The National Plan

The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Embed Size (px)

Citation preview

Page 1: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

The National Plan

Page 2: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

The National PlanNREAP

Page 3: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

The Planned progress of Renewable Energy (RE) to 2020

Detailed figures are shown in Appendix 1

Page 4: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

The Planned progress of RE related to Consumption

This is visibly a reasonable relationshipConsumption from National Grid (Appendix 3)

Page 5: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

What is actually happeningDECC RESTATS & REPD provide Progress reports and data

Source: https://restats.decc.gov.uk/app/pub/repd/index/tab/progress/

This is the DECC chart of actual progress in Renewable EnergyThe actual rate is MUCH greater than the planned rate – see App. 2.1

Note: 2013 is half year only.

Page 6: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

What is actually happening

Source: https://restats.decc.gov.uk/app/reporting/decc/datasheetE

xcee

ds m

axim

um c

onsu

mpt

ion

with

out a

ny o

ther

gen

erat

ion

Page 7: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

This is just Renewables

Exc

eeds

max

imum

con

sum

ptio

n

with

out a

ny o

ther

gen

erat

ion

Page 8: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

This is just Renewables

Exc

eeds

max

imum

con

sum

ptio

n

with

out a

ny o

ther

gen

erat

ion

When the wind blows, actual Supply exceeds our Consumption.Do we switch off Nuclear so we can use more Wind?Do we switch off other Renewable Energy so we can use more wind?

Page 9: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Progress in Northumberland

Source: https://restats.decc.gov.uk/cms/planning-database

Renewable Energy

Already Approved in

Northumberland

Total over 757MW

Page 10: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Progress in Northumberland

Source: https://restats.decc.gov.uk/cms/planning-database

Renewable Energy

Already Approved in

Northumberland

Total over 757MW

Consumption 172MW(1520GWh)

Page 11: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Progress in Northumberland

Wind Farms Now Approved in Northumberland

Total over 326MW

Source: https://restats.decc.gov.uk/cms/planning-database

Renewable Energy

Already Approved in

Northumberland

Total over 757MW

Consumption 172MW(1520GWh)

Page 12: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Progress in Northumberland

Wind Farms Approved in Northumberland

Total over 326MW

Source: https://restats.decc.gov.uk/cms/planning-database

Page 13: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Progress in Northumberland

Wind Farms Approved in Northumberland

Total over 326MW

Source: https://restats.decc.gov.uk/cms/planning-database

238MW of this total were approved by Planning Inspectorate (PINS) and Ministers over-turning Northumberland and local decisions

Page 14: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

How We Compare

Northumberland Totals over 326MW238MW by PINS

25 Other Counties together TOTAL just 242MWSource: https://restats.decc.gov.uk/cms/planning-database

Page 15: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

How We Compare

Northumberland Totals over 326MW238MW by PINS

25 Other Counties together TOTAL just 242MWSource: https://restats.decc.gov.uk/cms/planning-database

Page 16: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

How We Compare“Our countryside is one of the most precious

things we have in Britain” David Cameron 12/08/13 Daily Telegraph Article

We would agree.

Dunstanburgh Castle as it used to be

Northumberland Coast Area of Outstanding Natural Beauty

Page 17: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

How We Compare“I would never sanction something that might

ruin our landscapes and scenery.”David Cameron 12/08/13 Daily Telegraph Article

Then who did? Or is this not “your” landscape?

Northumberland Coast Area of Outstanding Natural Beauty

Dunstanburgh Castle as it now is.

Page 18: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

How We CompareThe Council’s grounds and case for refusal:• Dominance in the wider landscape affecting the Coast AONB.• Harm to the Landscape Character Area.• Would result in significant harm to some of the most important and

cherished landscape in the North of England.

Northumberland Coast Area of Outstanding Natural Beauty

Dunstanburgh Castle as it now is.

Page 19: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Why do we need more Wind farms?

Is More Wind needed to “keep the lights on”?

Is More needed to lower Carbon Emission and “save the world”?

Page 20: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Is it to “keep the lights on”?

National Grid gave us the answer in their Nov. 2012 Ten Year Statement.

http://www.nationalgrid.com/uk/Electricity/ten-year-statement/current-elec-tys/

Page 21: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Is it to “keep the lights on”? NO!

The plant margin is defined as the amount of generation capacityavailable over and above the level of peak demand.

National Grid Ten Year Statement Nov. 2012 p28

This National Grid chart shows excess capacity above peak requirements.The Blue section denotes ALL planned wind generation at different

wind strengths through to year 2032

Page 22: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Is it to “keep the lights on”? NO!

The plant margin is defined as the amount of generation capacityavailable over and above the level of peak demand.

National Grid Ten Year Statement Nov. 2012 p28

National Grid show that even when we are at our greatest consumption (the peak demand) all the predicted wind generation is within the “Margin”.When the wind is blowing we will have 70% EXCESS capacity.

