10
The new set of MWPCs for CB CB@MAMI Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni

The new set of MWPCs for CB CB@MAMI Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni

Embed Size (px)

Citation preview

Page 1: The new set of MWPCs for CB CB@MAMI Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni

The new set of MWPCs for CB

CB@MAMI Collaboration Meeting Glasgow March 2006

A. Braghieri, P.Pedroni

Page 2: The new set of MWPCs for CB CB@MAMI Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni

Time ScheduleAug Sep Oct Nov Dec Gen ‘06

Not a realistic schedule !

(June 05)

today we are more or less here ….

Page 3: The new set of MWPCs for CB CB@MAMI Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni

Why ?

Very limited availability of our electronic workshop

Problems in PCB design (signal distributions to connectors) due to the limited space (all signals are on the same side)

new PCB test underway using new miniconnectors from AVX (additional problems to connect signals to the existing electronic setup)

Electronic workshop is giving more support to our group

I can not give at the moment any realistic estimate

(mwpcs ready not before october)

Page 4: The new set of MWPCs for CB CB@MAMI Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni

Possible ways out until the new mwpc set is ready:

• Use CB without mwpcs and PID

• Use CB with old PID only (PMTs on the upstream side)

• Use old mwpcs and old PID (downstream dead region)

Page 5: The new set of MWPCs for CB CB@MAMI Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni

CAD Layout (mwpcs)

Page 6: The new set of MWPCs for CB CB@MAMI Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni

Beam axis

CAD Layout

Wire planes Cathode planes

Distance between wire planes: 20 mm

(old mwpcs:32 mm)

resolution will be worse (x 1.6)

deg6.1.deg0.1

still acceptable (if ADCs performances will

improve)

1

2

Page 7: The new set of MWPCs for CB CB@MAMI Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni

new Cerenkov detector (needed for the GDH measurement):

Dr.T. Rostomyan (PhD from Gent Univ.)

1+1 year Post-Doc contract at INFN- Pavia (start: feb.06)

his main task is to build this detector with the technical help of RUG-Gent (D.Ryckbosch)

Page 8: The new set of MWPCs for CB CB@MAMI Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni
Page 9: The new set of MWPCs for CB CB@MAMI Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni

Technical Design

Two coaxial Multi-wire Proportion Chamber Mechanics and assembling

Diameter definitions CB Frame, PID2, new target

Gap between the two chambers and number of channels

Tracking resolution

Upstream Cathode and Anode readout

Connectors

Critical Parameters

205 mm: Outer diameter 132 mm: Inner diameter 2 mm: wire spacing (Electric field) 4 mm: strip width (charge collection) } MAGIC NUMBERS

Page 10: The new set of MWPCs for CB CB@MAMI Collaboration Meeting Glasgow March 2006 A. Braghieri, P.Pedroni

Improvements in the mwpc setup

Flash ADC problem (see Schumann’s talk) needs to be solved

Now all signals are at the upstream mwpc end; strip preamplifier/ADC crates need to be moved and space has to be found for them; probably new (longer) cables p.a. ADC needto be made Are there new p.a.-discriminators cards available for wires ? (COMPASS has built similar cards …)

Are there new p.a.(single channel hybr. chips) available for strips ? (NOT commercially available, this would need a dedicated project)