv ity of thecohesionless soil. Sig nif i cant de crease of electical re sis tiv ityis noted in the lo ca tion of clay injetions (Figs 9, 10) .

GEO PHYS I CAL ERT METHOD 97

Fig. 9. Elec tri cal re sis tiv ity cross-sec tion- stage 2, pro file 3.

Fig. 10. Elec tri cal re sis tiv ity cross-sec tion- stage 2, pro file 4.

Page 8: THE ROLE OF GEO PHYS I CAL ERT METHOD TO EVAL U ATE THE ...archive.sciendo.com/SQUA/squa.2014.31.issue-2/squa... · Geo phys i cal meth ods be gan to be used to solve geo-tech ni

The map of the roof of low-re sis tiv ity soil

In ter pre ta tion of all the ERT pro files and anal y sis ofbore holes and static probes al lowed to pre pare the map of theroof of low-re sis tiv ity sed i ments (Fig. 11). Low re sis tiv ity

soil layer cor re sponds to the co he sive soils of very low per -me abil ity. This layer pro tects the trench from the con finedaqui fer. The depth of the roof of low-re sis tiv ity layer is vari -able and it’s rang ing from 152 m to 165 m above sea level.Two ar eas where the roof of low-re sis tiv ity sed i ments clearly

98 G. PACANOWSKI et al.

Fig. 11. Map of the roof of low-re sis tiv ity soils (co he sive) made on the ba sis of ERT cross-sec tion and ar chi val bore holes.

Page 9: THE ROLE OF GEO PHYS I CAL ERT METHOD TO EVAL U ATE THE ...archive.sciendo.com/SQUA/squa.2014.31.issue-2/squa... · Geo phys i cal meth ods be gan to be used to solve geo-tech ni

de creases were high lighted in Fig. 11. In the area 1 the roofoc curs at ap prox i mately 155 m above sea level – this is theplace where the hy drau lic frac ture oc curred and the wa terflowed to the trench. In the area 2 the roof is ap prox i mately152 m above sea level, at this area a slight flow of wa ter intothe trench was ob served, but it was man aged to be con trolledthe lo cal dewatering.

CON CLU SIONS

The res o lu tion of pre sented meth od ol ogy of ERT mea -sure ments was 2 m hor i zon tally, while ver ti cally it was de -pends on the depth and var ies from 1 m (near the surface) to2 m (at the bot tom part of the cross-sec tion).

Due to the ac cu racy of dis tri bu tion in elec tri cal re sis tiv -ity even mi nor anom a lies, slight vari a tion of li thol ogy, hy -drogeo log i cal con di tions, anthropogenic de pos its or othernon-doc u mented ef fects of hu man ac tiv ity can be de tected.Thus more de tailed and re li able de scrip tion of geo log i calstruc ture and geo log i cal bound aries may be achieved.

The ERT method is rel a tively quick method that en abledthe pre cise non-in va sive iden ti fi ca tion of soil and rock lay ersin the ar eas of com pli cated ge ol ogy, where the con ven tionaldi rect in va sive re search meth ods could not guar an tee the fullrec og ni tion of soil-wa ter con di tions. The in ter pre ta tion ofthe un ex plored rock and soil mass be tween the bore holesmay lead to the con struc tion fail ure both at the stage of con -struc tion works (as in the pre sented ex am ple), but also –mak ing it even more dan ger ous – at the stage of use the com -pleted build ing.

REF ER ENCES

Barski, M., Mieszkowski R., 2014. Up per Ju ras sic large-scale de -bris flow de pos its in interbiohermal bas ins of the spongemegafacies in Po land – new in sights, Neues Jahrbuch FurGeologie Und Palaontologie-Abhandlungen Vol. 272/1, pp47–59

Bogoslovsky, V.A., Ogilvy, A.A., 1977. Geo phys i cal meth ods forthe in ves ti ga tion of land slides. Geo phys ics 42, 562–571.

Bru net, P., Clément, R. , Bouvier Ch. , 2010. Mon i tor ing soil wa tercon tent and def i cit us ing Elec tri cal Re sis tiv ity, To mog ra phy(ERT) – A case study in the Cevennes area, France Jour nal ofHy drol ogy 380 (2010) 146–153. DOI: 10.1016/j.jhydrol.2009.10.032

Cardarelli, E., Cercato, M., Di Filippo, G., 2007. As sess ing foun da -tion sta bil ity and soilstructure in ter ac tion through in te gratedgeo phys i cal tech niques: a case his tory in

Rome (It aly). Near Sur face Geo phys ics 5, 141–147. DOI: 10.3997/1873-0604.2006026

