The Keadby 3 Low Carbon Gas Power Station Project Document Ref: 4.7 Planning Inspectorate Ref: EN010114 The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order Land at and in the vicinity of the Keadby Power Station site, Trentside, Keadby, North Lincolnshire Indicative Proposed Power and Carbon Capture Layout, Elevations and Sections The Planning Act 2008 The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 - Regulation 5(2)(o) Applicant: Keadby Generation Limited Date: May 2021

The Keadby 3 Low Carbon Gas Power Station Project · The Keadby 3 Low Carbon Gas Power Station Project Document Ref: 4.7 Planning Inspectorate Ref: EN010114 The Keadby 3 (Carbon Capture

  • Upload
    others

  • View
    6

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Keadby 3 Low Carbon Gas Power Station Project · The Keadby 3 Low Carbon Gas Power Station Project Document Ref: 4.7 Planning Inspectorate Ref: EN010114 The Keadby 3 (Carbon Capture

The Keadby 3 Low Carbon Gas Power Station Project

Document Ref: 4.7

Planning Inspectorate Ref: EN010114

The Keadby 3 (Carbon Capture Equipped Gas Fired Generating Station) Order

Land at and in the vicinity of the Keadby Power Station site, Trentside, Keadby, North Lincolnshire

Indicative Proposed Power and Carbon Capture Layout, Elevations and Sections

The Planning Act 2008

The Infrastructure Planning (Applications: Prescribed Forms and Procedure) Regulations 2009 - Regulation 5(2)(o)

Applicant: Keadby Generation Limited

Date: May 2021

Page 2: The Keadby 3 Low Carbon Gas Power Station Project · The Keadby 3 Low Carbon Gas Power Station Project Document Ref: 4.7 Planning Inspectorate Ref: EN010114 The Keadby 3 (Carbon Capture

Document Ref: 4.7

Indicative Proposed Power and Carbon Capture Layout, Elevations and Sections

May 2021

DOCUMENT HISTORY

Document Ref 4.7/Indicative Proposed Power and Carbon Capture Layout, Elevations and Sections

Revision VP1.0

Document Owner AECOM

Page 3: The Keadby 3 Low Carbon Gas Power Station Project · The Keadby 3 Low Carbon Gas Power Station Project Document Ref: 4.7 Planning Inspectorate Ref: EN010114 The Keadby 3 (Carbon Capture

SHEET TITLE

Indicative Proposed Power and Carbon

Capture Layout and Elevations/Section

Plans

Sheet 1 of 5 - Key Plan

SHEET NUMBER

Aplication Document Ref. 4.7

60625943-PE-DRG-001

This d

raw

ing

has bee

n prepared for the use of A

EC

OM

’s clien

t. It m

ay no

t b

e used

, m

od

ified

, re

pro

du

ce

d or re

lied

up

on

by third

p

artie

s, e

xce

pt as a

gre

ed

b

y A

EC

OM

o

r a

s re

qu

ired

b

y la

w. A

EC

OM

acce

pts n

o respo

nsib

ility, a

nd d

enie

s an

y lia

bility w

hatso

eve

r, to

a

ny p

arty tha

t u

se

s o

r re

lie

s o

n th

is d

ra

wing

w

ith

ou

t A

EC

OM

’s e

xp

re

ss w

ritte

n co

nse

nt. D

o n

ot sca

le

this d

ocum

en

t. A

ll m

ea

su

re

me

nts m

ust b

e o

bta

in

ed

from

th

e sta

te

d d

im

en

sio

ns.

LEGEND

NOTES

Reproduced from Ordnance Survey

digital map data © Crown copyright

2021. All rights reserved. Licence

number 0100031673.

APPLICANT

Keadby Generation Limited

PROJECT NUMBER

60625943

The Keadby 3 (Carbon Capture

Equipped Gas Fired

Generating Station) Order

Regulation 5(2)(o) - Infrastructure

Planning (Applications: Prescribed

Forms and Procedures) Regulations

2009

This d

raw

ing

has bee

n prepared for the use of A

EC

OM

’s clien

t. It m

ay no

t b

e used

, m

od

ified

, re

pro

du

ce

d or re

lied

up

on

by third

p

artie

s, e

xce

pt as a

gre

ed

b

y A

EC

OM

o

r a

s re

qu

ired

b

y la

w. A

EC

OM

acce

pts n

o respo

nsib

ility, a

nd d

enie

s an

y lia

bility w

hatso

eve

r, to

a

ny p

arty tha

t u

se

s o

r re

lie

s o

n th

is d

ra

wing

w

ith

ou

t A

EC

OM

’s e

xp

re

ss w

ritte

n co

nse

nt. D

o n

ot sca

le

this d

ocum

en

t. A

ll m

ea

su

re

me

nts m

ust b

e o

bta

in

ed

from

th

e sta

te

d d

im

en

sio

ns.

