Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
AIPCN-PIANC – Marseille May 2013 1
THE RHONE TRAFFIC MANAGEMENT CENTER
AIPCN-PIANC – Marseille May 2013 2
1. Overview of CNR
2. Project context
3. Technical aspects
4. First feed back
THE RHONE TRAFFIC MANAGEMENT CENTER
AIPCN-PIANC – Marseille May 2013 3
1. OVERVIEW OF CNR
AIPCN-PIANC – Marseille May 2013 4
THE RHONE RIVER
RHIN
SEINE
MOSELLE
PARISPARIS
RHÔNE
SAÔNE
FRANCE
Grand Port maritime de
Marseille
LYON
AIPCN-PIANC – Marseille May 2013 5
CNR --> Rhône concession since 1933
Main key areas
ENERGY PRODUCER100 % renewable
hydro / wind / solar NAVIGATION330 km14 locks
IRRIGATIONAND ENVIRONMENT
ENGINEERING
OVERVIEW OF CNR
AIPCN-PIANC – Marseille May 2013 6
OVERVIEW OF CNR
15 billion KWh / year
2nd largest french electricity producer
25 % of french hydropower production
3 % of french electricity production
PRODUCTION
AIPCN-PIANC – Marseille May 2013 7
THE RHONE WATERWAY
Navigation between Lyon and the sea
� 330 km of large gauge waterway
� 13 river locks (190 x 12 x 3 m)
� 1 maritime lock (135 X19X 5.50 m)
� 1 lifting bridge
� Air clearance :6.30m
� Water depth: 3m
19 dams
14 locks
19 power plants
SAONE
RHONE
Lyon
Grand Port maritime de
Marseille
AIPCN-PIANC – Marseille May 2013 8
RHONE TRAFFIC DATADATA 2012
� 5.1 million tons loaded
� 1 700 million tons x km
� 72 000 TEU
� 95 000 lock crossings (8 500 by night)
� 6 200 boats par year and per lock
0,000
1,000
2,000
3,000
4,000
5,000
6,000
7,000
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
2009
2010
2011
2012
Trafic Marchandises Rhône en Mt
AIPCN-PIANC – Marseille May 2013 9
2. PROJECT CONTEXT
AIPCN-PIANC – Marseille May 2013
MODERNIZE THE WATERWAY
� CNR wishes to be considered as an exemplary concessionary , especially for its navigation activity,
� Adapt to traffic changes,
� Take into account increased concern for the safety of transport,
� Improve information for skippers and loaders,
� Transform the lock keeper activity.
AIPCN-PIANC – Marseille May 2013
MODERNIZE THE WATERWAY
Implantation of a center in Châteauneuf du Rhône
Monitor the waterway traffic conditions
Give information in real time
Manage traffic during flood periods
Improve services to skippers through the AIS system to be implemented
Organize and operate
AIPCN-PIANC – Marseille May 2013 12
3. TECHNICAL ASPECTS
AIPCN-PIANC – Marseille May 2013
FLEXIBILITY: any lock can be operated from any workstation.
VERSATILITY : adjust the number of operators according to the period (day-night, winter-summer)
STAFF : strengthening the local operating teams to operate the lock in case of malfunction.
TECHNICAL ASPECTS
AIPCN-PIANC – Marseille May 2013 14
LOCKS
CENTER CGN
PB VS SA GN BV BE LN CH BO CA AV BC BA SL
Central SCADA
OP1 OP2 OP3 OP4 OP5 OP6 OP7 Chief
INNOVATION
Private fiber optical network (1Gbyte/s)
AIPCN-PIANC – Marseille May 2013
� The center is open 24/7
� 8 identical workstations.
� from 5 am to 10 pm : 5 ou 6 operators and one chief-operator.
� from10 pm to 4 am: 3 operators and one chief operator.
� Complete staff : 39 people : 4 teams - 3x8 and 3 teams - 2x8 and 3 managers
Audit février
2011
ORGANIZATION
AIPCN-PIANC – Marseille May 2013 16
ORGANIZATION
19 dams
19 power plants
14 locks
BEFORE
Open from 5 am to 9 pmAFTER
Open 24/7
AIPCN-PIANC – Marseille May 2013 17
OPERATE MONITOR• 2 locks simultaneously
• High vigilance required
• Step by step processing
• A selection of locks simultaneously
• Radio VHF or phone communication to survey approaching boats
FLEXIBILITY
TWO TYPES OF ACTIONS
AIPCN-PIANC – Marseille May 2013 18
Remote control
AUDIOradio VHF, phone,
loudspeakers
4 SYSTEMS ON A LOCK
SAFETY emergency stop
VIDEOCameras, monitoring
INNOVATION
AIPCN-PIANC – Marseille May 2013
INTERFACES OPERATEURS
A specific audio interface was developed integrating phone, VHF
and loudspeakers
AIPCN-PIANC – Marseille May 2013 20
THE AUDIO SYSTEM
AIPCN-PIANC – Marseille May 2013
15 cameras per lock provide a precise vision of the different parts of the lock
VIDEO SYSTEM
AIPCN-PIANC – Marseille May 2013
In addition to operator interfaces, an emergency st op system is implemented in the center
The system allows the emergency stopand triggers the fire protection system ofthe lock (chamber and mirador)
SAFETY
AIPCN-PIANC – Marseille May 2013 23
A WORK STATION
AIPCN-PIANC – Marseille May 2013 24
A WORK STATION IN THE CENTER
AIPCN-PIANC – Marseille May 2013 25
SCHEDULE
INNOVATION
April 2009 : CGN + 2 locks
November 2009 : CGN + 2 +3 locks
November 2010 : CGN + 2 +3 + 5 locks
May 2012 : CGN + 2 +3 + 5+ 4 locks
AIPCN-PIANC – Marseille May 2013 26
4. FIRST FEED BACK
AIPCN-PIANC – Marseille May 2013
FIRST FEED BACK
• A socially challenging project
� Lock-keepers and technicians involved in the project sincethe first design steps and in the preliminary risk studies
� New jobs + interesting
� A complete reorganization of the navigation activity
� A very important training program (300 people)
• Manageable technical challenges
� Audio system development
� Deployment rate in conjunction with the reorganization of the operational units
AIPCN-PIANC – Marseille May 2013
FIRST FEED BACK
• Action consistency, improved information exchanges
• Ongoing Improvement process:
- correcting first dysfunctions
- changing operators habits
- adapting operation rules
AIPCN-PIANC – Marseille May 2013
TRAFFIC MANAGEMENT
Next step: traffic management
� Optimize travel time with a better management of the lockages
� Identify abnormal situations
� To alert and inform
AIPCN-PIANC – Marseille May 2013
Traffic management
� Where are the boats?
� Where will they be in 15-30 minutes ?
� How to organize and optimize lockages (order of arrival, hazardous material transportation rules, leisure boats)
TRACKING TOOLS
� VHFcalls (difficult to precisely locate the calling boat), � last recorded lockage and estimated transit time,
� locks and river cameras (not a full coverage),
� AIS deployed in 2013, real-time monitoring of boats position combined with tracking software
AIPCN-PIANC – Marseille May 2013
Gestion du trafic du Rhône
GTR Software
AIPCN-PIANC – Marseille May 2013
Areas of work- Cooperation
� Develop exchanges of information with the surrounding systems (river and sea ports, others waterways),
� Simulation software to optimize lockages,
� Integrate the different sytems and simplify
AIPCN-PIANC – Marseille May 2013 33
MERCI POUR VOTRE
ATTENTION
www.inforhone.fr