1 TRTR - IGORR 2005 B. BOURGUIGNON CEA / DEN / DER CADARACHE THE NEW CABRI WATER LOOP September 12-16, 2005 Holiday Inn Gaithersburg, MD

THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

  • Upload
    others

  • View
    5

  • Download
    0

Embed Size (px)

Citation preview

Page 1: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

1

TRTR - IGORR 2005

B. BOURGUIGNON CEA / DEN / DER CADARACHE

THE NEW CABRI WATER LOOP

September 12-16, 2005

Holiday Inn

Gaithersburg, MD

Page 2: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

2D. BOURGUIGNON CEA/DEN Cadarache

The new Cabri water loop

THE NEW CABRI WATER LOOPDescriptionSafety options and design

THE ZIRCALOY EXPERIMENTAL CELLDescriptionZircaloy characterizationZircaloy / Stainless steel junctionUltrasonic control equipment

Page 3: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

3D. BOURGUIGNON CEA/DEN Cadarache

Cabri water loop - DescriptionThe main components are :In core experimental cell

Water pressure vessel Safety tube

Primary circuit Primary pump Pressurizer Heat Exchanger Heater

Filter

Draining Tank

Secondary loop and cooling loop

Containment vessel

Auxiliary circuits

Page 4: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

4D. BOURGUIGNON CEA/DEN Cadarache

Cabri water loop - Design and safety options

Nominal operating conditions in the experimental cell :

Pressure : 155 bars Temperature : up to 300°C Flow rate : from 1 to 6 m3/h

The maximum power extracted by the cooling loop is 75 kW

Main safety options :The loop is composed of two barriers :

First barrier : the primary loop (up to double blocking valves on each connections).

Second barrier : Safety tube (for in core part), main containment vessel, piping double containement.

Each components have been displayed in safety classes. And with each safety classes was associated a equivalent level of the RCC-M (design and construction code for the loop)

The third barrier is ensured by the reactor building and its associated ventilation.

Page 5: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

5D. BOURGUIGNON CEA/DEN Cadarache

Cabri water loop - Principal design conditions

Primary circuit : Design pressure : 190 bars Design temperature : 355°C MHPE seismic conditions : maintain of thigtness SSE seismic conditions : non rupture A pressure wave due to fuel/water interaction is also one of the design conditions.

Main containment vessel : Design pressure : 8 bars Design temperature : 130°C MHPE and SSE seismic conditions : maintain of thigtness

Safety tube : Design pressure : 4 bars Design temperature : 130°C MHPE and SSE seismic conditions : maintain of thigtness Aggressions like guillotine break of the primary cell or whippings of pipings are also

design conditions.

MHPE = Maximum Historicaly Probable EarthquakeSSE = Safe Shutdown Earthquake

Page 6: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

6D. BOURGUIGNON CEA/DEN Cadarache

Cabri water loop - Description

Filter

Experimental Cell Containment vessel

Cabri Core

Piping under double containment

Draining Tank

Page 7: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

7D. BOURGUIGNON CEA/DEN Cadarache

Cabri water loop - Components manufacturing

Draining tank during the hydraulic test.

• 3.1 m3

• Design : 10 bars / 100°C

Main containment vessel

• Diameter : 2,6m

• High : 9 m

• Design : 8 bars / 130 °C

January 2005November 2004

Page 8: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

8D. BOURGUIGNON CEA/DEN Cadarache

Cabri water loop - Works on site pictures

March 2005

Page 9: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

9D. BOURGUIGNON CEA/DEN Cadarache

Zircaloy experimental cell - Description

Experimental Cell (made of zircaloy) is composed of 2 concentric shells : the water pressure vessel and the safety tube.

•Overall lenght = 9 m

•Usefull space inside the vessel for the experimental device is a 4 meters long cylinder with diameters going from 140 mm to 74 mm.

