The QC Experience and Plans for Carbon Finance

Carbon Finance for Cities: New Opportunities Offered by CDM PoAs28 September 2009

Quezon CityQuality Community

Sustainable Solutions for the Environment

No. 7 Asian City of the Future 2007-2009

2nd Most Competitive City in the Philippines The Most Competitive City in Metro Manila

No. 21 in the Top 50 Global Outsourcing Cities

Center of Health and Wellness Tourism ICT Capital of the Philippines

Largest among Metro Manila citiesat 16,112.8 hectares

(1/4 the land area of Metro Manila)(2nd largest city in the Philippines)

Most populated city in Metro Manila,with 2.68 million people

Host to:• More than 60,000 business

establishments• 84 public and private markets

and 3 slaughterhouses

National Capital Region (Metro Manila)

Quezon CityQuality CommunityQuezon City Profile

The QC Experience and Plans for Carbon Finance

QUEZON CITY

Caloocan CityBulacan

Valenzuela

Marikina

Pasig

Mandaluyong

San Juan

Pateros

Taguig

Malabon

Caloocan

Navotas

Manila

Makati

Pasay

Parañaque

Las Piñas

Muntinlupa

Manila Bay

Cavite Laguna de Bay

Rizal

Sustainable Solutions for the Environment

Quezon CityQuality Community

Waste intake at the PAYATAS CONTROLLED

DISPOSAL FACILITY:1,100 tons per day411 trucks per day

Waste generation:approximately

1,800 MTper day

Payatas Controlled Disposal Facility

Land AreaOld Mound : 12 has. New Mound : 10 has. Final footprint: 30 has.

The QC Experience and Plans for Carbon Finance

Sustainable Solutions for the Environment

Quezon CityQuality CommunityThe Payatas Challenge

The unmanaged dumping of garbage in Payatas since the 1970’s made the dumpsite environs

dangerous & unhygienic, with fires due to spontaneous combustion

breaking out every now and then.

…in July, 2000 the Payatas dumpsite experienced a trash slide which left more than 250 people dead & several hundreds missing.

The challenge in Payatas is lessening the environmental impact

of its continuing operation

The QC Experience and Plans for Carbon Finance

Sustainable Solutions for the Environment

Quezon CityQuality Community

Since 2001, the Quezon City LGU,under Mayor Feliciano R. Belmonte, Jr.,

has made ENVIRONMENTAL PROTECTIONa cornerstone of the City’s drive

towards a QUALITY COMMUNITY.

The Payatas Challenge

The QC Experience and Plans for Carbon Finance

Sustainable Solutions for the Environment

Quezon CityQuality Community

The City’s major concerns in Payatas:

environmental health and

safety

stability of the dumpsite

safety and livelihood needs

of the immediate community

compliance to Republic Act

9003

BEFORE DURING

AFTER

Conversion from Open to Controlled Disposal Facility*QC is first Metro Manila LGU to gain DENR clearance to

convert dumpsite into controlled waste disposal facility

Engineering interventions were introduced to restructure, upgrade and ensure the safety of the dumpsite and lessen its

environmental impact

The QC Experience and Plans for Carbon Finance

Sustainable Solutions for the Environment

Quezon CityQuality Community

Gas-to-Power Generation Project with PNOC-EC

In 2002, the Quezon City and PNOC-EC undertook a study which showed the feasibility of the extraction of methane gas

from the dumpsite and its conversion to electricity.

*QC is first in capturing methane gas from the dumpsite as alternative energy source*

The QC Experience and Plans for Carbon Finance

Sustainable Solutions for the Environment

Quezon CityQuality Community

In 2004, a 100-KW Pilot Power Plant was set up at the disposal facility to highlight the significance of the technology

PGMA picture: Inauguration of

100KW pilot plant

Pilot Methane Power Plant

The QC Experience and Plans for Carbon Finance

Sustainable Solutions for the Environment

Biogas Emissions Reduction Project Quezon CityQuality Community

Quezon City signed an agreement with PANGEA Green Energy on February 14, 2007, for the development and implementation of

the first registered CDM project in solid waste management in the Philippines

The QC Experience and Plans for Carbon Finance

Sustainable Solutions for the Environment

Quezon CityQuality CommunityBiogas Emissions Reduction Project

Project Approvals

Host Country Approval granted on June 2007

Project registered with the UNFCCCCDM Executive Board in 1st February 2008

The QC Experience and Plans for Carbon Finance

Sustainable Solutions for the Environment

Quezon CityQuality CommunityBiogas Emissions Reduction Project

Benefits…elimination or reduction of

explosion or fire hazards

…reduction of odor and groundwater pollution

…reduction of damage to vegetation and acceleration of re-use of land

…improves dumpsite stability

…contributes to GHG reduction and mitigation of global warming

***Estimated emission reduction of 110,000 tCO2e/year from capture of landfill gas and 0.46 tCO2e/MWh displaced grid electricity ***

…generates renewable energy***Estimated generation of 4,200MWh of electricity per year, to benefit around 3,500 families***

The QC Experience and Plans for Carbon Finance

Sustainable Solutions for the Environment

Quezon CityQuality CommunityBiogas Emissions Reduction Project

Benefits

…builds capacity thru education and training

…generates employment

The QC Experience and Plans for Carbon Finance

Sustainable Solutions for the Environment

Quezon CityQuality CommunityBiogas Emissions Reduction Project

Benefits

…generates additional financial resources

for the CityCER Price

Range(in €/tCO2e)

% to be donated to

QC6.00 – 7.00 157.01 - 8.00 168.01 - 9.00 179.01 - 10.00 1810.01 - 11.00 1911.01 - 13.00 2113.01 - 15.00 2315.01 - 17.00 2517.01 - 20.00 2820.01 -- up 32

...to support infrastructure, manpower, livelihood, education and social

services development projects for the local

barangay

The QC Experience and Plans for Carbon Finance

Sustainable Solutions for the Environment

Quezon CityQuality CommunityBiogas Emissions Reduction Project

Updates

Groundbreaking ceremonies: July 10, 2007

Biogas Plant inauguration: April 2008

PLANTSAHAN NG BAYAN BIOGAS PLANT

VISAYAS ST. EXTENSION

The Biogas Plant, commissioned in March

2008, now produces almost 100KW of electricity for

internal plant consumption, perimeter lights and other facilities of the dumpsite,

streetlamps and the Plantsahan ng Bayan

The QC Experience and Plans for Carbon Finance

Sustainable Solutions for the Environment

Quezon CityQuality CommunityBiogas Emissions Reduction Project

Updates

***30,860 CERs for the 1st Monitoring Period (01 March to 31 August 2008) wereissued on June 25, 2009

***2nd Verification to be conducted in September 2009 to cover 01 September2008 to 30 June 2009 GHG avoidance

The QC Experience and Plans for Carbon Finance

Sustainable Solutions for the Environment

Quezon CityQuality CommunityLessons Learned

GHG mitigation and CDM projects bring environmental, social and financial benefits

The QC Experience and Plans for Carbon Finance

Sustainable Solutions for the Environment

Quezon CityQuality Community

The QC Experience and Plans for Carbon Finance

Opportunities for other CDM projects exist Energy efficiency in City-owned

buildings and facilities and streetlights Waste and waste water

management for markets and slaughterhouses

PoA Opportunities

Sustainable Solutions for the Environment

Quezon CityQuality CommunityConclusion

Capacity building, technical assistance

and financing are needed

The QC Experience and Plans for Carbon Finance