The Nosecone The Nosecone Calorimeter Calorimeter People, Management, People, Management, Funding, Schedule Funding, Schedule R. Seto R. Seto Yonsei University Yonsei University Seoul, Korea Seoul, Korea Nov. 16, 2005 Nov. 16, 2005

The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

Embed Size (px)

DESCRIPTION

Collaboration USA USA BNL:lab BNL:lab Physics (Management, Design, Integration, engineering etc) Physics (Management, Design, Integration, engineering etc) Chemistry (DAQ, electronics) Chemistry (DAQ, electronics) Instrumentation (engineering, Gamma/pi0 design, front end chip) Instrumentation (engineering, Gamma/pi0 design, front end chip) UCR (Simulations, management, software) UCR (Simulations, management, software) ISU (Trigger, Simulations) ISU (Trigger, Simulations) UIUC (Simulations, Physics ideas) UIUC (Simulations, Physics ideas) Nevis (chi – FEE readout) Nevis (chi – FEE readout) Korea (Si- pads/gammapi0) Korea (Si- pads/gammapi0) Yonsei Yonsei Ewha Ewha SENS: company SENS: company ERTI:company ERTI:company Japan Japan Riken (lab) Czech Republic (Gamma/pi0 testing, constuction) Czech Republic (Gamma/pi0 testing, constuction) Charles U Academy of Sciences Prague Tech U ON semiconductor:company Russia Russia Moscow State U (Si pad design, testing, engineering) JINR-Dubna – 2 groups (lab) (Engineering, Mechanics, tungsten, assembly) MEPHI (front end electronics) Ekaterinbourg (company- board assembly) RIMST-ELMA (company- Si construction)

Citation preview

Page 1: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

The Nosecone The Nosecone CalorimeterCalorimeter

People, Management, People, Management, Funding, ScheduleFunding, Schedule

R. SetoR. SetoYonsei UniversityYonsei University

Seoul, KoreaSeoul, KoreaNov. 16, 2005Nov. 16, 2005

Page 2: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

scheduleschedule November 16th (Wednesday)November 16th (Wednesday)

10:30 - 11:00 I.H. Park (Ewha) : Status of Silicon Fabrication in Korea10:30 - 11:00 I.H. Park (Ewha) : Status of Silicon Fabrication in Korea 11:00 - 11:30 S.W. Nam (Ewha) : CREAM Silicon Detector11:00 - 11:30 S.W. Nam (Ewha) : CREAM Silicon Detector 11:30 - 13:00 Lunch11:30 - 13:00 Lunch

13:00 - 13:30 R.K. Seto (UCR) : Introduction and Physics Motivation13:00 - 13:30 R.K. Seto (UCR) : Introduction and Physics Motivation 13:30 - 14:15 E. Kistenev (BNL) : Design of the NCC13:30 - 14:15 E. Kistenev (BNL) : Design of the NCC 14:15 - 14:45 RKS/EK (UCR/BNL) : Performance 14:15 - 14:45 RKS/EK (UCR/BNL) : Performance 14:45 - 15:00 Coffee Break14:45 - 15:00 Coffee Break

15:00 - 15:30 E. Kristenv (BNL) : R and D Progress15:00 - 15:30 E. Kristenv (BNL) : R and D Progress 15:30 - 15:45 R.K. Seto (UCR) : Money, Schedule etc15:30 - 15:45 R.K. Seto (UCR) : Money, Schedule etc 15:45 - 16:00 J.H. Kang (Yonsei) : Manpower and Funding in Korea15:45 - 16:00 J.H. Kang (Yonsei) : Manpower and Funding in Korea 16:00 - 17:00 Tasks ahead (EK/RKS) and Discussion16:00 - 17:00 Tasks ahead (EK/RKS) and Discussion 17:00 - 19:00 Dinner17:00 - 19:00 Dinner

November 17November 17thth (Thursday) – Visit SENS and ERTI (Thursday) – Visit SENS and ERTI