None of it is needed to meet even maximum consumption.Wind is NEVER needed to keep the lights on.

Page 23: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Is it to save Carbon Emission?

We have already seen the answer:

Page 24: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Is it to save Carbon Emission? NO!How can extra wind farms save emissions if we

already have to switch off other renewables in order to use wind?

Exc

eeds

max

imum

con

sum

ptio

n

with

out a

ny o

ther

gen

erat

ion

Page 25: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Is it worth ruining Landscape, Scenery and the Countryside? NO!

Northumberland Coast Area of Outstanding Natural Beauty

Page 26: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Local ImplementationNorthumberland

Lynemouth and Cresswell

Page 27: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Local ImplementationNorthumberland

Coquet Island & Alnmouth : Northumberland Coast AONB

Page 28: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Local ImplementationNorthumberland

Predatory PlanningA visual demonstration of the load faced by Northumberland Planners and Decision Makers.Courtesy of Windbyte.co.uk

The Current Threats

The proposed wind farms at Belford are much closer to Bamburgh and Lindisfarne than Middlemoor is to Dunstanburgh

Page 29: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Dunstanburgh Castle Northumberland Coast Area of Outstanding Natural Beauty

Local Implementation Northumberland

An iconic Natural Northumberland Landscape

Dunstanburgh Castle with The Cheviot as the backdrop

Page 30: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Dunstanburgh Castle Northumberland Coast Area of Outstanding Natural Beauty

The Society gave evidence at the Public Inquiry:“The Wind Farm would be visible from Holy Island to Dunstanburgh, almost half of the AONB, dominating the landscape”

Local Implementation Northumberland

Page 31: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Dunstanburgh Castle Northumberland Coast Area of Outstanding Natural Beauty

The Society gave evidence at the Public Inquiry:“The Wind Farm would be visible from Holy Island to Dunstanburgh, almost half of the AONB, dominating the landscape”

The Planning Inspector when talking about Dunstanburgh found:“the wind farm would appear as a distant area of interest, amongst others, in the landscape”.

Local Implementation Northumberland

Page 32: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Dunstanburgh Castle Northumberland Coast Area of Outstanding Natural Beauty

The Society gave evidence at the Public Inquiry:“The Wind Farm would be visible from Holy Island to Dunstanburgh, almost half of the AONB, dominating the landscape”

The Planning Inspector when talking about Dunstanburgh found:“the wind farm would appear as a distant area of interest, amongst others, in the landscape”.

“I would never sanction something that might ruin our landscapes and scenery.”

David Cameron 12/08/13 Daily Telegraph Article

Local Implementation Northumberland

Page 33: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Dunstanburgh Castle Northumberland Coast Area of Outstanding Natural Beauty

The Society gave evidence at the Public Inquiry:“The Wind Farm would be visible from Holy Island to Dunstanburgh, almost half of the AONB, dominating the landscape”

The Planning Inspector when talking about Dunstanburgh found:“the wind farm would appear as a distant area of interest, amongst others, in the landscape”.

“I would never sanction something that might ruin our landscapes and scenery.”

David Cameron 12/08/13 Daily Telegraph Article

Local Implementation Northumberland

Page 34: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Dunstanburgh Castle Northumberland Coast Area of Outstanding Natural Beauty

The Society gave evidence at the Public Inquiry:“The Wind Farm would be visible from Holy Island to Dunstanburgh, almost half of the AONB, dominating the landscape”

The Planning Inspector when talking about Dunstanburgh found:“the wind farm would appear as a distant area of interest, amongst others, in the landscape”.

We agree they are distant but industrial structures of that size ruin this Natural landscape and dominate the Historic setting. They are 6 miles away but still tower over Dunstanburgh and The Cheviot in the background.

“I would never sanction something that might ruin our landscapes and scenery.”

David Cameron 12/08/13 Daily Telegraph Article

Local Implementation Northumberland

Page 35: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Presented by the Northumberland & Newcastle Society Environment Policy Group (NEPG)

Please help us to continue to protect and conserve our Heritage and Environment for the Future.

Please join the Society to support us and contribute to this work

Page 36: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Dunstanburgh Castle Northumberland Coast Area of Outstanding Natural Beauty

The Society gave evidence at the Public Inquiry:“The Wind Farm would be visible from Holy Island to Dunstanburgh, almost half of the AONB, dominating the landscape”

The Planning Inspector when writing about Dunstanburgh found:“the wind farm would appear as a distant area of interest, amongst ot

We agree they are distant but industrial structures of that size ruin this Natural landscape and dominate the Historic setting. They are 6 miles away but still tower over Dunstanburgh and The Cheviot in the background.

