37
The National Integrated Land System (NILS) Larry Money June 24, 2005

The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

  • Upload
    hadan

  • View
    218

  • Download
    3

Embed Size (px)

Citation preview

Page 1: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

The National Integrated Land System (NILS)

Larry MoneyJune 24, 2005

Page 2: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

• Purpose/Goal• Functional Components• Design • Data• Question

Page 3: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

BLM’s Responsibilities (OMB A-16)

• Public Land Records– Public land conveyance data

• Federal Land Ownership Status– Real and mineral property

• Cadastral – Public Land Survey System

Page 4: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

NILS Facts and Figures• BLM manages:

– 262 million surface acres– 700 Million subsurface acres

• 130 million parcels/ 28,000 PLSS Townships

• ~ 250 survey and measurement users• ~ 900 parcel management users• USDA Forest Service manages 8.5

percent of U.S. land

Page 5: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

Problem to Solve• Poor spatial accuracy of base GIS features

is a problem compounded by the fact that many other layers are constructed from these base features

• Multiple programs in the PLSS Maintenance process

Page 6: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

• A simple system to create and manage survey geometry in ArcGIS

• The system must be extensible, follow survey methods, improve existing datasets, and maintain spatial relationships between the survey networks and associated GIS data

Page 7: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

1990’sVision

Page 8: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

GISGIS

SurveySurveyBridgeBridge

Page 9: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

Geodata.gov• Part of the Geospatial One-Stop E-Gov

initiative providing access to Federal, State, and Local geospatial data and information.

Page 10: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

NILS Functional Components

SurveyManagement

MeasurementManagement

ParcelManagement

GeoCommunicator

Page 11: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

Survey ManagementSurvey Management

This will support the capture of measurement features and metadata directly into a GIS database format.

The goal is to minimize the need for data conversion and re-construction as measured features are incorporated into the land records management system.

1011 1010 1100 1101 0011

Page 12: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

Measurement ManagementMeasurement Management

1

Integrated maintenance of cadastral data is made much more efficient when geometry can be shared.Interpretation of (1) the reliability of each point position and (2) where data editing is needed.

New data can be added, and data elements that do not contribute to the optimal solution can be removed.Any area can be selected and readjusted, e.g. to update point positions affected by newly-added data.

Provides the foundation for the legal description and parcel fabric tiers.

Data Model Tiers

SURVEY

MEASUREMENT

NETWORK

LEGALDESCRIPTION

FABRIC

PARCELFABRIC

Page 13: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

Parcel ManagementParcel ManagementProvides a process for managing land records and cadastral feature data stored in the database model. Provides custom feature classes, tools, and procedures for editing land records in a transactional, history-tracking environment. Support will be provided to allow users to construct and edit legal description fabrics and to create required parcel fabrics from them. Parcel fabrics may include ownership, land use rights, tax assessment, and others.

LEGALDESCRIPTION

FABRIC

PARCELFABRIC

NW

NE

SE

SW

11

12

10 3

14-29-

1211

3436

35

10

Parcel FabricLegal Description Fabric

MeasurementNetwork

Page 14: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

GeoCommunicatorww.geocommunicator.gov

Internet Site

•Land Survey Information System

•Federal Land Stewardship

•Land & Mineral Use Records

•Reference Data

Page 15: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

NILS• NILS comprises transactional and publication

components:

– The ArcGIS implementation for creating and maintaining Survey, LD, and Parcel data is the transactional component

– The ArcIMS implementation for viewing, querying, and downloading data is the publicationcomponent

Page 16: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

ProvideCustomer

Service

Higher Level BLM Business Processes

CollectAnd ManageInformation

PerformAssessment /

Analysis

PerformPlanning

ManageLand UseActivity

ManageWork

Business Process Components

SpatialQuery and

Display

NILS

Spatial Queryand Display

SM, MM, PMData Processes

Page 17: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

ArcSDE

GeoData -base

PM ParcelFabric

ArcIMS

LSISCustomer

Land Records

SFF Importer

Input Data

GCDB filesCoverages

(LD)