Page 3: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

CollaborationCollaboration USAUSA

BNL:labBNL:lab Physics (Management, Design, Physics (Management, Design,

Integration, engineering etc)Integration, engineering etc) Chemistry (DAQ, electronics)Chemistry (DAQ, electronics) Instrumentation (engineering, Instrumentation (engineering,

Gamma/pi0 design, front end Gamma/pi0 design, front end chip)chip)

UCR (Simulations, management, UCR (Simulations, management, software)software)

ISU (Trigger, Simulations)ISU (Trigger, Simulations) UIUC (Simulations, Physics ideas)UIUC (Simulations, Physics ideas) Nevis (chi – FEE readout)Nevis (chi – FEE readout)

Korea (Si- pads/gammapi0)Korea (Si- pads/gammapi0) YonseiYonsei EwhaEwha SENS: companySENS: company ERTI:companyERTI:company

JapanJapan Riken (lab)Riken (lab)

Czech Republic (Gamma/pi0 Czech Republic (Gamma/pi0 testing, constuction)testing, constuction) Charles UCharles U Academy of SciencesAcademy of Sciences Prague Tech UPrague Tech U ON semiconductor:companyON semiconductor:company

RussiaRussia Moscow State U (Si pad Moscow State U (Si pad

design, testing, engineering)design, testing, engineering) JINR-Dubna – 2 groups (lab) JINR-Dubna – 2 groups (lab)

(Engineering, Mechanics, (Engineering, Mechanics, tungsten, assembly)tungsten, assembly)

MEPHI (front end electronics)MEPHI (front end electronics) Ekaterinbourg (company- (company-

board assembly)board assembly) RIMST-ELMA (company-RIMST-ELMA (company-

Si construction)Si construction)

Page 4: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

Management PlanManagement Plan Operate in the structure of PHENIXOperate in the structure of PHENIX

The “Forward upgrades group” meets and The “Forward upgrades group” meets and works together (RKS chairs meeting now)works together (RKS chairs meeting now)

Muon Piston Calorimeter (3<eta<4) : going in nowMuon Piston Calorimeter (3<eta<4) : going in now Muon spectrometer trigger (NSF MRI funding)Muon spectrometer trigger (NSF MRI funding) NCCNCC

We will have to work out a management We will have to work out a management structure – once we have all the structure – once we have all the responsibilities assigned responsibilities assigned For construction (EK)For construction (EK) For Money DOE/Riken/Other (RKS)For Money DOE/Riken/Other (RKS)

Page 5: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

PHENIX view of RHIC Upgrade PlansPHENIX view of RHIC Upgrade Plans

2004 2005 2006 2007 2008 2009 2010 2011 2012 2013 2014 2015 2016 2017 2018

RHIC baseline program

Au-Au ~ 250 b-1 at 200 GeV Species scan at 200 GeV Au-Au energy scan Polarized protons 150 nb-

1

Full utilization of RHIC opportunities:

Studies of QGP with rare probes: jet tomography, open flavor, J/, ’, c, (1s), (2s), (3s)

Complete spin physics programp-A physics

Near term detector upgrades of PHENIX TOF-W, HBD, VTX , Trig

40x design luminosity for Au-Au via electron cooling Commissioning

Long term upgrades FVTX, TPC/GEM, NCC

Extended program with 1st detector upgrades:

Au-Au ~ 1.5 nb-1 at 200 GeV Polarized p at 500 GeV (start p-A program)

Analysis of data on tape

PHENIX upgrades RHIC luminosity upgrade

Near term: Base line Long term: full detector and RHIC upgrades

Medium term: first upgrades

Page 6: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

NCC FundingNCC Funding Small amount of funding so far for R and DSmall amount of funding so far for R and D

Riken, UCR, BNL, Local Russian funding for themselves, Riken, UCR, BNL, Local Russian funding for themselves, Czech for themselves (a fair amount)Czech for themselves (a fair amount)

