Upload
others
View
2
Download
1
Embed Size (px)
Citation preview
© 2008 IMEX Research All Rights Reserved Copying Prohibited
IMEXRESEARCH.COM
The New Data CenterConsolidated, Converged, Consolidated, Converged, Virtualized & AutomatedVirtualized & Automated
Anil VasudevaPresident & Chief [email protected]
© 2007-08 IMEX ResearchAll Rights Reserved
Copying ProhibitedPlease write to IMEX for authorization
IMEXRESEARCH.COM
© 2008 IMEX Research All Rights Reserved Copying Prohibited
Agenda
•• State of Existing Data Centers State of Existing Data Centers –– IssuesIssues
•• Cost & Technology Trends for the New Data CenterCost & Technology Trends for the New Data Center
•• Technologies/Metrics to followTechnologies/Metrics to follow
•• Implementing a Dynamic Data CenterImplementing a Dynamic Data Center
•• Consolidate, Converge, Consolidate, Converge, VirtualizeVirtualize & Automate& Automate
•• RecommendationsRecommendations
© 2008 IMEX Research All Rights Reserved Copying Prohibited
Chaos in the Enterprise . . .
Server/OS
Network
Application
Storage
Test
Backup
Disaster Recovery
Database
Financials
TM
D/R plan (MF only)
STK Silos Tape
TM
TM
TM
IBM3090-600JMVS/ESAIMS / ADABAS
BU by FDRUpstream
HPUX 10, 11.0, 11.2 MPE Sybase 11.9, 12
Fujitsu DS90UXP/M
8mm BackupLegato to DLT
IBM ADSM3490
HPOmniBack
SunSolaris 3.2, 3.4, 3.5Oracle 7.5, 8.0
IBM RS6000AIX 4.1, 4.2, 4.3DB2/6000
Compaq ProLiant 2500,5500NT 3.5, 4.0 SQL
Cheyenne to 4mm
Batch
IBM AS/400OS/400
InventoryExchange
CAD/CAME-commerce
Lotus NotesOLTP
CICS
File transfers AIX to HP/UX via Platinum 9.9
FTP between Sun -NT
Database extracts MVS to SP2 via MQ Series 4.4
PeopleSoft
(1) Scales poorly (2) Difficult to manage (3) Reliability is questionable (4) Management costs out of control
© 2008 IMEX Research All Rights Reserved Copying Prohibited
CIOs Pressures/Dilemma > Data Center
Data Center IT Operations
© 2008 IMEX Research All Rights Reserved Copying Prohibited
NDC – Aligning IT w Business Goals
From Maintenance FireFighting to Aligning IT with Business Goals
0%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
Today Goal
Bud
get &
Res
ourc
es A
lloca
tion
Apps
Apps
Infrastr
Infrastr
Maintenance
Innovation
© 2008 IMEX Research All Rights Reserved Copying Prohibited
*IOs per sesond for a required response time ( ms)
(RAID - 0, 3)
500100MB/sec101 505
1K
10 K
100
10
1
Application Aware Virtualization
eCommerceeCommerceTransaction Transaction ProcessingProcessing
OLTPOLTPOLTP
Data Warehousing
Visual DB
DSS(RAID - 1, 5, 6)
IOPs
(Lat
ency
)
StreamingStreamingStreamingAudioAudio
VideoVideo
Scientific ComputingScientific Computing
ImagingImaging
NICNICNIC
TP
HPCHPC
© 2008 IMEX Research All Rights Reserved Copying Prohibited
CIO Goals - DC Infrastructure
ServersServers/Admin
StorageTerabytes/DBA
MIS Alerts Urgent Alerts/Day
SystemAvailability
Servers Utilization
Win 5-10%, SMP 20-35%, MF 30-50%80+%
15-30300+
1TB100TB
20-404-5
HAL- 3 (99.9%)
HAL- 5 (99.999%)
Storage Utilization
30-45% Disk, 20-40% Tape75+%
Application Application/Server
130
Power & Cooling
kW/Rack Capability
TodayTargeted
2-5 kW/Rack15-20 kW/Rack
© 2008 IMEX Research All Rights Reserved Copying Prohibited
• WW 5.1 million data centers, Costs $100-175M to build a large DC 2007
– ~$1005/Sqft, $40,000/Rack, $2,500/Server, 2.5U– 82% of installed equipment (Srvr,Stg,Ntwk) has only10% utilization– For every $1 invested in new IT infrastructure, $7 spent to maintain– For every $1 in new Server spending, 42c spent on Power & Cooling /2006– Virtual Servers growth > Physical servers by 50% > Managing VM Sprawl– Blades increasing Power/Rack by 10x Need Power/Cooling,