Flat files(Surveys)

LD importer

Business RulesSection Subdivision

Geodetic Calculations

Least Squares AnalysisTopology Analysis

COGO

Custom Applications

COTS ApplicationsArcGIS

LDFabric

Survey Fabric

SM/MM

New Survey Data

DataPrep

LR2000

Transaction Database

Publication Database

Internet

Parcel ManagementBusiness Rules &

Custom Applications

GCDB

Page 18: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

NILS Analysis & DesignLegalAreaDescription

Parcel RecordBoundary

ParcelAddress

ParcelArea

ParcelTransaction

Agent

ParcelLegalArea

ParcelRecordBoundary

Restriction

OrganizationPublicAgency

Address

AgentAddress

IndividualTransferredRight

RecordBoundaryReference

TransactionAgent

LegalAreaCorner

Line

StraightLine CircularCurve OtherCurve

Corner (Legal)

CornerPoint (Monument)

CornerPointMeasuredCoordinate

RecordBoundaryCornerPoint

LADBaseLegalAreaRecordBoundary

MeasurementNetwork

ParcelFabric

LegalDescription

Fabric

ExternalParcelData

FGDC Cadastral Standard

Page 19: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

NILS Software ArchitectureNILS Software Architecture

FilesFilesSpatial Spatial Data Data

EngineEngine

GeoData ObjectsParcels Corner Point

Survey Management

MeasurementManagement

ParcelManagement

Arc Catalog Arc Map Arc ToolBox

Survey Analyst

Page 20: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

• Primary components:Arc SDE 9.0, Arc GIS 9.0. Arc IMS 4.0Informix 9.4Apache Tomcat 4.1IISJava SDK/JRE 1.4FME/Spatial DirectBASS2Citrix XPeStorage over 1 Terabyte 2 Large database tables over 20 million records each

Page 21: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation
Page 22: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

Change In Paradigm

Expense

AssetData as an:

Moving from an Moving from an EXPENSEEXPENSE to an to an ASSETASSET

Page 23: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

USFS Centric Application Development

BLM Centric

Application

Development

COTS

Shared Costs

Shared Functionality

Shared Standards

Greater Efficiency

Less Redundancy

Greater Share-ability of Data

Change In Paradigm

Page 24: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

Geodatabase designed toreflect existing standards and to work in an object oriented technologyenvironment.

• Federal Geographic Data Committee (FGDC) Cadastral Data Content Standard

• American Land Titles Association (ALTA)• Manual of Instructions for the Survey of the Public

Lands of the United States, 1973*

*

*

*

*

Geometry

Curve

Segment

Geometry-Collection

Polycurve

BezierCurve CircularArc Line

Envelope Point Multipoint

Path

Ring Polyline Polygon

Multipoint is a collection of pointsand is a type of geometry collection.

GeometryObject Model

This diagram summarizes theobjects that comprise the geometry

system and their relationships.

BezierCurve, CircularArc and Line are types of segmentsthat when joined at end points, form a path. A ring is a simple

non-intersecting area.

A point is a discretex,y location.

An envelope is arectangle thatspans a feature.

A feature is associatedwith one of these types

of geometry: points,multipoints, polylines,

and polygons.

A polyline is anarbitrary collection ofpaths.

A polygon is anarbitrary collection ofrings.

A path is a set ofsegments which are

connected.