Cham bers, J. E, Wilkinson, P. B., Weller, A. L., Meldrum, P. I.,Ogilvy, R. D, Caunt, S., 2007. Mineshaft im ag ing us ing sur -face and crosshole 3D elec tri cal re sis tiv ity to mog ra phy: A case

his tory from the East Pennine Coal field, UK, Jour nal of Ap -plied Geo phys ics 62, pp 324–337. DOI: 10.1016/j.jappgeo.2007.03.004

Daily, W., Ramirez, A. L., 2000. Elec tri cal im ag ing of en gi neeredhy drau lic bar ri ers. Geo phys ics 65(1):83–94Farooq, M., Kim,J.H., Park, S., Song, Y.S., 2007. Non-de struc tive eval u a tion ofcementgrout by sur face elec tri cal re sis tiv ity method. Advan-ced Non de struc tive Eval u a tion II 1, 599–604.

Foti, S., Lancellotta, R., 2003. Ca pa bil i ties of seis mic tests in soilchar ac ter iza tion. In: Maugeri, M., Nova, R. (Eds.). Gotech-nical anal y sis of seis mic vul ner a bil ity ofmonuments and his -tor i cal sites, pp. 83–98. P´tron Ed i tor, It aly.

Göktürkler, G., Balk Aya, Ç. & Erhan, Z., 2008. Geo phys i cal in ves -ti ga tion of a land slide: The Alt nda land slide Site, zmir (west -ern Tur key). Jour nal of Ap plied Geo phys ics, 65 (2): 84–96.DOI: 10.1016/j.jappgeo.2008.05.008

Griffiths, D. H., Barker, R. D., 1993. Two-di men sional re sis tiv ityim ag ing and mod el ling in ar eas of com plex ge ol ogy. Jour nal of Ap plied Geopgysics, no. 29, pp. 211–226.

Hack, R., 2000. Geo phys ics for slope sta bil ity. Sur veys in Geo -phys ics 21, 423–448.

Jol, H.M. (Ed.), 2009. Ground Pen e trat ing Ra dar: The ory and Ap -pli ca tion, 1st ed., Elsevier.

Kirsch, R., (Ed.), 2009. Ground wa ter Geophisics, A Tool for Hy -dro-ge ol ogy, 2en ed., Springer.

Keller, G.V. & Frischknecht F.C., 1966. Elec tri cal meth ods in geo -phys i cal pros pect ing. Pergamon Press Inc., Ox ford.

Kowalczyk S., Mieszkowski, 2011. Okreœlanie sp¹gu gruntóworganicznych metodami geofizycznymi na przyk³adzie dwóch poligonów badawczych na Ni¿u polskim, Biuletyn Pañstwo-wego Instytutu Geologicznego Tom 446/1 r. 2011, str. 191–198 Loke, M. H., 2012. Tu to rial: 2-D and 3-D elec tri cal imag -in ing sur veys, Geotomo Soft ware, Ma lay sia.

Martínez-Pagán, P., Gómez-Ortiz, D., Martín-Crespo, T., Manteca, J.I. , Rosique, M., 2013. The elec tri cal re sis tiv ity to mog ra phymethod in the de tec tion of shal low min ing cav i ties. A casestudy on the Vic to ria Cave, Cartagena (SE Spain), En gi neer ing Ge ol ogy 156, 1–10. DOI: 10.1016/j.enggeo.2013.01.013

Ramirez, A, Daily, W, Labrecque, D, Owen, E, Chesnut, D.,1993.Mon i tor ing an un der ground steam in jec tion pro cess us ingelec tri cal re sis tance to mog ra phy. Wa ter Resour Res 29(1):73–87Schueremans, L., Van Rickstal, F., Verderickx, K., VanGemert, D., 2003. Eval u a tion of ma sonry con sol i da tion bygeo-elec tri cal rel a tive dif fer ence re sis tiv ity map ping.RILEMMa te ri als & Struc tures 36, 46–50.

Santarato, G., Ranieri, G., Occhi, M., Morelli, G., Fischanger, F.,Gualerzi, D., 2011. Three-di men sional Elec tri cal Re sis tiv ityTo mog ra phy to con trol the in jec tion of ex pand ing res ins forthe treat ment and sta bi li za tion of foun da tion soils, En gi neer -ing Ge ol ogy 119 , 18–30 pp. DOI: 10.1016/J.ENGGEO.2011.01.009

Sharma, P.V., 2002. En vi ron men tal and en gi neer ing geo phys ics.Cam bridge Uni ver sity Press, Cam bridge, UK. 475 pp.

Slat er, L., Binley, A., Daily, W., John son, R., 2000. Cross-holeelec tri cal im ag ing of a con trolled sa line tracer in jec tion. Jour -nal of Ap plied Geo phys ics 44, 85–102.

GEO PHYS I CAL ERT METHOD 99