• Consolidation in Enterprises & Service Providers– IT in Mega Data Centers, Data & Video Info Vaults at SPs
• Remote Offices, Global Reach, Always On– 66% of Enterprise workforce has remote location independent capability– Always On 24/7, Continuous Availability Mandatory
• New Technologies Necessary - a Competitive Weapon– Computing: Hi Density Blades, Multicore CPUs, Linux/Windows, TB Disks,– Networks: 10GbE, MPLS; Global Reach– Convergence (Voice Video, Data): Unified Communications, VoIP, Web 2.0– Mobility & Wireless (Location based Search/eCommerce)
Data Center – Cost & Tech Trends
© 2008 IMEX Research All Rights Reserved Copying Prohibited
E2E IT Infrastructure with HA & Securitywith HA & Security
Enterprise
Tier-3DatabaseServers
Tier-2Apps
Tier-1Edge Apps
ManagementDirectory Security Policy
Software OS Platform
Caching, Proxy, FW, SSL, IDS, DNS, LB, Web
Servers
IntrDet
IntrDet
Layer 3 Switches (Routers)
Layer 4-7 Switches
Layer 2 Switches
Stg Fibre Switches
Application,HA, File/Print, ERP, Security, SCM, CRM Servers
Database, Middleware, Data
Mgmt Servers
InternetISP
CoreOptical
NetworkingEdge
Access
ISPISP
ISP
IntrDet
Supplier/Partner
Remote Office
Home Networks
DSL
Cable Modem
MP3 VOD
WirelessCellular
xSP
App.Server
VPN
IntrDet
WebServices DBServers
ISP
ISP
© 2008 IMEX Research All Rights Reserved Copying Prohibited
IT Infrastructure Consolidation with HA & Securitywith HA & Security
Enterprise
InternetISP
CoreOptical
NetworkingEdge
Access
ISPISP
ISP
IntrDet
Supplier/Partner
Remote Office
Home Networks
DSL
Cable Modem
MP3 VOD
WirelessCellular
xSP
App.Server
VPN
IntrDet
WebServices DBServers
ISP
ISP
Tier-3Data Base
ServersTier-2 Apps
Switches: Layer 4-7,Layer 2, 10GbE, FC Stg
FC/ IPSAN
Caching, Proxy, FW, SSL, IDS, DNS,
LB, Web Servers
Application,HA, File/Print, ERP, SCM, CRM Servers
Database, Middleware, Data Mgmt Servers
Tier-1 EdgeApps
ManagementDirectory Security Policy
Software OS Platform
© 2008 IMEX Research All Rights Reserved Copying Prohibited
Blade Infrastructure:Local Area Grid (LAG©)
MidplaneW/Connectors
To Blades & BackModules
Storage: IP NAS or FC SAN Switch
Management Modules Remote Mgmt+KVM over IP
Cooling N+1Fans/Cooling ModulesPower: N+1Power Supplies
Networking: Gbit Ethernet Switches
BladeControlPanel
Processor Blades(6-24 typically)
MemoryDDR wECC
GbitEthernet
I/FSystemsMonitorModule
Micro-Processors
USB Ports, CD/Floppy I/F
© 2003-06 IMEX Research
~ GbE Switch supportsTrunking/Port AggregationFlow ControlQoS Packet PrioritizationSNMP/RMONIGMP/BOOTP/TFTP……
© 2008 IMEX Research All Rights Reserved Copying Prohibited
Blades - TCO Savings & ROI
0%
20%
40%
60%
80%
100%
1 2
% C
ontr
ibut
ion
OPEX
CAPEX33%
67%
46%
25%
Blade Servers Rack Servers
3 Year TCO Savings Rack vs. Blade Servers
OPEXStaff/
Support25%Maintenance/
Downtime54%
Facilities/Power21%
CAPEX
Servers46%
SWInfrastructure
22%
Storage Infrastructure
13%
Networking19%
TCO Savings in..
Data: IMEX Research 2004
© 2008 IMEX Research All Rights Reserved Copying Prohibited
Data Center Cooling
Computer Simulation using widely available software (e.g. Fluent Airpack Ansys CFD …) to verify Cooling Designed is the most cost effective before committing to final implementation.
Source: APC
IT Equipment50%
Where does the power go in Data Centers ?
