Upload
karin-shepherd
View
217
Download
0
Embed Size (px)
DESCRIPTION
3 Reasons to be Watchful zGovernment Performance Results Act (GPRA): zCongressional expectations zPITAC/NGI expectations zConstituent expectations zNetwork research zPopulism/elitism zInfrastructure/research zCultures
Citation preview
The Rest of the Story...
William F. Decker, Program DirectorAdvanced Network InfrastructureNSF CISE/ANIRMailto: [email protected]: http://www.cise.nsf.gov/anir
2
Synergy!
Program
Awards
Results
3
Reasons to be WatchfulGovernment Performance Results Act
(GPRA): http://www.nsf.gov/od/gpra/start.htmCongressional expectationsPITAC/NGI expectationsConstituent expectationsNetwork researchPopulism/elitismInfrastructure/researchCultures
4
Reasons to be OptimisticSupportive partnershipsPublic trust; bipartisan
supportNSF leadershipPITAC and IT2
Community track recordCurrent status of the
program
5
What Do We Know?Some knowns:
Two backbones Numbers of awards International
connections Campus connections
plans Some performance
information Planned applications
Some unknowns: Long-term
connections plans Status of campus
engineering plans; delivery to researchers
Performance results Applications results
and measures vPI plans
6
High Performance Connections Awards (as of 4/12/99) -- 154 Sites
1,0
1,0
2,2 (DC)
Non-EPSCoR EPSCoR
2,1
2,2
18,17
1,0
1,0
3,0
2,1
1,0
2,1
2,1
3,2
2,1
2,2
7,5
2,2
1,1
2,2
1,1
2,2
2,2
3,1
2,0
2,2
5,5
1,0
5,4
3,3
3,1
8,5
4,3
2,2
6,5
2,1
3,3
1,1
5,5
8,7
4,3
1,1
7,7
1,02,2
2,2
2,21,0
5,4
1,03,2
x,y - x sites, of which y are connected sites
7
Awards by Carnegie Class
CarnegieClass
Total in Class HPC Awards
Research 126 111Doctoral 113 24Master’s 529 6Other* 13
* 3 Medical, 1 Engineering, 4 Research Institutes, 3 Supercomputing Centers, and 2 GigaPoPs
8
STAR TAP – Global View
9
Traffic Characteristics: vBNS vs. Commodity Internet
Games
NNTP
ssh
shell/cmd
DNS
SMTP
FTP
Web
Multicast
Other
10
Performance IssuesActive Measurement Project: PC-based
machines in ~50 campus research LANs“Upper bound” results based on UDP: about
80Mbps with east/west endpoints on 100Mbps LANs
Off-the-shelf TCP performs poorly: about 6Mbps with east/west endpoints on 100Mbps LANs
Campus engineering, endpoint device tuning or engineering, and applications engineering still need lots of work!
11
HPC Proposals: Meritorious Research Applications by “Directorate”
90/150 HPC proposals analyzed (to date); 557 meritorious applications cited: Mathematical & Physical Sciences (MPS) - 31% Computer & Information Sciences & Engineering (CISE) - 18% Geosciences (GEO) - 13% Engineering (ENG) - 11% Health Sciences (HS) - 10% Biological Sciences (BIO) - 7% Other (Business, Libraries, Fine Arts, Humanities) - 7% Education (EHR) - 3% Sociological, Behavioral, Economic Sciences (SBE) - <1%
12
HPC Proposals: Meritorious Research Applications “Features”
Data transfer - 73% High-end computing - 45% Collaboration - 39% Federal facilities, networks,
or other agency support - 37%
Visualization, imaging - 34% Multi-media, multicasting -
28% Simulation, modeling - 23% Instrument access or remote
device control - 19%
Data mining, databases - 17%
Education, distance learning, collaborative learning - 13%
Medical uses - 12% Highly distributed
experiments - 10% International involvement -
7% Networking research - 4%
13
What Do We Think? Solutions for local loop problems (availability and cost)
have been found in most cases Have finally reached a critical mass of connected sites Don’t yet have as much information about Abilene as we
do about vBNS Penetration of backbone services/functions into campus
network environments has been very limited Science-enabling performance and functionality has a
ways to go; applications stories are unclear Inter-Directorate interests are growing: telescopes, digital
libraries, biological instrumentation, Doppler radars
14
Opinions/ChallengesWe need much more
work at the top of the protocol stack.
Campuses need to do much more than connect.
We must not overlook the needs of network researchers.
15
Assessment PlansSite VisitsPerformance Monitoring and AnalysisSurvey and AssessmentCommittee of VisitorsGPRA ReportFeedback into Planning ProcessesFeedback into Budget Proposals