AIPCN-PIANC – Marseille May 2013 1 THE RHONE TRAFFIC MANAGEMENT CENTER

THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 1

THE RHONE TRAFFIC MANAGEMENT CENTER

Page 2: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 2

1. Overview of CNR

2. Project context

3. Technical aspects

4. First feed back

THE RHONE TRAFFIC MANAGEMENT CENTER

Page 3: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 3

1. OVERVIEW OF CNR

Page 4: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 4

THE RHONE RIVER

RHIN

SEINE

MOSELLE

PARISPARIS

RHÔNE

SAÔNE

FRANCE

Grand Port maritime de

Marseille

LYON

Page 5: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 5

CNR --> Rhône concession since 1933

Main key areas

ENERGY PRODUCER100 % renewable

hydro / wind / solar NAVIGATION330 km14 locks

IRRIGATIONAND ENVIRONMENT

ENGINEERING

OVERVIEW OF CNR

Page 6: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 6

OVERVIEW OF CNR

15 billion KWh / year

2nd largest french electricity producer

25 % of french hydropower production

3 % of french electricity production

PRODUCTION

Page 7: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 7

THE RHONE WATERWAY

Navigation between Lyon and the sea

� 330 km of large gauge waterway

� 13 river locks (190 x 12 x 3 m)

� 1 maritime lock (135 X19X 5.50 m)

� 1 lifting bridge

� Air clearance :6.30m

� Water depth: 3m

19 dams

14 locks

19 power plants

SAONE

RHONE

Lyon

Grand Port maritime de

Marseille

Page 8: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 8

RHONE TRAFFIC DATADATA 2012

� 5.1 million tons loaded

� 1 700 million tons x km

� 72 000 TEU

� 95 000 lock crossings (8 500 by night)

� 6 200 boats par year and per lock

0,000

1,000

2,000

3,000

4,000

5,000

6,000

7,000

1992

1993

1994

1995

1996

1997

1998

1999

2000

2001

2002

2003

2004

2005

2006

2007

2008

2009

2010

2011

2012

Trafic Marchandises Rhône en Mt

Page 9: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 9

2. PROJECT CONTEXT

Page 10: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013

MODERNIZE THE WATERWAY

� CNR wishes to be considered as an exemplary concessionary , especially for its navigation activity,

� Adapt to traffic changes,

� Take into account increased concern for the safety of transport,

� Improve information for skippers and loaders,

� Transform the lock keeper activity.

Page 11: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013

MODERNIZE THE WATERWAY

Implantation of a center in Châteauneuf du Rhône

Monitor the waterway traffic conditions

Give information in real time

Manage traffic during flood periods

Improve services to skippers through the AIS system to be implemented

Organize and operate

Page 12: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 12

3. TECHNICAL ASPECTS

Page 13: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013

FLEXIBILITY: any lock can be operated from any workstation.

VERSATILITY : adjust the number of operators according to the period (day-night, winter-summer)

STAFF : strengthening the local operating teams to operate the lock in case of malfunction.

TECHNICAL ASPECTS

Page 14: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 14

LOCKS

CENTER CGN

PB VS SA GN BV BE LN CH BO CA AV BC BA SL

Central SCADA

OP1 OP2 OP3 OP4 OP5 OP6 OP7 Chief

INNOVATION

Private fiber optical network (1Gbyte/s)

Page 15: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013

� The center is open 24/7

� 8 identical workstations.

� from 5 am to 10 pm : 5 ou 6 operators and one chief-operator.

� from10 pm to 4 am: 3 operators and one chief operator.

� Complete staff : 39 people : 4 teams - 3x8 and 3 teams - 2x8 and 3 managers

Audit février

2011

ORGANIZATION

Page 16: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 16

ORGANIZATION

19 dams

19 power plants

14 locks

BEFORE

Open from 5 am to 9 pmAFTER

Open 24/7

Page 17: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 17

OPERATE MONITOR• 2 locks simultaneously

• High vigilance required

• Step by step processing

• A selection of locks simultaneously

• Radio VHF or phone communication to survey approaching boats

FLEXIBILITY

TWO TYPES OF ACTIONS

Page 18: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 18

Remote control

AUDIOradio VHF, phone,

loudspeakers

4 SYSTEMS ON A LOCK

SAFETY emergency stop

VIDEOCameras, monitoring

INNOVATION

Page 19: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013

INTERFACES OPERATEURS

A specific audio interface was developed integrating phone, VHF

and loudspeakers

Page 20: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 20

THE AUDIO SYSTEM

Page 21: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013

15 cameras per lock provide a precise vision of the different parts of the lock

VIDEO SYSTEM

Page 22: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013

In addition to operator interfaces, an emergency st op system is implemented in the center

The system allows the emergency stopand triggers the fire protection system ofthe lock (chamber and mirador)

SAFETY

Page 23: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 23

A WORK STATION

Page 24: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 24

A WORK STATION IN THE CENTER

Page 25: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 25

SCHEDULE

INNOVATION

April 2009 : CGN + 2 locks

November 2009 : CGN + 2 +3 locks

November 2010 : CGN + 2 +3 + 5 locks

May 2012 : CGN + 2 +3 + 5+ 4 locks

Page 26: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013 26

4. FIRST FEED BACK

Page 27: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013

FIRST FEED BACK

• A socially challenging project

� Lock-keepers and technicians involved in the project sincethe first design steps and in the preliminary risk studies

� New jobs + interesting

� A complete reorganization of the navigation activity

� A very important training program (300 people)

• Manageable technical challenges

� Audio system development

� Deployment rate in conjunction with the reorganization of the operational units

Page 28: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013

FIRST FEED BACK

• Action consistency, improved information exchanges

• Ongoing Improvement process:

- correcting first dysfunctions

- changing operators habits

- adapting operation rules

Page 29: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013

TRAFFIC MANAGEMENT

Next step: traffic management

� Optimize travel time with a better management of the lockages

� Identify abnormal situations

� To alert and inform

Page 30: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013

Traffic management

� Where are the boats?

� Where will they be in 15-30 minutes ?

� How to organize and optimize lockages (order of arrival, hazardous material transportation rules, leisure boats)

TRACKING TOOLS

� VHFcalls (difficult to precisely locate the calling boat), � last recorded lockage and estimated transit time,

� locks and river cameras (not a full coverage),

� AIS deployed in 2013, real-time monitoring of boats position combined with tracking software

Page 31: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013

Gestion du trafic du Rhône

GTR Software

Page 32: THE RHONE TRAFFIC MANAGEMENT CENTER - pianc-jp.orgpianc-jp.org/news/images/13_e_p_2013MedDays_AIPCN... · AIPCN-PIANC – Marseille May 2013 FIRST FEED BACK • A socially challenging

AIPCN-PIANC – Marseille May 2013

Areas of work- Cooperation

� Develop exchanges of information with the surrounding systems (river and sea ports, others waterways),

� Simulation software to optimize lockages,

� Integrate the different sytems and simplify