Safety Tube

Internal diameters : from 348 mm to 154

mm

Top part of the vessel

Page 10: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

10D. BOURGUIGNON CEA/DEN Cadarache

Zircaloy - Need of high characteristics

Pressurised Water

Test Channel

Test Device

Pressurised Water Vessel

Safety Tube

Nickel Tube

Test Pin

The first design conditions (200 bars / 500 °C) led to the need of a specific casting for Cabri. Cabri core view

Page 11: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

11D. BOURGUIGNON CEA/DEN Cadarache

Zircaloy - Characterisation

Specific Cabri Casting High oxygen % High tin % Special heat treatment

The objectives : Increase mechanical characteristic and creep resistance. Obtain homogeneous material

Characterisation objectives (on base metal and welds) : Determine allowables stresses values Validate toughness values Shows good homogeneity Justify unimportant creep curve Supplement data on creep at 400°C

Page 12: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

12D. BOURGUIGNON CEA/DEN Cadarache

Zircaloy - Characterisation

Tensile Strength

0

100

200

300

400

500

600

700

0 50 100 150 200 250 Diameters of taking away (mm)

TS (M

Pa)

20°C (A2MI) 300°C (A2MI) 355°C (A2MI) 400°C (A2MI) 24°C (SRMA1) 300°C (SRMA1) 22°C/24°C (SRMA2) 100°C (SRMA2) 300°C (SRMA2) 400°C (SRMA2)

Results (YS, TS, E) for the bars show good homogeneity between the various bars, in the thickness of the rounds and in their lenght.

Page 13: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

13D. BOURGUIGNON CEA/DEN Cadarache

Zircaloy - Characterisation

Tensile Strength - Bars

y = 2,7629E-06x 3 - 5,1570E-04x 2 - 1,0083E+00x + 4,8207E+02

100

150

200

250

300

350

400

450

500

550

600

650

0 20 40 60 80 100 120 140 160 180 200 220 240 260 280 300 320 340 360 380 400 Temperature (°C)

TS

(MPa

) P

Rm-Dim.(MPa) Rm-Spéc. (Mpa) A2MI (métal de base) SRMA1 (métal de base) SRMA2 (métal de base) SRMA1 (ligne de fusion) SRMA2 (joint soudé) Rm moy.(métal de base) Rm moy.+ 2 sigma Rm moy.- 2 sigma Polynomial (Rm-Dim.(MPa))

No deteriorations by the welding process of the tensile properties of the base metal.

Page 14: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

14D. BOURGUIGNON CEA/DEN Cadarache

Zircaloy - Characterisation

Summary of the toughness test results on the beta treated bars (base metal, fusion line, welded joint) - Average of measurements

Temperature (°C) Toughness base metalJ (kJ/m2) KJC(MPa.m1/2)

Toughness fusion lineJ (kJ/m2) KJC(MPa.m1/2)

Toughness welded jointJ (kJ/m2)

KJC(MPa.m1/2)

20 46 72 56 79 In readiness

100 78 90 ‘’

150 61 80 70 86 ‘’

300 85 90 114 105 ‘’

All the results cover the minimum values used in fracture mechanics calculations : (50 MPa.m1/2 or 35 kJ/m2)

Page 15: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

15D. BOURGUIGNON CEA/DEN Cadarache

Zircaloy / Stainless steel junction

HIP + Machining

Combination of 2 process :

• Mechanical fixing by 2 cones

• Connection by welding-diffusion

Satisfactory first results :

• Tensile strenght values in temperatures are only slightly lower then zircaloy base metal.

• Ruptures occur in the zircaloy.

Page 16: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

16D. BOURGUIGNON CEA/DEN Cadarache

Zircaloy experimental cell - US control equipement

Specification requirements : an accuracy of 0.1 mm to the measures of diameters and thickness a detection, characterization and positioning of minimal defect in internal or

external skin of : length = 5mm, width = 0.3mm and 0.5 mm depth, the possibility of inspecting all the weldings of the cell and the globality of the part

being in regard of Cabri core reactor.

Gloves box

Two ultrasonics methods :Pulsate echos -> for measurements (diameters and thickness)TOFD (Time Of Flight Diffraction) -> for research and defect characterization.

Technical Challenge :Need to control 7 different diameters (from 145 mm to 71mm) displayed on 9 meters height, without any risk of wedging.

Page 17: THE NEW CABRI WATER LOOP - NIST - Cabri... · The new Cabri water loop ... Aggressions like guillotine break of the primary cell or whippings of pipings are also design conditions

17D. BOURGUIGNON CEA/DEN Cadarache

Cabri water loop

General view of the foreseen CABRI Water loop facility

Implementation of the new loop is on his way. Manufacturing and works on site are going on by now.

Most of the challenges have been faced and the facility should be available for the commissioning scheduled in the beginning of 2007.