The Role of Defect Elimination in Reducing Hazard Exposure
Presented by: Stuart Tomlins
Callide Mine
Context
Callide Mine…… 10 Mtpa open cut thermal coal Located 1.5hrs S.W. of Rockhampton 450 full time employees Overburden is primarily removed by 2 draglines, 1
shovel & 1 excavator The excavator & shovel are supported by a fleet of 15
x 270t payload rear dump trucks (EH4500’s)
This presentation discusses the EH4500 truck fleet improvement project & assesses the impact on hazard exposure
Truck Fleet Availability by Year
…………..required action
3 years of declining performance…………..EH4500 Fleet Availability 2003- Q1, 2008
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
2003 2004 2005 2006 2007 Q1, 2008Year
EH
45
00
Fle
et
Av
aila
bilit
y (
%)
Actual Target
Taking Action
To reverse the trend a number of processes commenced to address the EH4500 availability:
Reliability data analysis * Dedicated team assigned to plan and execute
the defect backlog reduction* Scheduled service process review Defect elimination* Hitachi EH4500 users forum
Reliability Analysis of EH4500 DowntimeTop 20 downtime components for EH4500 fleet July to Dec 07
0
200
400
600
800
1000
1200E
ng
ine
fa
ult
Tyre
s
Axle
/dri
ve
s
Air
co
nd
itio
ne
r
Fro
nt w
he
el B
ea
rin
g/H
ub
Sie
me
ns lin
k/ fa
ult
Co
ola
nt le
ak/lo
w
En
gin
e c
od
e
Blo
we
r
Str
ut
Bra
ke
s/r
eta
rde
r
Min
or
ma
inte
na
nce
(b
lan
k)
Ste
el w
ork
/Tra
y
Fu
el ta
nk/h
yd
rau
lic ta
nk
Oil le
ak
Ste
eri
ng
Lu
be
Fa
ult
Ele
ctr
ica
l fa
ult
Ho
ist C
ylin
de
r
Sie
me
ns 1
23
Type of downtime
Ho
urs
Current Performance
Pareto Analysis Critical Issues
How to reduce ‘Wait Labour’ delays for mechanical repairs to an acceptable level.
How to effectively manage the backlog, completing defects in conjunction with the PM schedule.
How to reduce ‘Wait Labour’ delays for tyre maintenance to an acceptable level.
How to improve technical skills of workforce to reduce trouble shooting time on Engine Faults.
How to implement product improvements with minimal impact to production.
How to structure the department to support the truck fleet on 7DR
How to improve focus and urgency around the performance of the rear dump fleet.
How to engage Hitachi and improve their focus on improving fleet reliability.
Problem Statement Action Who By When Performance Measures Status
Reduce downtime related to Tyre Management BI Project - Tyre life improvement Rod Nichols 30/05/2008
↑ in Scrap tyre life, ↓ in tyres scrapped due to cuts.
Delayed
Extend Bridgestone tyre fitter coverage to 7 days / wk Stuart Tomlins 30/04/2008 ↓ in 'Wait Labour' delays. Park. Too expensive.
Scheduled tyre changes integrated into Mobile Maintenance Schedule Sven Gronbach 30/03/2008 ↑ Availability Parked. No value at this stage.
Complete installation of double gutter rims. (7 Trucks) Sven Gronbach 30/05/2008 ↑ Availability Complete
Review Tyre Specification & application for operation in Trap Gully Stuart Tomlins 1/04/2008 ↑ in Scrap tyre life Completed. No problems.
Reduce downtime related to Engines Engage one Detroit fitter Mon-Fri for engine fault finding and maintenance. Stuart Tomlins 3/03/2008 ↑ Availability
Complete
Conduct engine specific training (Improve the technical skills of maintenance personnel) Stuart Tomlins 30/05/2008 ↑ Availability
Not done yet. Currently doing stat training.
Review the level of routine & PEX spares held at site and Detroit in Mky. Stuart Tomlins 1/04/2008 ↓ in 'Wait Parts' delays.Complete
Develop contingency plan for engine repower on Rear Dump 1154 Stuart Tomlins 17/03/2008↑ Availability, ↓ in 'Wait Parts' delays.