Source: Emerson Liebert
Many techniques, methodologies and equipments from air cooling to liquid assisted cooling available form a variety of vendors and Consultants ….(Email [email protected] for more info and Assessment of competitive vendor products, consultants and data center power & cooling integrators) Source: IBM 2005
© 2008 IMEX Research All Rights Reserved Copying Prohibited
Implementing a Dynamic Data Center
CConvergenceonvergenceWeb 2.0 – Convergence of Computing with IP Telecom/Unified Networks to support eCommerce, Social Networking
VVirtualizationirtualizationPooled Resources, Optimally Provisioned per Application for Optimal Business Service Delivery, Monitored Usage
AAutomationutomationAutomatically Maintains App Service Level Objectives using Policy Based ILM
CConsolidationonsolidationStandardization - Reduce CAPEX via using Industry Standard Infrastructure, Shrink Wrap Apps. Reduced OPEX w/Automation Integration - Integrated Bladed infrastructure and low latency, high BW interconnect fabric
© 2008 IMEX Research All Rights Reserved Copying Prohibited
New Data Center
Converge
Virtualize
Automate
Consolidate
Web 2.0 ApplicationsConverge Computing/IP Telecom/VoIP…
Unified Networking
Data Centers, Branch Offices, DesktopsVirtual Infrastructure (Create Resources Pools)
Dynamically balance computing resources HA/No Downtime (Live Migration w VMotion/DRS)
Intelligent Resources Allocation w Predefined Rules
Bus Continuity (HA/CDP/VMotion FO)Capacity On Demand
Automating Patching of Hosts & VMsMinimize Power Usage/Consolidate Servers Shut down inactive
Standardize – HW/Blades, OS, Interfaces,SW, Apps Integrate – Servers/Storage/Netwrking Fabric
Energy Efficient DC Facilities
© 2008 IMEX Research All Rights Reserved Copying Prohibited
Workloads Consolidation using VZ
• A single server 1.5x larger than standard 2-way server will handle consolidated load of 6 servers.• VZ manages the workloads + important apps get the compute resources they need automatically w/o operator intervention.• Physical consolidation of 15-20:1is easily possible• Reasonable goal for VZ x86 servers – 40-50% utilization on large systems (>4way), rising as dual/quad core processors becomes available• Savings result in Real Estate, Power & Cooling, High Availability, Hardware, Management
Source; Dan Olds
© 2008 IMEX Research All Rights Reserved Copying Prohibited
Virtualizing your IT InfrastructureSLA
UsageDept/Owner
AssetsLocation
• Host Name (Mfr/Model/SN,• Platform – OS/Processors/#/Speed/Type
• Pooled Infrastructure Resources by Application Metrics
• Pooled Capacity Provisioning: Processing, Bandwidth, Storage, Repository
• Usage Profiles• Users/Services/Workloads
• Applications (OLTP/BI/HPC/Data Streaming)• Execution: Rules Driven, Adaptive Provisioning
• Services Abstraction, Adaptive Provisioning
VirtualizationUtility - P2V
• Business Priorities• Cost of IT Ops/Charge Back Methods
• Response Time/Availability/Throughput,QoS• Transactions/Sessions/Events/Analysis/Reporting
• Business Services Managed & Charged
For copy of case study on how a major financial institution implemented virtualization email [email protected]
© 2008 IMEX Research All Rights Reserved Copying Prohibited
Available Solutions
Major Virtualization Vendors Major Virtualization Vendors -- VMWare / VMWare / MicrosftMicrosft / Xen/ Xen
VMWare Solutions & ProductsVMWare Solutions & Products• Application QoS – DRS, DPM• Resources Deployment to Apps in Realtime – DRS, DPM*• Fast Recovery from HW & SW Failures – HA, VMotion• Proactively Avoid Planned Downtime – VMotion• Failover of entire DC – Site Recovery Mgr• Security - VMSafe
• Automating Application Delivery From Dev/Test through Staging to Production - Lifecycle Mgr/Staging Mgr/Lab Mgr
*DRS – Distributed Resource Scheduler, DPM – Distributed Power Mgmt
© 2008 IMEX Research All Rights Reserved Copying Prohibited
Datacenter Automation Source: VMWare
AppOS
AppOS
AppOS
AppOS
AppOS
AppOS
AppOS
AppOS
Lab Manager Stage Manager (Release Mgmt from Integration, Testing, Staging, Acceptance to Production)
