34

The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside
Page 2: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

The Problem

2

Page 3: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Solutions

Problem needs a cocktail of responses :

- Road infrastructure Improvement

- Full cost of transport (environmental taxes)

- Higher urban density (resulting in higher use of public transport)

- Performant public transport

- Modal shift

- Train

- Waterborne transport

3

Page 4: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Modal Shift : Pallet Shuttle Barge

Logistic System for Goods on Pallet or in Big Bag

with Flexible & Specialised inland barges

4

Page 5: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Table of Contents

Aims | Total Concept

Part 1 | Pallet Shuttle Barge

- Concept

- Technical

- Advantages

Part 2 | Network of regional hubs

Type good-flows

Operational

5

Page 6: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Aims

Implementation innovative multimodal total-concept for

door-to-door logistics of goods on pallets or in big bags,

structured on a new type of small barge, active on short &

medium distances, in complement to road transport

A price competitive logistic solution making use of the

inland waterway system in Belgium, the Netherlands and

Northern France

An integrated network of bi- & trimodal logistic hubs with

regional coverage

A combination of ecology, safety, quality and flexibility

6

Page 7: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Traditional Inland Waterway

Transport

Traditional Inland waterway transport cannot offer a

response to shippers for

- Efficient

- Qualitative

- Safe

transport of goods on pallets or in big bags

Existing solutions raise a number of specific problems

- Need for large loads and limited types of goods

- Not a one-stop solution, needing extra administration &

management

- A large amount of manipulations of pool- or one-way pallets

resulting in high incidence of damages

7

Page 8: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Base concept

8

HUB HUB

A B

Page 9: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Base concept

9

Page 10: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Innovative concept

Fleet & Hubs

10

Page 11: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Pallet Shuttle Barge (PSB 1.0)

Basic lay-out

11

Page 12: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Pallet Shuttle Barge

Basic lay-out

12

Page 13: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Pallet Shuttle Barge

Technical

Construction

- Steel

- Modular

- Length 50 m, width 6,6 m, draught maximum of 2,20 m

- Production in large quantities, with standard dimensions

- Design focused on simple & fast maintenance or part replacement

Dedicated versions

- Possible for specific loads

- Specific handling equipment

Crew

- 1 FTE

- No living quarters/accommodation

13

Page 14: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Pallet Shuttle Barge

Technical

Load

- platform 210 m2 on 4 meter height (due to height restrictions)

- 198 EuroPallets on one layer

- Maximum Tonnage 300 ton

Motorisation & Propulsion

- Diesel or other hybride propulsion, driving hydraulic power

- 1 shottle motor (250 HP)

- 2 horizontal bowthrusters

Weather protection

- Hood

14

Page 15: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Pallet Shuttle Barge

Technical

Crane

- PSB has on-board crane to load/unload independently

- Capacity 2 ton at 12 meter

- Radio controlled operation

Reduced need for Quayside equipment

- PSB can berth unassisted

- PSB has spud-poles

- Fork-lift sized cargo

Control & Steering

- Joystick, automatic pilot, AIS en/of GPS

- Radar (optional) and depth control

- Use of bar-coding, RFID, …

15

Page 16: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Starboard Fore View

16

Page 17: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Starboard Aft View

17

Page 18: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Pallet Shuttle Barge

Containers

18

Page 19: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

In Operation

19

Page 20: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

In Operation

20

Page 21: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

In Operation

21

Schoten

Rumst

Page 22: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

In Operation

22

Page 23: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Pallet Shuttle Barge

Advantages

Lower investment

Single crew

Active positioning through 1 shottle aft &

bow-thrusters fore, possibility for GPS-navigation

Compact diesel motorization due to low weight catamaran

resulting in lower fuel consumption

Ecological transport mode, with possible transition to LNG

/CNG/H2

Possibility for remote control

23

Page 24: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Pallet Shuttle Barge

Advantages

Stocking of goods on deck resulting in easier and faster

loading/unloading in a safer and more qualitative manner

Carrying capacity responding to shippers’ needs (size,

type of goods, frequency)

Dependable service, in combination of fixed routes and

flexible route-planning for complete loads as well as

groupage

Activity independent of quay infrastructure

Unlimited operational times ( 24H possibility)

24

Page 25: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Pallet Shuttle Barge

Cost PSB versus Road Haulage

- Rule PSB is competitive if first//last mile is limited to

max 10-15% of total distance

- Cost PSB less influenced by fuel prices

- Cost PSB independent of road taxes and other levies

25

Page 26: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Network of regional hubs

for transshipment & distribution

Setup of network of hubs (terminals),

with bi- of tri-modal functions

Hubs also to be used as warehouse and distribution

center

Hubs situated with shippers or on dedicated sites

Hubs specialized in goods on pallets or in big bags

“All weather” hubs

26

Page 27: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Network of

regional hubs

27

Page 28: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Network van regional hubs

Extensive network

- Belgium

- Large cities : Antwerpen, Brussel, Charleroi, Gent, Hasselt,

Kortrijk, Luik, , Mons, Namen,)

- Regional Hubs (Aalst, Andenne, Brugge,, Genk, La

Louvière, Leuven, Oostende, Rumst, Tessenderlo, Tournai,

Vilvoorde, Wevelgem, Wielsbeke, Zeebrugge, …)

- Netherlands

- Amsterdam-Zaanstad ( Aalsmeer, Aklmaar,Beverwijk,Den

Helder, Greenport, Hoorn, Ijmuiden, Purmerend) , Breda,

Bergen op Zoom, Hengelo, Kampen,, Nijmegen, Rotterdam,

, Venlo, Utrecht,…

- Northern-France

- Lille, Valenciennes, …

Short & medium distance routes

28

Page 29: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Goods

Goods on pallet or in big bags

- Building materials

- FMCG (drinks,, …)

- Semi finished products

- Packaging

- …

City distribution

- All types

- Specific containers

- Small scale distribution

Projects

- Large building sites & infrastructure works

29

Page 30: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Planning operations

Planning & real-time follow-up of

- Barges

- Crew

- Loads

Software (routing, track & trace) for

- Simulations

- Routing software

- Routes

- Pallet Management

30

Page 31: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Present Situation

ZULU 01 is operational

ZULU 02 to be launched before end of January

Review of design : optimisation

ZULU 03 & 04 expected in 2015.

More ZULU’s ………

31

Page 32: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

ZULU ?

32

Page 33: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside

Contact

Management

- Antoon Van Coillie

- Jan D’Haeyer

- Johan Overmeer

[email protected]

33

www.bluelinelogistics.eu

Page 34: The Problem · Pallet Shuttle Barge Technical Crane -PSB has on-board crane to load/unload independently -Capacity 2 ton at 12 meter -Radio controlled operation Reduced need for Quayside