The Next Generation Air Transportation System
“The Near Term and Beyond”
Presented by Charles Leader, Director
Joint Planning and Development Office
Expected Growth in the Aviation Expected Growth in the Aviation SystemSystem
Airport Landing, Weather, Lighting
Radar
Radar
Air/Ground Communications
NAVAIDs
Airport Traffic Control Tower (ATCT) Systems
Today’s Air Transportation Systemhas evolved to a primarily ground based,
human centric communications, navigation and surveillance system
Doubling of Demand Quickly Overwhelms Near-Term Capacity
(Current Sector Capacity Limits, 2010 Airport Capacities)
2X Demand
What is NextGen?SatNav Constellation(Positioning)
SatComm Constellation
(Data & Voice Digital Comm)Aeronautical Information & Curb-to-Curb 4-D Trajectory
Air Traffic ManagementFacilities
Airborne & Surface
Airport
Ground-Based UsersAOC, FBO, Business,
Private, Etc.
ADS
ADS
ADS
DynamicAirspace
ADS
SchedulingAutomation
User PlansData Base
ANSP PlansData Base
EVALUATOR
NETWORK CENTRIC INFORMATION
Communication Constellation
Navigation Constellation
Secured Net-Centric Access Responsive to Needs
NextGen Goes a Long Way to Meeting Growth in Demand
(3x Current Monitor Alert Parameter (MAP) Values, 1.3x 2010 Airport Capacities)
The Cost of “Not” Moving to The Cost of “Not” Moving to NextGenNextGen
55,000
75,000
95,000
115,000
135,000
155,000
175,000
195,000
215,000
235,000
2004 2014 2024 2034 2044 2054
Year
Flig
hts
per
Day
Unconstrained Demand including GA and Mil VFRUnconstrained Commercial Demand (TAF Growth)OEP H&S Capacity EstimateNo Change Capacity Estimate
$40 BillionAnnual
Economic Loss
$100 BillionAnnual
Economic Loss
Note: VFR GA traffic does not add RPMs to the system,so its contribution to annual economic loss is more
difficult to determine
No Change
OEP H&S
Uncons Comm
Uncons including
GA, Mil VFR
Demand by YearDemand by Year
Building the NextGen System:An Evolution
Deploy ADS-B, DataCom, RNP, NEO, SWIM• Establish equipage rules• Airspace/Route access based on RTSP
Establish NextGen Infrastructure
Develop: FY 06-11 Implement: FY 08-13
• All aircraft equipped for NextGen• Increased capacity, improved safety, a lower controller workloads
Primary NextGen OperationsDevelop: FY 12-17 Implement: FY 14-19
• Airports network expanded• 4DT Management (Gate-to-Gate)• Restructuring of NAV & surveillance infrastructure
Implement: FY 20-25
NextGen Super Density Operations
Develop: FY 18-21
Defining NextGenDefining NextGen
The Concepts of Operations
Enterprise Architecture
Trajectory-Based Operations (TBO) in High Altitude Airspace – Mid-Term
Automation
ADS-B
SWIM
Weather
4D• Latitude• Longitude• Altitude• Time
Ground Station
Data
Communications
ADS-B & CDTI
-In trail climb/descent
-Passing Maneuvers
Automation Decision Support
-ERAM
-TFM
-TMA
National Data
Local Data
Wx Data
SWIM Connectivity
Increased Throughput at High Density Airports – Mid-term
SurfaceManagement
System
NationalData
Local Data
ADS-B Integration into ATC Automation
RNAV/RNP
Continuous DescentArrival(CDA)
ADS-B & CDTI– Merging & Spacing– CDTI-Assisted Visual Separation (CAVS)
Cockpit Display of Traffic Information (CDTI)
StaffedVirtualTower
SWIMConnectivity
ADS-B
Precision Landing/Departure
SWIM
Surface Management
Automation Decision Support
NextGen Operational View NGATS Community Model View
Discussion
The following were slides we developed thatgive a slightly more program by program review.For backup, if you want use them.
FY 08 is the start of a Critical Investment Period that Supports the Mid and Longer-Term future of
NextGen
● ERAM
● TFM-M
● STARS/CARTS
● RNP/RNAV
● ERAM
● TFM-M
● STARS/CARTS
● RNP/RNAV
Current Programs
● Initial ADS-B
● Initial SWIM
● Airspace
Mgmt
Program
● Initial ADS-B
● Initial SWIM
● Airspace
Mgmt
Program
● ERAM Enhancements
● Concept
Demonstrations
● Infrastructure for
Trajectory Based
Operations
● TFM-M Enhancements
● Terminal
Enhancements
● ERAM Enhancements
● Concept
Demonstrations
● Infrastructure for
Trajectory Based
Operations
● TFM-M Enhancements
● Terminal
Enhancements
● RNP/RNAV Expansion
● Data Communications
● ADS-B
● SWIM/Net-Enabled Weather
● RNP/RNAV Expansion
● Data Communications
● ADS-B
● SWIM/Net-Enabled Weather
Essential Near-Term Investments
● Trajectory-Based
Operations
● Aircraft Data
Communications
● Performance-Based
Operations and
Services
● Separation
Management
● Collaborative TFM
● Trajectory-Based
Operations
● Aircraft Data
Communications
● Performance-Based
Operations and
Services
● Separation
Management
● Collaborative TFM
● Precision Navigation
● Weather Integration
● Surveillance Services
● Network-Centric Information Sharing
● Precision Navigation
● Weather Integration
● Surveillance Services
● Network-Centric Information Sharing
NextGen
NextGen Activities Over the Reauthorization Period
Oceanic En RouteEn Route
Departure Arrival
AirlinesTraffic Flow Management
Gate to Takeoff Landing to Gate
System-Wide Information Sharing(Surveillance, trajectory, weather, NAS resources)
RNAV/RNPIn High Density
Oceanic 4DTrajectories
Enroute 4DTrajectories
(Predictable / Guarantee / Time of Take-Off / Arrival)
Integrates foundational NGATS technologies (i.e. SWIM, ADS-B, RNP) with new procedures and operations across the route of flight
NNEW NEO Other Agency Industry Sponsored
High Density Airspace
High Altitude Airspace
High Density Airspace