The Northern Road upgrade Now open from The Old Northern Road to Peter Brock Drive Roads and Maritime Services | July 2018 The first stage of the $1.6 billion The Northern Road upgrade is now open, with 3.3 kilometres of new dual carriageway completed between The Old Northern Road, Narellan, and Peter Brock Drive, Oran Park. The completed section was officially opened in April by the Federal Minister for Urban Infrastructure and Cities, Paul Fletcher, the NSW Minister for Roads, Maritime and Freight, Melinda Pavey, and the Member for Camden, Chris Patterson. Safer, more reliable journeys More than 15,000 motorists use this section of The Northern Road every day. This upgrade ensures that there’s sufficient capacity on this part of The Northern Road to meet the needs of the new residents and businesses expected to move to the area in the years ahead. The new landscaped median, turning lanes and traffic lights will improve safety for road users. At the same time, dedicated bus lanes and a three‑metre‑wide shared path will provide safer and more reliable journeys for both cyclists and public transport customers. Key features Three lanes in each direction – two for general traffic plus a kerbside bus lane Upgraded intersections at Fairwater Drive, Hillside Drive and Cobbity Road, with traffic lights and dedicated turning lanes An increased 80 km/h speed limit A new off‑road shared pedestrian and cycle path. Roads and Maritime Services would like to thank road users and the Narellan, Harrington Park and Oran Park communities for their patience as we delivered this vital upgrade. Two new bridges were built over Narellan Creek for northbound and southbound traffic.

The Northern Road upgrade...The Northern Road upgrade Now open from The Old Northern Road to Peter Brock Drive Roads and Maritime Services | July 2018 The first stage of the $1.6 billion

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Northern Road upgrade...The Northern Road upgrade Now open from The Old Northern Road to Peter Brock Drive Roads and Maritime Services | July 2018 The first stage of the $1.6 billion

The Northern Road upgradeNow open from The Old Northern Road to Peter Brock DriveRoads and Maritime Services | July 2018

The first stage of the $1.6 billion The Northern Road upgrade is now open, with 3.3 kilometres of new dual carriageway completed between The Old Northern Road, Narellan, and Peter Brock Drive, Oran Park.The completed section was officially opened in April by the Federal Minister for Urban Infrastructure and Cities, Paul Fletcher, the NSW Minister for Roads, Maritime and Freight, Melinda Pavey, and the Member for Camden, Chris Patterson.

Safer, more reliable journeysMore than 15,000 motorists use this section of The Northern Road every day. This upgrade ensures that there’s sufficient capacity on this part of The Northern Road to meet the needs of the new residents and businesses expected to move to the area in the years ahead.

The new landscaped median, turning lanes and traffic lights will improve safety for road users.

At the same time, dedicated bus lanes and a three‑metre‑wide shared path will provide safer and more reliable journeys for both cyclists and public transport customers.

Key features• Three lanes in each direction – two for general

traffic plus a kerbside bus lane

• Upgraded intersections at Fairwater Drive, Hillside Drive and Cobbity Road, with traffic lights and dedicated turning lanes

• An increased 80 km/h speed limit

• A new off‑road shared pedestrian and cycle path.

Roads and Maritime Services would like to thank road users and the Narellan, Harrington Park and Oran Park communities for their patience as we delivered this vital upgrade.

Two new bridges were built over Narellan Creek for northbound and southbound traffic.

Page 2: The Northern Road upgrade...The Northern Road upgrade Now open from The Old Northern Road to Peter Brock Drive Roads and Maritime Services | July 2018 The first stage of the $1.6 billion

THE OLD NORTHERN ROAD

PORRENDE STREET

FAIRWATER DRIVE

HILLSIDE DRIVE

GOVERNOR DRIVE

THE NORTHERN ROAD

DAN CLEARY DRIVE

COBBITTY ROAD

PETER BROCK DRIVE

Harrington Park

Key

Scale

RoadLandscaped medianShared pathBus lane

200 metres

Bringelly

Luddenham

OranPark

St Marys

Penrith

Eliz

abet

h D

rive

The Northern Road

The Northern Road

Mersey Road to Eaton RoadConstruction tenders received

Littlefields Road to Glenmore ParkwayConstruction tenders received

Eaton Road to Littlefields RoadDetailed design underway

Peter Brock Drive to Mersey RoadUnder construction Open 2020

Glenmore Parkway to Jamison RoadUnder construction Open 2020

Western Sydney Airport at Badgerys Creek

Jam

ison

Roa

d

Gle

nmor

e Pa

rkway

Mulgoa Road

Wentworth Road

LittlefieldsRoad

Mersey RoadB

ring

elly

Roa

d

The OldNorthern Road

Luddenham Road

Eaton Road

Peter Brock Drive

The Northern Road upgrade – The Old Northern Road to Peter Brock Drive

Page 3: The Northern Road upgrade...The Northern Road upgrade Now open from The Old Northern Road to Peter Brock Drive Roads and Maritime Services | July 2018 The first stage of the $1.6 billion

Privacy Roads and Maritime Services (“RMS”) is subject to the Privacy and Personal Information Protection Act 1998 (“PPIP Act”) which requires that we comply with the Information Privacy Principles set out in the PPIP Act. All information in correspondence is collected for the sole purpose of delivering this project. The information received, including names and addresses of respondents, may be published in subsequent documents unless a clear indication is given in the correspondence that all or part of that information is not to be published. Otherwise RMS will only disclose your personal information, without your consent, if authorised by the law. Your personal information will be held by RMS at 27 Argyle Street, 2124 NSW. You have the right to access and correct the information if you believe that it is incorrect.

July 2018 RMS.18.881

5.3kmcompleted

25.3kmbeing built

32kmin planning or design

What happens next?We are continuing work on installing street lighting and noise walls along this section of the road. This work is due for completion in early 2019.

Upgrade work also continues on other sections of The Northern Road between Oran Park and South Penrith For more information, visit www.rms.nsw.gov.au/thenorthernroad.

Part of a wider planThe Australian and NSW governments are funding the Western Sydney Infrastructure Plan, a $3.6 billion road investment program delivering new and upgraded roads to support integrated transport in the region, and capitalise on the economic benefits of the Western Sydney Airport.

The Western Sydney Infrastructure Plan includes The Northern Road as well as:

• Werrington Arterial Road

• Bringelly Road upgrade

• M12 Motorway

• Glenbrook intersection upgrade

• Local Roads Package.

Completion of The Northern Road between The Old Northern Road and Peter Brock Drive and Werrington Arterial Road means that 5.3 kilometres of new and upgraded roads have now been delivered for Western Sydney road users.

For more information on the Western Sydney Infrastructure Plan, and to track our progress, visit www.rms.nsw.gov.au/wsip.

If you need help understanding this information, please contact the Translating and Interpreting Service on 131 450 and ask them to call us on 1800 703 457.

Contact usIf you have any questions on The Northern Road upgrade please contact our project team:

1800 703 457

[email protected]

www.rms.nsw.gov.au/thenorthernroad

PO Box 973 Parramatta NSW 2124

9kmRoads being built

BEING BUILTCOMPLETED IN PLANNING OR DESIGN

0 10 20 30 40 50 60 63KMKM

Progress - Western Sydney Infrastructure Plan projects