The projects /strategies/ for The projects /strategies/ for energy resources utilization energy resources utilization in Mongolia in Mongolia Speaker: M.Mendbayar Speaker: M.Mendbayar Head of Fuel Research Division, Head of Fuel Research Division, Energy Research and Development Center, Energy Research and Development Center, Ministry of Fuel and Energy, Ministry of Fuel and Energy, MONGOLIA MONGOLIA

The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Embed Size (px)

Citation preview

Page 1: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

The projects /strategies/ for The projects /strategies/ for energy resources utilization energy resources utilization in Mongoliain Mongolia

Speaker: M.MendbayarSpeaker: M.MendbayarHead of Fuel Research Division,Head of Fuel Research Division,Energy Research and Development Center, Energy Research and Development Center, Ministry of Fuel and Energy,Ministry of Fuel and Energy,MONGOLIAMONGOLIA

Page 2: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

ENERGY RESOURCES BY ENERGY RESOURCES BY TYPESTYPES

Thermal Power

Diesel Power

Station, MW 46 5,24%

Wind & Solar Power

Stations, MW 0,435

0,05%

Hydropower Plants, MW 3,7 0,42%

Page 3: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Installed capacity, generation and consumption Installed capacity, generation and consumption of Energy sector of Mongolia between 1921of Energy sector of Mongolia between 1921--2005 2005 and its prospective up to 2020and its prospective up to 2020

0100200300400500600700800900

1000110012001300140015001600

1921 1940 1950 1960 1970 1975 1980 1985 1990 1995 2000 2005 2010 2015 2020

ÌW

0

1000

2000

3000

4000

5000

6000

7000

8000

9000

10000

thou

sand

G

Cal

, B

illio

n êW

h

Installed capacity Electricity generation and consumption Heat generation and consumption

Page 4: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

PROGRAMS TO DEVELOP PROGRAMS TO DEVELOP THE ENERGY SECTORTHE ENERGY SECTORWith an aim of developing fuel and energy sector the With an aim of developing fuel and energy sector the

Government of Mongolia developed and approved Government of Mongolia developed and approved widewide--ranged programs such as:ranged programs such as:

Integrated power system programIntegrated power system programNational renewable energy programNational renewable energy programCoal programCoal program

Page 5: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Integrated power system Integrated power system programprogram

Main goal:Main goal:–– Establishment of integrated power system Establishment of integrated power system

by connecting existing Eastern, Western by connecting existing Eastern, Western and Central Energy Systems and Central Energy Systems

–– Increase the capacity of each Energy Increase the capacity of each Energy System to supply growing demandSystem to supply growing demand

–– Install power distributing lines to remote Install power distributing lines to remote Soums/county/Soums/county/

Page 6: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Integrated power system Integrated power system programprogram/Ongoing projects//Ongoing projects/

–– Approximately 50 Soums are Approximately 50 Soums are being connected to Energy being connected to Energy SystemSystem

–– Studies to create new power Studies to create new power and heat sources in Gobi and heat sources in Gobi region and Ulaanbaatar city region and Ulaanbaatar city are being carried outare being carried out

–– Investigations on possibilities Investigations on possibilities to export the electricity based to export the electricity based on major coal deposits are on major coal deposits are being implemented being implemented

Page 7: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Integrated power system Integrated power system program program /Planned projects//Planned projects/

Central RegionCentral Region1. Power plant #5 in 1. Power plant #5 in

Ulaanbaatar: Ulaanbaatar: -- Capacity 500MWCapacity 500MW

2. Power plant at 2. Power plant at Bayanteeg coal Bayanteeg coal mine:mine:-- Capacity 40MWCapacity 40MW

Page 8: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Integrated power system Integrated power system program program /Planned projects//Planned projects/

Western RegionWestern Region1. Power plant at 1. Power plant at

Mogoingol coal mine: Mogoingol coal mine: –– Capacity 12MWCapacity 12MW

2. Power plant at 2. Power plant at Khartarvagatai coal Khartarvagatai coal mine:mine:–– Capacity 40MWCapacity 40MW

Page 9: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Integrated power system Integrated power system program program /Planned projects//Planned projects/

Gobi RegionGobi Region1. Power plant at 1. Power plant at

Tavantolgoi coal Tavantolgoi coal mine: mine: –– Capacity 200MWCapacity 200MW

2. Power transmission 2. Power transmission line to Oyutolgoi line to Oyutolgoi deposit:deposit:–– Voltage 220kVVoltage 220kV

Page 10: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

National renewable energy National renewable energy programprogram

Main goal:Main goal:- to improve Mongolia energy sector structure by increasing the percentage of renewable energy in the total national energy supply, - to increase the economic effectiveness and reduce unemployment and poverty reduction, as well as - to provide sustainable environmental conditions to create sustainable social growth

Page 11: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

–– Hydro: Taishir, Hydro: Taishir, Durgun etcDurgun etc

–– Solar: Umnugobi Solar: Umnugobi aimag Noyon soumaimag Noyon soum

–– Wind: Sukhbaatar Wind: Sukhbaatar aimag Erdenetsagaan aimag Erdenetsagaan soum, Dornogobi soum, Dornogobi aimag Mandakh soum aimag Mandakh soum etcetc

