The Next StepSPACE ROBOTICS INITIATIVE
Skyworker-TIM2 12/8/99-1
SkyworkerSkyworkerAssembly, Inspection, and Maintenance of SSP FacilitiesAssembly, Inspection, and Maintenance of SSP Facilities
SkyworkerSkyworkerAssembly, Inspection, and Maintenance of SSP FacilitiesAssembly, Inspection, and Maintenance of SSP Facilities
Field Robotics Center
December 8, 1999
William “Red” WhittakerPeter StaritzChris Urmson
The Next StepSPACE ROBOTICS INITIATIVE
Skyworker-TIM2 12/8/99-2
Space Solar Power Assembly, Space Solar Power Assembly, Inspection, and Maintenance (AIM)Inspection, and Maintenance (AIM)
Space Solar Power Assembly, Space Solar Power Assembly, Inspection, and Maintenance (AIM)Inspection, and Maintenance (AIM)
• Extensive structures – Kilometers in dimension– Millions of parts
• SSP environment– Wide temperature range, sometimes
exceeding 500K– Solar Proton Events– Galactic Cosmic Radiation– Microwave Radiation– Kilovolt buses
• Long duration operations– 1 year construction– 30 years operation
The Next StepSPACE ROBOTICS INITIATIVE
Skyworker-TIM2 12/8/99-3
Motivation for a Robotic WorkforceMotivation for a Robotic WorkforceMotivation for a Robotic WorkforceMotivation for a Robotic Workforce
• High, inaccessible orbit
• Overwhelming EVA agenda– Millions of parts– 10’s of Millions of
Manipulations
• Long term operations
• Harsh environment
• Robots are expendable and repairable
• Lower support costs
The Next StepSPACE ROBOTICS INITIATIVE
Skyworker-TIM2 12/8/99-4
Assembly, Inspection, and Assembly, Inspection, and Maintenance TasksMaintenance Tasks
Assembly, Inspection, and Assembly, Inspection, and Maintenance TasksMaintenance Tasks
• 3D agile traversal of a truss structure
• Pick up and place payloads at arbitrary locations and orientations
• Carry payloads while walking, turning, and transitioning planes
• Conduct calibration and inspection tasks
• Connect power and communications cables
• Cooperatively carry bulky, massive payloads
• Perform tasks that require multiple robot collaboration
Cu
rre
nt P
rogr
am
Fu
ture
Wo
rk
The Next StepSPACE ROBOTICS INITIATIVE
Skyworker-TIM2 12/8/99-5
Possible AvenuesPossible AvenuesPossible AvenuesPossible Avenues• Free Flying Systems
– Require expenditure of mass to move– Result in tons of spare fuel– Risky docking operations
• Fixed Manipulators (e.g. shuttle & station)– Anchored to a hard point on the structure– Limited reach– Longer reach results in larger dynamic/reaction forces
• Attached Mobile Manipulators (AMM)– No mass expenditure– “Unlimited” reach– Ability to “walk lightly”– Temporarily attach for working reaction forces
• AMM is the archetype for SSP AIM
The Next StepSPACE ROBOTICS INITIATIVE
Skyworker-TIM2 12/8/99-6
Skyworker ScopeSkyworker ScopeSkyworker ScopeSkyworker Scope
• Robot Prototype and Software Simulation– Demonstrate the viability of
using robots for orbital construction
– Prove the validity of using structure walkers for orbital AIM
– Demonstrate SSP AIM relevant tasks using robotics
– Simulate prospective SSP AIM robots and tasks
The Next StepSPACE ROBOTICS INITIATIVE
Skyworker-TIM2 12/8/99-7
SkyworkerSkyworkerSkyworkerSkyworker• Self Contained
• Continuous gait allows payload to move at constant velocity– Requires less energy– Exerts less stress on the
structure (walks lightly)
• Counterbalanced to emulate micro g
• Onboard processor and distributed control network
• Mass: ~35 kg
• Dimensions: 3 m x .5 m x .1 m
• 11 DOF
The Next StepSPACE ROBOTICS INITIATIVE
Skyworker-TIM2 12/8/99-8
Skyworker SimulationSkyworker SimulationSkyworker SimulationSkyworker Simulation
• 3D visualization of SSP AIM activity
• Allows study of operations, and scale effects
• Kinematic models demonstrate extended operations– Coordinated operations– Long term, large scale
tasks
The Next StepSPACE ROBOTICS INITIATIVE
Skyworker-TIM2 12/8/99-9
Results to DateResults to DateResults to DateResults to Date
• Skyworker developed
• Component testing complete
• Simulation package operational
• Concept to operation in 99 days
The Next StepSPACE ROBOTICS INITIATIVE
Skyworker-TIM2 12/8/99-10
DemonstrationDemonstrationDemonstrationDemonstration
• Prototype– Pick up and carry a model transmitting element the length of the
truss, turn while carrying, couple the element to the structure– Perform a mock calibration– Demonstrate “walking lightly”
• Simulation– Perform prototype robot tasks– Perform plane transition– Assemble a large scale construction utilizing multiple robots
• Emphasis placed on system level activity– Current grippers and sensors are placeholders for future
development
The Next StepSPACE ROBOTICS INITIATIVE
Skyworker-TIM2 12/8/99-11
Development TeamDevelopment TeamDevelopment TeamDevelopment Team
• Skyworker has been developed by a team of staff and students at CMU
• William “Red” Whittaker
• Chris Gaiser
• Oren Laskin
• Dewitt Latimer
• Jason Messinger
• Jonathan Samuel
• Sarjoun Scaff
• Peter Staritz
• Chris Urmson
• Tim Warneck