“I would never sanction something that might ruin our landscapes and scenery.”David Cameron 12/08/13 Daily Telegraph Article

Local Implementation Northumberland

Page 37: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Appendix 1: The “Plan” Numbers

Source: https://www.gov.uk/government/uploads/system/uploads/attachment_data/file/47871/25-nat-ren-energy-action-plan.pdf

The “total” line above is charted on slides 3- 5It should be noted that Onshore wind accounts for less than 1/3rd of the planned energyThe total planned energy from renewables in 2020, 116970GWh, is over 30% of current electricity sales (301,000GWh in 2011)

Page 38: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

App.2: What is actually happeningDECC RESTATS & REPD provide Progress reports and data

Source: https://restats.decc.gov.uk/app/reporting/decc/datasheethttps://www.gov.uk/government/uploads/system/uploads/attachment_data/file/47871/25-nat-ren-energy-action-plan.pdf p152.http://infrastructure.planningportal.gov.uk/projects/east-midlands/triton-knoll-offshore-wind-farm/

Total Renewable Energy (RE) actually operational 2012 is 15741MWTotal planned (NREAP) for 2012 is 12720MW.Total planned for 2013 is 14660MW – we already have 18440MW plus over 1200MW recently announced but not included in the above June report.

Page 39: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

App.2.1: What is actually happeningDECC RESTATS & REPD provide Progress reports and data

Source: https://restats.decc.gov.uk/app/pub/repd/index/tab/overview/

The figures above show detailed current planning progress not just as operational quantities but also the future approved plans and rates of implementation.They allow us to accurately project future operational quantities based upon the detailed planned figures and current performance.

This is shown in slides 6-8, 21

Page 40: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Appendix 3: Consumption profile

http://www.nationalgrid.com/NR/rdonlyres/4AB92B80-499A-4D3A-84E4-BBE884CBBA55/49900/NETSSYS2011.pdf National Grid Seven Year Statement 2011

Page 41: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Appendix 3.1: Consumption profile

http://www.nationalgrid.com/NR/rdonlyres/4AB92B80-499A-4D3A-84E4-BBE884CBBA55/49900/NETSSYS2011.pdf National Grid Seven Year Statement 2011

Page 42: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

The Society’s evidence to the Middlemoor Public Inquiry• Some 9km to the east is the coastal area, designated an AONB in 1958. It has some of the most dramatic

coastal scenery in the country, as well as a remarkable richness and variety of cultural sites and natural habitat. Much of the enjoyment derives from the absence of mechanical or industrial intrusions both in the AONB and in its visual hinterland. The Wind Farm would be visible from Holy Island to Dunstanburgh, almost half of the AONB, dominating the landscape. Almost the full height of the turbines would be visible from the coast, and their height would be almost as great as the altitude of the site.

• Although the site is some 20km from the Cheviots, the Wind Farm would be noticeable to walkers on the High Cheviots. The flashing movement of the turbine blades would be an unwelcome intrusion.

• Motorists on the A1 would be faced with the dominating presence of a wind farm landscape. Many would be tourists or visitors in search of wild, romantic landscapes and distant views, whose experience would be jarred and interrupted by the presence of the turbines.

• The landscape of Northumberland remains, to a remarkable extent, an unspoilt prospect of grand landscapes, long views and gradual change over centuries. To destroy this part of Northumberland’s landscape is to impoverish the whole.

The Inspector’s conclusion:• I do not think that the Wind Farm would have a harmful effect on landscape character. • the Northumberland Coast Area of Outstanding Natural Beauty (AONB) would not be materially affected.

The main character focus of the AONB is the coast itself and, although the development would be seen in distant views from the AONB, the effect would not be materially harmful.

• Overall, I find the wind farm would not conflict materially with the qualities of the landscape which contribute to the settings of the coastal historic features. This would be so both in general and in particular instances such as when glimpsed in a critical view at the entrance to Dunstanburgh Castle. Rather than a discordant focus of attention, the wind farm would appear as a distant area of interest, amongst others, in the landscape.

• The renewable energy policy background to the proposal is so strong, and the potential benefits so great, that the harm identified to visual aspects and settings should not prevent the proposal from proceeding.

Source: https://www.og.decc.gov.uk/EIP/pages/public-inquiries/file47571.pdf

Page 43: The National Plan. The National Plan NREAP The Planned progress of Renewable Energy (RE) to 2020 Detailed figures are shown in Appendix 1

Dunstanburgh Castle Northumberland Coast Area of Outstanding Natural Beauty

The Society gave evidence at the Public Inquiry:“The Wind Farm would be visible from Holy Island to Dunstanburgh, almost half of the AONB, dominating the landscape”

The Planning Inspector when talking about Dunstanburgh found:“the wind farm would appear as a distant area of interest, amongst others, in the landscape”.

We agree they are distant but industrial structures of that size ruin this Natural landscape and dominate the Historic setting. They are 6 miles away but still tower over Dunstanburgh and The Cheviot in the background.

“I would never sanction something that might ruin our landscapes and scenery.”

David Cameron 12/08/13 Daily Telegraph Article

Local Implementation Northumberland