8
SUMMIT PARK THE OFFICES AT PLAY • STAY• WORK

THE OFFICES AT SUMMIT PARK · 2019. 9. 9. · SUMMIT VIEW OFFICE K:\PRELIMS\3300_50\P3326_Summit Park - Blue Ash\2019.07.03_Office Park Masterplan_Spec\Renderings\19-07-08_Renderings

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: THE OFFICES AT SUMMIT PARK · 2019. 9. 9. · SUMMIT VIEW OFFICE K:\PRELIMS\3300_50\P3326_Summit Park - Blue Ash\2019.07.03_Office Park Masterplan_Spec\Renderings\19-07-08_Renderings

S U M M I T V I E W O F F I C EK : \ P R E L I M S \ 3 3 0 0 _ 5 0 \ P 3 3 2 6 _ S u m m i t P a r k - B l u e A s h \ 2 0 1 9 . 0 7 . 0 3 _ O f f i c e P a r k M a s t e r p l a n _ S p e c \ R e n d e r i n g s \ 1 9 - 0 7 - 0 8 _ R e n d e r i n g s

THIS DOCUMENT IS AN INSTRUMENT OF SERVICE OF THE DESIGN BUILDER, AL NEYER, LLC., WHO RETAINS FULL OWNERSHIP OF THE DOCUMENT AND INTELLECTUAL PROPERTY CONTAINED THERIN. INCLUDING DESIGN CONCEPTS, DISTINCTIVE ARCHITECTURAL ELEMENTS, OR COMBINATION OF ELEMENTS. ANY USE, IN WHOLE OR PART, OF THE DOCUMENT OR INTELLECTUAL PROPERTY WITHOUT THE PRIOR WRITTEN AUTHORIZATION OF THE DESIGN BUILDER IS STRICTLY PROHIBITED. ANY PERSON ENGAGING IN, OR AIDING AND ABETTING SUCH UNAUTHORIZED USE WILL BE HELD LIABLE TO THE FULL EXTENT PERMISSIBLE BY LAW.

P R E L I M I N A R Y D E S I G N | C I N C I N N A T I , O H | J U L Y 0 8 , 2019A 0.0

S U M M I T P A R KTHE OFFICES AT

PLAY • STAY• WORK

S U M M I T V I E W O F F I C EK : \ P R E L I M S \ 3 3 0 0 _ 5 0 \ P 3 3 2 6 _ S u m m i t P a r k - B l u e A s h \ 2 0 1 9 . 0 7 . 0 3 _ O f f i c e P a r k M a s t e r p l a n _ S p e c \ R e n d e r i n g s \ 1 9 - 0 7 - 0 8 _ R e n d e r i n g s

THIS DOCUMENT IS AN INSTRUMENT OF SERVICE OF THE DESIGN BUILDER, AL NEYER, LLC., WHO RETAINS FULL OWNERSHIP OF THE DOCUMENT AND INTELLECTUAL PROPERTY CONTAINED THERIN. INCLUDING DESIGN CONCEPTS, DISTINCTIVE ARCHITECTURAL ELEMENTS, OR COMBINATION OF ELEMENTS. ANY USE, IN WHOLE OR PART, OF THE DOCUMENT OR INTELLECTUAL PROPERTY WITHOUT THE PRIOR WRITTEN AUTHORIZATION OF THE DESIGN BUILDER IS STRICTLY PROHIBITED. ANY PERSON ENGAGING IN, OR AIDING AND ABETTING SUCH UNAUTHORIZED USE WILL BE HELD LIABLE TO THE FULL EXTENT PERMISSIBLE BY LAW.

P R E L I M I N A R Y D E S I G N | C I N C I N N A T I , O H | J U L Y 0 8 , 2019A 0.0

Page 2: THE OFFICES AT SUMMIT PARK · 2019. 9. 9. · SUMMIT VIEW OFFICE K:\PRELIMS\3300_50\P3326_Summit Park - Blue Ash\2019.07.03_Office Park Masterplan_Spec\Renderings\19-07-08_Renderings

PLA

INFI

ELD

RD

GLENDALE-MILFORD RD

KEN

WO

OD

RO

AD

ALL

IAN

CE

RD

MALSBARY RD

REED HARTMAN HWY

• 98 acre mixed-use development

• Immediately adjacent to the 130 acre Summit Park

• Daventry at Summit Park: 104 high-end, neo-traditional family homes

- The Approach: 290 luxury apartments

- Nationally branded on-site hotel

- 40,000 SF of retail

- Up to 400,000 SF of Class A office space

MAIN ENTRANCE

MAIN ENTRANCE

CARVER RD

Page 3: THE OFFICES AT SUMMIT PARK · 2019. 9. 9. · SUMMIT VIEW OFFICE K:\PRELIMS\3300_50\P3326_Summit Park - Blue Ash\2019.07.03_Office Park Masterplan_Spec\Renderings\19-07-08_Renderings

THE NEIGHBORHOODS AT SUMMIT PARK Development Progress Map | Cincinnati, OH | 02/19