What do we need?What do we need? R and DR and D I claim with $3M in cash we can build one side, with $7M I claim with $3M in cash we can build one side, with $7M

we can build both sideswe can build both sides this might change as we do a better cost estimate in the next this might change as we do a better cost estimate in the next

month month Purchasing Si and W now (~200K worth Riken)Purchasing Si and W now (~200K worth Riken)

Major funding Major funding Riken $1M-$3MRiken $1M-$3M DOE ~$4M - $4.5MDOE ~$4M - $4.5M Other ~$1MOther ~$1M

Major question - timingMajor question - timing

Page 7: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

NCC Upgrade Schedule NCC Upgrade Schedule ScenarioScenario

EOB to BNL management: Oct 2005, RKS in EOB to BNL management: Oct 2005, RKS in LOILOI

20020022

20020033

20042004 20052005 20062006 20072007 20020088

20092009 20102010 20112011

Funding Funding (eob)(eob)ConstructConstruct(eob)(eob)RKS RKS originaloriginalMilestoneMilestoness

R&D Phase Construction Phase Ready for Data

DOE, Japan, Russia,Czech ($4.0M+$4.0M+$0.5M???)

Today

NCC1 operation

al

NCC2Operation

alBegin NCC1

Construction

NCC prototype 2

test

NCC prototype

1test

doesn’t match funding schedule

Page 8: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

NCC Upgrade Schedule NCC Upgrade Schedule ScenarioScenario

updated Nov. 2005updated Nov. 2005

20020022

20020033

20042004 20052005 20062006 20072007 20020088

20092009 20102010 20112011

FundingFunding(update)(update)Construct Construct (update)(update)UpdatedUpdatedMilestoneMilestoness

R&D Phase Construction Phase Ready for Data

DOE, Japan, Russia, Czech, other ($4.0M+$1 to 3M+$1M???)

Today

NCC2Operation

al

Begin NCC1

Construction

NCC prototype 2

test

NCC prototype

1test

(Protvino)

NCC1 operationa

l

Page 9: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

NCC CDRNCC CDR We want to appear in the 2007 We want to appear in the 2007

budgetbudget Need CDR to DOE by FebNeed CDR to DOE by Feb

Dec – CDR to collaborationDec – CDR to collaboration Jan – review by BNLJan – review by BNL

Page 10: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

CDR writing/reading teamCDR writing/reading team Readers Readers

PHENIX folksPHENIX folks Ahbay - spin, and pAAhbay - spin, and pA Ed Kinney - SpinEd Kinney - Spin Atsushi - lots of it (design Atsushi - lots of it (design

etc)etc) Matthias - lots of it.Matthias - lots of it. Ken – spinKen – spin Miraslov Finger (Charles Miraslov Finger (Charles

Univ)Univ) Outside folksOutside folks

Raju Venugopalan (pA - Raju Venugopalan (pA - saturation)saturation)

Mark Strickman - nucleon Mark Strickman - nucleon strucutrestrucutre

Dima KharzeevDima Kharzeev

Writers Writers RKSRKS EKEK Mickey (spin)Mickey (spin) Ken (spin)Ken (spin) Jen-Chieh (pA and nucleon Jen-Chieh (pA and nucleon

structure)structure) Mark Strikman (pA and Mark Strikman (pA and

nucleon structure)nucleon structure) John L (hard scattering)John L (hard scattering) jamie (charm and chic)jamie (charm and chic) Stefan (gamma-jet)Stefan (gamma-jet)

Could use another person in Could use another person in each of spin, heavy ion, pAeach of spin, heavy ion, pA

Page 11: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

CDR OutlineCDR Outline 1. Executive Summary (RKS)1. Executive Summary (RKS) 2. Physics Overview2. Physics Overview

(a) Heavy Ion Physics(a) Heavy Ion Physics i. Gamma-jet (John L I hope)i. Gamma-jet (John L I hope) ii. Chic (Jamie)ii. Chic (Jamie) iii. charm (Jamie)iii. charm (Jamie)

(b) pA collisions and the CGC (b) pA collisions and the CGC (Jen-Chieh+R. Seto)(Jen-Chieh+R. Seto)

i. direct photonsi. direct photons ii. dileptonsii. dileptons iii. hadronsiii. hadrons iv. jetsiv. jets