Complete
Improve driveline reliabilityImplement contamination control for final drives by implementing an oil filtration process. Danny Jamieson 1/04/2008 ↑ Availability
Complete
Review final drive oil specification with Hitachi & Shell wrt extending component life. Danny Jamieson 17/03/2008 ↑ Availability
Complete
Engage Hitachi (OEM) to improve Wheel motor and grid blower reliability. Danny Jamieson 1/06/2008 ↑ AvailabilityModifications being trialled
Improve Air Conditioner system reliability Independent A/C specialist to review OEM system. Danny Jamieson 7/04/2008 ↑ Availability
Parked. A/C performance has improved thru other actions.
Conduct a review of A/C spares holding onsite Stuart Tomlins 1/04/2008 ↓ in 'Wait Parts' delays. Complete
Update maintenance strategy to include a 12mth major service. Sven Gronbach 1/04/2008 ↑ Availability Complete
Implement 'known' EH4500 Product Improvements
Implement the following electrical updates : Seimens Data isolators, 5XH plug upgrade to main alternator & Temp sensor upgrade to wheel motors. Stuart Tomlins 1/05/2008 ↑ Availability
Complete
Implement bearing assembly upgrades to main blower. Stuart Tomlins 1/05/2008 ↑ Availability Complete
Implement front wheel bearing retainer plate upgrade. Stuart Tomlins 1/05/2008 ↑ Availability Complete
Increase focus and urgency on executing the maintenance strategy.
Dedicated Supervisor allocated to EH4500 for two months period to drive scheduled maintenance tasks and generate focus on completing maintenance backlog. Stuart Tomlins 1/05/2008
↑ Availability, ↓ in 'Wait Labour' delays.
Complete
Engage dedicated tradesmen (2) for a two month period. Stuart Tomlins 10/03/2008↑ Availability, ↓ in 'Wait Labour' delays.
Complete
Conduct Daily Downtime & Planned Work compliance reviews identifing corrective actions. (2 month period) Stuart Tomlins 10/03/2008 ↑ Availability
Complete
Communicate improvement plan & weekly fleet performance to crews Stuart Tomlins 15/03/2008↑ Availability, ↓ in 'Wait Labour' delays.
Complete
Modify the Maintenance Structure to support EH4500 fleet operating on 7DR Sean Halliday 1/04/2008
↑ Availability, ↓ in 'Wait Labour' delays.
Complete
Increase support and focus from Hitachi
Review the onsite Hitachi Project Managers role and expectations to align with Callides requirements. 17/03/2008 ↑ Availability
Complete
Hold monthly EH4500 improvement meetings with Hitachi. Danny Jamieson 4/03/2008 ↑ Availability Complete. Users forum.
Improvement Plan
Hitachi EH4500 Rear Dump Improvement Plan
What if Operator induced maintenance events are not minimised eg. tyre damage, operational conditions impacting on fatigue life of chassis.