NATIONALLY BRANDED HOTEL126 rooms 2.86 acres

THE APPROACH290 Apartments

35,000 SF Commercial

SENIOR LIVING200 units4.55 acres

DAVENTRY PHASE I66 Single-Family Homes

20.87 acres

K:\PRELIMS\3400_99\P3481_Belcan at Summit Park_OH\R

CORPORATE HEADQUARTERS200,000 - 400,000 SF O�ce

DAVENTRY PHASE II12 acres

38 Single-Family Homes

HAMILTON CO. CRIME LAB90,000 SF O�ce & Laboratory

CLASS A OFFICE SPACE75,000 SF

D E V E L O P M E N T P R O G R E S S M A P

Page 4: THE OFFICES AT SUMMIT PARK · 2019. 9. 9. · SUMMIT VIEW OFFICE K:\PRELIMS\3300_50\P3326_Summit Park - Blue Ash\2019.07.03_Office Park Masterplan_Spec\Renderings\19-07-08_Renderings

P L A Y

Page 5: THE OFFICES AT SUMMIT PARK · 2019. 9. 9. · SUMMIT VIEW OFFICE K:\PRELIMS\3300_50\P3326_Summit Park - Blue Ash\2019.07.03_Office Park Masterplan_Spec\Renderings\19-07-08_Renderings

D A V E N T R Y T H E A P P R O A C H

S T A Y

Public & Private Roadway system in.

•Malsbary extension open

•Plainfield Road roundabout open

- 104 single-family home lots

- 16 homes occupied

- 16 homes under construction

•Price Range: $650,000 - $1,200,000

• 290 luxury rental units

• 35,000 SF commercial space

• Two-level parking structure

Estimated Completion: June 2020

• 105 rooms

• Full amenities

• Fitness room/pool

• Steps away from park and dining

P L A N N E D H O T E L

Page 6: THE OFFICES AT SUMMIT PARK · 2019. 9. 9. · SUMMIT VIEW OFFICE K:\PRELIMS\3300_50\P3326_Summit Park - Blue Ash\2019.07.03_Office Park Masterplan_Spec\Renderings\19-07-08_Renderings

S U MM

I T V I E W O F F I C E

P R E L I MI N A R Y D E S I G N | C I N C I N N A T I , O H | S E P T E M

B E R 1 4 , 2018

K : \ P R E L I MS \ 3 5 0 0 _ 5 0 \ P 3 5 3 2 _ T r u e p o i n t e S u m m i t P a r k _ O H \ R e n d e r i n g s \ P r e s e n t a t i o n L a y o u t _ 1 8 - 0 9 - 1 3 U p d a t e

THIS DOCUMENT IS AN INSTRUMENT OF SERVICE OF THE DESIGN BUILDER, AL NEYER, LLC., WHO RETAINS FULL OWNERSHIP OF THE DOCUMENT AND INTELLECTUAL PROPERTY CONTAINED THERIN. INCLUDING

DESIGN CONCEPTS, DISTINCTIVE ARCHITECTURAL ELEMENTS, OR COMBINATION OF ELEMENTS. ANY USE, IN WHOLE OR PART, OF THE DOCUMENT OR INTELLECTUAL PROPERTY WITHOUT THE PRIOR WRITTEN

AUTHORIZATION OF THE DESIGN BUILDER IS STRICTLY PROHIBITED. ANY PERSON ENGAGING IN, OR AIDING AND ABETTING SUCH UNAUTHORIZED USE WILL BE HELD LIABLE TO THE FULL EXTENT PERMISSIBLE BY LAW.

A 1.0

AREA MAP

NTS

NORTH

2 buildings

Up to 200,000 SF available;

divisible to 25,000 SF

25,000 SF floorplates

5:1000 parking ratio

$18.75/SF NNN

View of the Summit Park Nature Fitness Trail

Signage opportunities throughout Summit

Park Development

W O R K

� � �� � � � �� � �� �

�������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

��������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������������

���������������������������������������������������������������������������������������������������������������������������

���������������

���������������������

����� � �� �� �� �� ���

SUMMIT VIEW

SAMPLE FLOOR PLAN

Page 7: THE OFFICES AT SUMMIT PARK · 2019. 9. 9. · SUMMIT VIEW OFFICE K:\PRELIMS\3300_50\P3326_Summit Park - Blue Ash\2019.07.03_Office Park Masterplan_Spec\Renderings\19-07-08_Renderings

W O R K

Page 8: THE OFFICES AT SUMMIT PARK · 2019. 9. 9. · SUMMIT VIEW OFFICE K:\PRELIMS\3300_50\P3326_Summit Park - Blue Ash\2019.07.03_Office Park Masterplan_Spec\Renderings\19-07-08_Renderings

CHRIS VOLLMER, JR.First Vice President+1 513 369 [email protected]

JOHN ECKERTSenior Vice President+1 513 369 [email protected]

KATE MYERSAssociate+1 513 369 [email protected]

CHRIS VOLLMERSenior Vice President+1 513 369 [email protected]

For more information, contact:© 2019 CBRE, Inc. All rights reserved. This information has been obtained from sources believed reliable, but has not been verified for accuracy or completeness. Any projections, opinions, or estimates are subject to uncertainty. The information may not represent the current or future performance of the property. You and your advisors should conduct a careful, independent investigation of the property and verify all information. Any reliance on this information is solely at your own risk. CBRE and the CBRE logo are service marks of CBRE, Inc. and/or its affiliated or related companies in the United States and other countries. All other marks displayed on this document are the property of their respective owners. Photos herein are the property of their respective owners and use of these images without the express written consent of the owner is prohibited. PMStudio_July2019

S U M M I T P A R KTHE OFFICES AT

PLAY • STAY• WORK