(c) Spin Structure of the nucleon (c) Spin Structure of the nucleon (Mickey - how much?)(Mickey - how much?)

i. Wi. W ii. Delta G Gamma-jetii. Delta G Gamma-jet iii. Transversityiii. Transversity

(d) Nucleon structure (Jen-Chieh)(d) Nucleon structure (Jen-Chieh)

3. Physics 3. Physics Measurements with Measurements with the NCC (RKS)the NCC (RKS) (a) Performance(a) Performance

i. Pi0i. Pi0 ii. Photonsii. Photons iii. Electronsiii. Electrons iv. Jetsiv. Jets

(b) Physics reach(b) Physics reach i. Heavy Ion Physicsi. Heavy Ion Physics ii. Spin Structureii. Spin Structure iii. Nucleon Structureiii. Nucleon Structure

(c) Physics reach with (c) Physics reach with the all Upgradesthe all Upgrades

Page 12: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

outline (cont)outline (cont) 4. The design of the NCC 4. The design of the NCC

(EK)(EK) (a) Overview(a) Overview (b) The Calorimeter(b) The Calorimeter (c) Gamma pi0 detector(c) Gamma pi0 detector (d) Electronics(d) Electronics (e) Mechanics and Cooling(e) Mechanics and Cooling (f) Integration(f) Integration (g) Triggering(g) Triggering

5. R and D (EK)5. R and D (EK) 6. Project Management and 6. Project Management and

Responsibilities (RKS)Responsibilities (RKS) (a) Overview(a) Overview (b) Management Structure(b) Management Structure (c) Responsibilities(c) Responsibilities

7. 7. Budget and Schedule (RKS, Budget and Schedule (RKS, EK)EK)

(a) Total Estimated Cost (TEC)(a) Total Estimated Cost (TEC) (b) Contingency Analysis(b) Contingency Analysis (c) Overhead(c) Overhead (d) Budget(d) Budget (e) Fiscal Responsibilities(e) Fiscal Responsibilities (f) Schedule(f) Schedule

8. 8. AppendicesAppendices

Page 13: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

Schedule in the next couple Schedule in the next couple monthsmonths

CDRCDR Skeleton in CVS (CVS co offline/analysis/NCCCDR)Skeleton in CVS (CVS co offline/analysis/NCCCDR) Major tasksMajor tasks

WritingWriting Cost estimateCost estimate TimelineTimeline

Dec ~4 CDR to collaborationDec ~4 CDR to collaboration EC/DC etc reviewEC/DC etc review

Jan Jan BNL ReviewBNL Review

Feb – To DOEFeb – To DOE Beam Tests – now at Dubna (Vasily/Andrei with Merkin, Litvinenko etc) Beam Tests – now at Dubna (Vasily/Andrei with Merkin, Litvinenko etc)

beam test 9beam test 9thth to 13 to 13thth (1 (1stst prototype) prototype) Korea Trip Nov 14-18 – EK/RKSKorea Trip Nov 14-18 – EK/RKS

In the next yearIn the next year Large prototype being designed (with gamma/pi0)Large prototype being designed (with gamma/pi0) Full electronicsFull electronics

Page 14: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

ENDEND

Page 15: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

CommissionNCC proto 1

Old Gannt chart from LOI

Page 16: The Nosecone Calorimeter People, Management, Funding, Schedule R. Seto Yonsei University Seoul, Korea Nov. 16, 2005

Upgrade Schedule ScenarioUpgrade Schedule ScenarioEOB to BNL managementEOB to BNL management

20020022

20020033

20042004 20052005 20062006 20072007 20020088

20092009 20102010 20112011

AerogelAerogel

TOF-WTOF-W

HBDHBD

VTX-VTX-barrelbarrelVTX-VTX-endcapendcapNCCNCC

MuTriggerMuTrigger

DAQDAQ

R&D Phase Construction Phase Ready for Data