National renewable energy National renewable energy programprogram/Ongoing projects//Ongoing projects/

Page 12: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

National renewable energy National renewable energy programprogram/Planned projects//Planned projects/

Hydro:Hydro:1. Kherlen HPP: 1. Kherlen HPP:

–– Capacity 8MWCapacity 8MW

2. Chargait HPP:2. Chargait HPP:–– Capacity 15MWCapacity 15MW

3. Maikhantolgoi HPP:3. Maikhantolgoi HPP:–– Capacity 12MWCapacity 12MWetcetc

Page 13: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Coal programCoal program

Main goal:Main goal:-- Increase the capacity of recent mining operations;Increase the capacity of recent mining operations;-- Engage ecologically friendly equipment and Engage ecologically friendly equipment and technology into mining processes;technology into mining processes;-- Develop new and potential deposits and related Develop new and potential deposits and related infrastructure;infrastructure;-- Manufacture coal petroleum, chemical products Manufacture coal petroleum, chemical products and combustible gas for domestic demand, export and combustible gas for domestic demand, export these products along with high quality coal and these products along with high quality coal and coke to regions of northcoke to regions of north--east and southeast and south--east Asiaeast Asia

Page 14: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Major technologies to be set up in Major technologies to be set up in MongoliaMongolia’’s Coal sectors Coal sector::-- Clean coal technology;Clean coal technology;-- Coal gasifying technology;Coal gasifying technology;-- Coal briquette technology;Coal briquette technology;-- Coal liquefying technology; andCoal liquefying technology; and-- Coking technologyCoking technology

Coal programCoal program

Page 15: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Coal programCoal program/Ongoing projects//Ongoing projects/

–– Contract Agreement with Axens Contract Agreement with Axens /France/ to prepare the /France/ to prepare the Feasibility Study to Build Up a Feasibility Study to Build Up a Coal Liquefying Plant in Coal Liquefying Plant in Mongolia /20,000 bbl per day/Mongolia /20,000 bbl per day/

– A small 2x100kW Coal Gasifying Power Plant was tested in Ulaanbaatar and installed in Buhmurun soum, Uvs aimag (Western Mongolia)

–– Bidding to select the Contractor Bidding to select the Contractor to build the lignite semito build the lignite semi--coke coke briquette plant at the TPP#2 briquette plant at the TPP#2 was announcedwas announced

–– Coal chemical laboratory is Coal chemical laboratory is being build and installedbeing build and installed

Page 16: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Coal program Coal program /Planned projects//Planned projects/

Clean coal technology:Clean coal technology:1. Coal processing plant 1. Coal processing plant

at Eldev coal mineat Eldev coal mine-- Capacity 500ttpaCapacity 500ttpa

2. Studies to introduce 2. Studies to introduce coal washing coal washing technology for low technology for low calorific/rank lignites calorific/rank lignites at Baganuur coal at Baganuur coal minemine

Page 17: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Coal program Coal program /Planned projects//Planned projects/

Coal gasifying:Coal gasifying:Studies to introduce Studies to introduce

IGCC technology for IGCC technology for planned new power planned new power plants allowing the plants allowing the steam and electricity steam and electricity generation by the generation by the gas produced via gas produced via production lineproduction line

Page 18: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Coal program Coal program /Planned projects//Planned projects/

Briquette technology:Briquette technology:To reduce the air To reduce the air

pollution in pollution in Ulaanbaatar and Ulaanbaatar and other densely other densely populated cities populated cities Briquette plants at Briquette plants at Baganuur, Eldev, Baganuur, Eldev, Tugrugnuur and etc Tugrugnuur and etc will be installedwill be installed

Page 19: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Coal program Coal program /Planned projects//Planned projects/

Coal liquefying:Coal liquefying:Coal liquefying plants with Coal liquefying plants with

total capacity of 20000total capacity of 20000--60000 bbl per day will 60000 bbl per day will be constructed in cobe constructed in co--operation with The operation with The Axens (France), Axens (France), Headwaters (USA), ICM Headwaters (USA), ICM (Mongolia) and others(Mongolia) and others(Mongolia(Mongolia’’s annual s annual consumption of oil consumption of oil products is 1Mtpa)products is 1Mtpa)

Page 20: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Coal program Coal program /Planned projects//Planned projects/

Coking technology:Coking technology:Installation of Coking Installation of Coking

and Chemical and Chemical complex at the complex at the Tavan Tolgoi depositTavan Tolgoi deposit

Installation of Coal and Installation of Coal and Chemical complexes Chemical complexes at the largest coal at the largest coal basins and depositsbasins and deposits

Page 21: The projects/strategies/for energy resources utilization ... · PDF fileenergy resources utilization in Mongolia ... Power Plant was tested in ... The projects/strategies/for energy

Thank you for you attention!Thank you for you attention!Gamsa hamni da!Gamsa hamni da!