*GeometryAbstract

Class

GeometryCoClass

TypeInheritance

Association

Key

Circular Arc LineBezier Curve

PathsSegments

Ring Polyline

Polygon (two rings)

IConstructLine

Class DiagramKey

CoClass

PolygonIPolygon : IPolycurve

ExteriorRingCount: LongInteriorRingCount (in exteriorRing: IRing) : Long

FindExteriorRing (in interiorRing: IRing) : IRing

QueryExteriorRings (exteriorRings: IRing)QueryInteriorRings (in exteriorRing: IRing,

interiorRings: IRing)

IPolygon

IArea

IMAware

IMCollection

IZAware

IZCollection

IESRIShape

IWin32Shape

ITopologicalOperator

IRelationalOperator

IPointIDAware

Interface of interest

Property GetProperty PutProperty Get/PutProperty Put by Reference

FunctionEvent function

Line

ILine ILine : ICurve

Angle: Double

PutCoords (in from: IPoint, in to: IPoint)

QueryCoords (from: IPoint, to: IPoint)

IConstructLine : IUnknown

ConstructAngleBisector (in from: IPoint, inthrough: IPoint, in to: IPoint, in Length:Double, in bUseAcuteAngle: Boolean)

ConstructExtended (in inLine: ILine, extendHow:_esriSegmentExtension)

The Use of Standards

Page 25: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

Meta Data Must Be Associated With All Data Sets

StoredStoredin XMLin XML

(Structured (Structured Document)Document)

ArcCatalogArcCatalog

CADCADDrawingDrawing

CoveragesCoverages

ShapesShapes

TinsTins

AnyAny

GridsGrids

Data SetsData Sets

TablesTables

ArcSDEArcSDE

ImagesImages View/Edit View/Edit as Formsas Forms

Full FGDC StandardFull FGDC Standard

Page 26: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

Parcel FabricParcel FabricFeaturesFeaturesCase ParcelsCase ParcelsRightsRightsUse AuthorizationsUse AuthorizationsSegregationsSegregationsLand StatusLand StatusSharedShared

GeometryGeometry

Survey Survey LinksLinks

NILS Conceptual Data ModelNILS Conceptual Data Model

Legal DescriptionLegal DescriptionFabricFabric

FeaturesFeaturesCornersCornersBoundariesBoundariesNonNon--PLSS ClassesPLSS ClassesPLSS ClassesPLSS Classes

Survey FeaturesSurvey FeaturesSurvey PointsSurvey PointsMeasuresMeasuresComputationsComputations

Survey FabricSurvey Fabric Survey Survey DatasetDataset

Feature Feature DatasetDataset

Page 27: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

GIS Data GIS Data (Before Survey Analyst) (Before Survey Analyst)

Boundaries

Geodetic Control

Surface Waters

Transportation

Land Ownership

Vector Data Layers

SoilsVegetationSlopeOthers …

Land coverImageryElevation

Raster Data Layers

Page 28: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

Boundaries

Geodetic Control

Surface Waters

Transportation

Land Ownership

Vector Data Layers

SoilsVegetationSlopeOthers …

Land coverImageryElevation

Raster Data Layers

Total Station Survey 1

Buildings 02.18.02

School Topo

SurveySurvey Data Layers (Projects)Data Layers (Projects)

GIS Data (After Survey Analyst) GIS Data (After Survey Analyst)

Page 29: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

Data is delivered 3 ways…

Page 30: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

1• Viewable from the web interface

Page 31: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

2• Downloadable as Shapefiles

Page 32: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

3• Accessible as a streaming ArcIMS layer

Page 33: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

Integrate with other data layers through Desktop or Mobile GIS

• Add data from the internet with the URL:

http://lsi.blm.gov

Page 34: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

Future Streaming Services…

• BLM National Conservation Areas– National Wild and Scenic Rivers– National Scenic Trails– National Historic Trails

• BLM Wilderness Areas• BLM Wilderness Study Areas• BLM Areas of Environmental Concern

Page 35: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation
Page 36: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

QUESTIONS

Page 37: The National Integrated Land System (NILS) - FIG National Integrated Land System (NILS) Larry Money June 24, ... •Poor spatial accuracy of base GIS features ... •BLM National Conservation

For additional Informationwww.blm.gov/nils

www.geocommunicator.gov

www.geocommunicator.gov/lsi

Streaming Service:

Map Service:http://www.lsi.blm.gov

Map Service: BLM_LSIS