Hitachi Availability 2003 - 2008
0
20
40
60
80
100
2003 2004 2005 2006 2007 2008
Year
Pe
rce
nta
ge
2003 included trucks 1151-11562004 included trucks 1151-1160
2005 - 2008 included trucks 1151-1164 (full fleet)
Top 20 downtime components for EH4500 fleet July to Dec 07
0
200
400
600
800
1000
1200
Type of downtime
Ho
urs
Hitachi Availability 2005 - 2008
0
20
40
60
80
100
Jan-05
Mar-05
May-05
Jul-05
Sep-05
Nov-05
Jan-06
Mar-06
May-06
Jul-06
Sep-06
Nov-06
Jan-07
Mar-07
May-07
Jul-07
Sep-07
Nov-07
Jan-08
Month/Year
Per
cen
tag
e
EH4500 Availability Budget EH4500 Availability Budget
Defect backlog reduction
Improvement Project Focused on…..•Reducing Work Order backlog•Implementing a number of improvements
This was done by…..•Developing a plan•Assigning a dedicated supervisor & labour resource•Focussed effort to reduce backlog
EH4500 Availability vs Workorder Backlog
120
140
160
180
200
220
240
260
280Ja
n-0
8
Fe
b-0
8
Ma
r-0
8
Apr
-08
Ma
y-0
8
Jun-
08
Jul-0
8
Aug
-08
Sep
-08
Oct
-08
Nov
-08
Dec
-08
Jan-
09
Fe
b-0
9
Ma
r-0
9
# o
f O
uts
tan
din
g J
ob
s
60%
65%
70%
75%
80%
85%
90%
95%
100%
Fle
et
Ava
ila
bili
ty (
%)
Work Orders MA% One Year Target (%) Three Year Target (%)
Maintenance Injury Rates Through the Projects Duration
Total Maintenance Injuries vs Availability on Trucks
60%
65%
70%
75%
80%
85%
90%
Jan-
08
Feb
-08
Mar
-08
Apr
-08
May
-08
Jun-
08
Jul-0
8
Aug
-08
Sep
-08
Oct
-08
Nov
-08
Ava
ilab
ility
(%
)
0
1
2
3
4
5
6
7
Inju
ry M
ov
ing
Av
era
ge
Truck Fleet Availability Total Injuries in Maintenance 2 per. Mov. Avg. (Total Injuries in Maintenance)
Defect Elimination Campaign
Some perspective
2831 defects over 12 month period (EH4500)
Estimate at least 5 hazards per defect
14155 hazards on 1 fleet
Hazard exposure
Risk = Consequence x Likelihood
Reduced exposureDefect elimination
Example Defect Elimination Projects
Problem-5XH Alternator Plugs ground faults
Root Cause
Dust & water ingress from poor plug location & inadequate sealing
Solution
•Hard wire cables into termination strip
•Replace plug with gland plate
Benefit
•Reduced downtime (34hrs/yr)
•Reduce maintenance costs
•Reduced hazard exposure
Root Cause
•Oil viscosity too low
•Wear metal generated causing wide spread deterioration
Solution
•Change to costly synthetic lube
•Implement kidney filtration
Benefit
•Reduced gear and bearing wear
•Maximise life of oil & final drives components
•Reduce hazard exposure by extending the time between maintenance & reducing failures
Problem – Premature final drive failures
Root Cause
Poor light location
Solution
Relocate the light position to under the rock deflector shield
Benefit
Reduced downtime by 50hrs per yr
Reduced maintenance costs
Reduced hazard exposure fixing these lights
Problem – Reverse Light Damage
Root Cause
Extended service duration due to testing method required to ensure starter motors are both functioning
Benefit
•Reduction of 40 hours servicing per year
•Reduced hazard exposure
Solution
By installing 2 switches in the cab, the serviceman can turn one starter motor off via the new switches, test with ignition switch. Repeat for the second starter motor. The red guards give a visible indication of the position of the switch to overcome leaving in the wrong position
Problem – Starter Motor Testing Duration
Root Cause
The cause is due to the recharge points facing towards the rear of the truck. Access via a mobile platform is impeded by the steering arm
Benefit
•Safer access of existing engine platform to check / recharge struts
•Reduction of 15 minutes per service on each truck
Solution
By rotating the struts around 180 degrees, this then allows the access via the engine bay stairs/platform
Problem – Difficult access to check pressure & re-charge front struts
Problem – Hydraulic contamination from lift cylinder seal erosion
Root Cause
Design of radiator fan causes exhaust dust to erode cylinder rod & seals
Solution
Install Kevlar seal savers to the lift cylinders to prevent erosion and contamination
Benefit
•Reduced contamination levels in the hydraulic system which will reduce the failure rate on the hydraulic pumps and cylinders
•Reduced hazard exposure are change outs will occur less frequently
Seal Saver Fitted
The benefits of the defect removal & elimination program are:
Reduced unplanned callouts to equipment in the field
Better hazard control in planned work situations
Reduced exposure means reduced risk
Reduced maintenance costs
Increased asset performance
Cultural shift
Great teamwork and energy in finding solutions
Summary
Defect backlog management and defect elimination are key factors in reducing hazard exposure for tradespeople
Build momentum by involving your trades teams
Solutions are generally inexpensive, simple & effective