30

The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

Embed Size (px)

Citation preview

Page 1: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture
Page 2: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture. Even that there were dangerous conditions for this type of work, no one died during the blasting and carving process.More than 90% of the excavation was performed by blasting 450,000 tons of granite, using over 20,000 Lb. of dynamite. The workers were very skilled, they could blast to within only 4" of the finished surface.

Page 3: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

The sculptor for the project was Gutzon Borglum who selected the mountain site. At 7,242 feet, it is the highest point between the Rockies and the Swiss Alps. Borglum selected for his sculpture four great American Presidents.He believed that these presidents represented the history of the United States. 

George Washington represented the birth of the United States.

Thomas Jefferson represented the growth of the United States.  Abraham Lincoln represented the preservation of the United States, despite the horror of the Civil War.  Theodore Roosevelt represented the development of the nation.

Page 4: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

All the masks were built to a scale 1:12

Page 5: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

The work advanced well, but there were a few problems. Jefferson's head was started on the left of Washington's head. However, the rock found there was too soft, therefore the work already performed was blasted away and restarted on the right side.

Page 6: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

MONUMENT BASIC DATA

Page 7: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

MANUAL WINCH TO HOIST MEN AND EQUIPMENT

PNEUMATIC DRILL TO MAKE HOLES FOR DYNAMITE INSERTION

Page 8: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

THE SCULPTOR IS VERIFYING THE WORK IN PROGRESS.

UNFORTUNATELYHE DIED A FEW MONTHS BEFORE THE SCULPTURE WAS FINISHED. HE WAS BURIED AT THE BASE OF THE MOUNTAIN.

HIS SON LINCOLN COMPLETED THE WORK.

Page 9: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture
Page 10: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

MOUNT RUSHMORE BEFORE THE BEGINNING OF THE SCULPTURE.

Page 11: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

MOUNT RUSHMORE IN 2009, SEEN FROM FAR AWAY.

Page 12: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture
Page 13: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

In 1966 Mount Rushmore was listed on the National Register of Historical Places and in 1991 it became a National Memorial.

Page 14: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

At the base of the monument there are full facilities including an auditorium where you can watch movies showing the history of the place and the construction of the statues. There is also a big terrace for a perfect view of the mountain.

Page 15: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture
Page 16: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

As you approach you can see the stone debris from the blasts and excavation.

Page 17: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

Trees start growing on the top of rocks.

Page 18: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

On top of Roosevelt's head is a type of tripod used to haul materials.The annual maintenance uses qualified mountain climbers who monitor and seal

cracks. The Monument was cleaned only once, in 2005, using pressurized water at over 200°F.

Page 19: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

To see more detail you need a binocular or a camera with a powerful zoom.

Page 20: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

The first American president, George Washington, the "Father of the Country"

Page 21: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

The third American president, Thomas Jefferson, who drafted The Declaration of Independence. During his presidency, America made

"The Louisiana Purchase", doubling the size of the nation.

Page 22: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

The "Great Emancipator," Abraham Lincoln, the 16th President, kept the nation united and liberated the slaves. He paid with his life in support of his fight for liberty for all.

Page 23: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

Theodore Roosevelt was America's 26th President.

During his presidency, the Panama Canal was completed, connecting the waters of the Atlantic and Pacific oceans.

Page 24: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

At the base of the monument there is a walking path named the "Presidential Trail," from where you can see the statues from different angles.

Page 25: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

Below the grand terrace is a large amphitheater.

Page 26: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

The amphitheater has a capacity for 2500 people and each night is almost full for a ceremony honoring the monument builders and the American military veterans. A film is presented showing the history of the place and the ceremony ends with the illumination of the monument.

Page 27: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

Powerful light projectors and speakers surround the monument.

Page 28: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture
Page 29: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture
Page 30: The Mount Rushmore National memorial was started in 1927 and was finished in 1941. There were about 400 men and women who worked making the sculpture

Touring information.

The Mount Rushmore National Monument is open every day of the year. There are extended hours in summer.

Entrance is free, however there is a parking fee. The parking ticket allows reentry if you plan to revisit for the night ceremony.

The Monument is located 24 miles from Rapid City which can be reached by many airlines. The nearest big city is Denver, Colorado, which is 309 miles away or a 50 minute flight.

There are several other big attractions in the area, like The Crazy Horse Memorial, The Badlands National Park and The Devil Tower in Wyoming.