Sire Recovery Mgr Sire Recovery Mgr Site Recovery Manager (automates & ensures DR)
(Failover Site) (Failover Site)
Lifecycle Manager (manages requested/approved VMs across DC over VM lifecycle)
Virtual Infrastructure (DRS, HA, DR…)
Virtual Center (VI APIs)
Dev & QA Staging Production
Hypervisor
AppOS
App
OS
AppOS
App
OS
AppOS
App
OS
AppOS
App
OS
AppOS
App
OS
AppOS
App
OS
AppOS
App
OS
AppOS
App
OS
Physical Resources
© 2008 IMEX Research All Rights Reserved Copying Prohibited
TCO Savings with Virtualization
$-
$4,000
$8,000
$12,000
$16,000
w/o VZ w VZ
Provisioning
HardwareSAN
NetworkPower & Cooling
DC Real EstateDisaster Recovery
Downtime
Cos
t ove
r 3 y
ears
995 Pre-Virtualization (VZ) Servers 78 VZ Servers
VZ SW & Support
For a copy of TCO
Analysis, Email:
imex@ imexresearch.comOr call (408) 268-0800
© 2008 IMEX Research All Rights Reserved Copying Prohibited
Summary Implementing New DC
•• Virtualization (VZ) now a mainstream technologyVirtualization (VZ) now a mainstream technology–– VZ turning DC core infrastructure upside down, DC VZ turning DC core infrastructure upside down, DC
Professionals very happy with its future useProfessionals very happy with its future use–– VZ means VZ means ““Doing More for LessDoing More for Less”” (finally making CFOs get off (finally making CFOs get off
your back)your back)
•• Follow SICVA in executing your DC strategyFollow SICVA in executing your DC strategy–– StandardizeStandardize (Windows/Linux, GbE, IP Storage/(Windows/Linux, GbE, IP Storage/iSCSI,SATAiSCSI,SATA..)..)–– IntegrateIntegrate (Blades, Management Tools..)(Blades, Management Tools..)–– ConvergeConverge Computing w Web 2.0/IP Telecom InfrastructureComputing w Web 2.0/IP Telecom Infrastructure–– VirtualizeVirtualize (Infrastructure(Infrastructure--uP,ServersuP,Servers, Storage, , Storage, Networks,ClientsNetworks,Clients
w P2V tools)w P2V tools)–– AutomateAutomate (Provide important Apps required resources (Provide important Apps required resources
automatically w/o intervention to automatically w/o intervention to OOPEX costs)PEX costs)
© 2008 IMEX Research All Rights Reserved Copying Prohibited
Summary Implementing New DC
•• Create VZ Justification: TCO Reduction of 60Create VZ Justification: TCO Reduction of 60--70% 70% over 3 years, ROI >58%over 3 years, ROI >58%–– Combined with VZ, Consolidation can reduce cost by 70%Combined with VZ, Consolidation can reduce cost by 70%–– Key advantages: Increased utilization, HA/BC/DRKey advantages: Increased utilization, HA/BC/DR
•• Focus Focus –– Focus on IT Services and not IT Resources or Focus on IT Services and not IT Resources or
InfrastructureInfrastructure
–– Keep an eye on Rise of Cloud Computing / SaaS, SOA Keep an eye on Rise of Cloud Computing / SaaS, SOA
© 2008 IMEX Research All Rights Reserved Copying Prohibited
Summary Implementing New DC
•• Issues to be ResolvedIssues to be Resolved–– VMs exploding VMs exploding –– Managing them a nightmareManaging them a nightmare
–– Database Performance Database Performance
–– SecuritySecurity
•• Follow Virtualization in 3 phasesFollow Virtualization in 3 phases–– Consolidation & Resource Sharing Consolidation & Resource Sharing
HA/BC/DR, Workload Balancing HA/BC/DR, Workload Balancing
Automation. Consolidate through VZ and Workload Management, Automation. Consolidate through VZ and Workload Management,
–– Reduce # systems Footprints & OS instances Reduce # systems Footprints & OS instances
(Reduces OS Licensing Costs, Reduces Mgmt Admin Costs)(Reduces OS Licensing Costs, Reduces Mgmt Admin Costs)
–– Create Workload Mgmt based on Business Policies Create Workload Mgmt based on Business Policies
Mission Critical, & DB WorkloadsMission Critical, & DB Workloads……
© 2008 IMEX Research All Rights Reserved Copying Prohibited
IMEXRESEARCH.COM
The New Data CenterConsolidated, Converged, Consolidated, Converged, Virtualized & AutomatedVirtualized & Automated
Anil VasudevaPresident & Chief [email protected]
© 2007-08 IMEX ResearchAll Rights Reserved
Copying ProhibitedPlease write to IMEX for authorization
IMEXRESEARCH.COM