Last saved by: D

AN

.R

AIL

EA

NU

(2

02

1-05-27

) L

ast P

lotted: 202

1-05-27

AutoC

AD

V

ersion: 22.0S

(LM

S T

EC

H)

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

___

__

__

___

____

_

File

nam

e: C

:\U

SE

RS

\D

AN

.R

AIL

EA

NU

\A

EC

OM

D

IR

EC

TO

RY

\K

EA

DB

Y 3

D

CO

D

ELIV

ER

AB

LE

S - G

EN

ER

AL

\W

OR

KIN

G\6

06

259

43

-P

E-D

RG

-00

1.D

WG

SHEET 2 OF 5 - LAYOUT VIEW SHEET 3 OF 5 - LAYOUT VIEW

SHEET 4 OF 5 - 3D AERIAL VIEW SHEET 5 OF 5 - ELEVATIONS VIEW

ISSUE PURPOSE

DCO APPLICATION

THE ORDER LIMITS

WORK NO. 1A CCGT PLANT

Works Plan:

WORK NO. 1B CCGT COOLING

INFRASTRUCTURE

WORK NO. 1C CARBON

CAPTURE PLANT

NORTH ELEVATION

SOUTH ELEVATION

EAST ELEVATION

WEST ELEVATION

CONSULTANT

AECOM LIMITED

GROUND FLOOR

2 CITY WALK

LEEDS, LS11 9AR

T:+44-(0)113-301-8400

WWW.AECOM.COM

0 25 50

1:1000

m

@A1

0 25 50

1:1000

m

@A1

0 25 50

1:1000

m

@A1

0 25 50

1:1000

m

@A1

PROJECT

The Keadby 3 (Carbon

Capture Equipped Gas

Fired Generating Station)

Order

WORK NO. 1E GENERATING

STATION SUPPORTING USES

AutoCAD SHX Text
WB
AutoCAD SHX Text
Track
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Keadby Common
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Track
AutoCAD SHX Text
Electricity Distribution Site
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
FB
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Bank
AutoCAD SHX Text
Drain
AutoCAD SHX Text
WB
AutoCAD SHX Text
Track
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Keadby Common
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Track
AutoCAD SHX Text
Electricity Distribution Site
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
FB
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Bank
AutoCAD SHX Text
Drain
Page 4: The Keadby 3 Low Carbon Gas Power Station Project · The Keadby 3 Low Carbon Gas Power Station Project Document Ref: 4.7 Planning Inspectorate Ref: EN010114 The Keadby 3 (Carbon Capture

LEGEND

AN

PO

BCFGH

J

EDIK

L

Q

M

0 25 50

1:1000

m

@A1

#Area

A Natural Gas Receiving Area

B Gas Turbine and Auxiliaries

C HRSG and Auxiliaries

D Steam Turbine and Auxiliaries

E Power Island Electrical

Equipment

F Flue Gas Fans and Ducting

G Flue Gas Cooling

H Absorber

I Stripping and Reclaiming

J Storage and offsites

K Compression and Dehydration

L National Grid CO2 AGI

M Cooling Towers

N Gate house, security and

parking

O Admin, control room and stores

buildings

P Raw water treatment

Q Attenuation pond

N

THE ORDER LIMITS

SHEET TITLE

Indicative Proposed Power and Carbon

Capture Layout and Elevations/Section

Plans

Sheet 2 of 5 - Layout View

SHEET NUMBER

Application Document Ref. 4.7

60625943-PE-DRG-002

LEGEND

NOTES

Reproduced from Ordnance Survey

digital map data © Crown copyright

2021. All rights reserved. Licence

number 0100031673.

APPLICANT

Keadby Generation Limited

PROJECT NUMBER

60625943

The Keadby 3 (Carbon Capture

Equipped Gas Fired

Generating Station) Order

Regulation 5(2)(o) - Infrastructure

Planning (Applications: Prescribed

Forms and Procedures) Regulations

2009

Last saved by: D

AN

.R

AIL

EA

NU

(2

02

1-05-27

) L

ast P

lotted: 202

1-05-27

AutoC

AD

V

ersion: 22.0S

(LM

S T

EC

H)

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

___

__

__

___

____

_

File

nam

e: C

:\U

SE

RS

\D

AN

.R

AIL

EA

NU

\A

EC

OM

D

IR

EC

TO

RY

\K

EA

DB

Y 3

D

CO

D

ELIV

ER

AB

LE

S - G

EN

ER

AL

\W

OR

KIN

G\6

06

259

43

-P

E-D

RG

-00

2.D

WG

ISSUE PURPOSE

DCO APPLICATION

This d

raw

ing

has bee

n prepared for the use of A

EC

OM

’s clien

t. It m

ay no

t b

e used

, m

od

ified

, re

pro

du

ce

d or re

lied

up

on

by third

p

artie

s, e

xce

pt as a

gre

ed

b

y A

EC

OM

o

r a

s re

qu

ired

b

y la

w. A

EC

OM

acce

pts n

o respo

nsib

ility, a

nd d

enie

s an

y lia

bility w

hatso

eve

r, to

a

ny p

arty tha

t u

se

s o

r re

lie

s o

n th

is d

ra

wing

w

ith

ou

t A

EC

OM

’s e

xp

re

ss w

ritte

n co

nse

nt. D

o n

ot sca

le

this d

ocum

en

t. A

ll m

ea

su

re

me

nts m

ust b

e o

bta

in

ed

from

th

e sta

te

d d

im

en

sio

ns.

CONSULTANT

AECOM LIMITED

GROUND FLOOR

2 CITY WALK

LEEDS, LS11 9AR

T:+44-(0)113-301-8400

WWW.AECOM.COM

PROJECT

The Keadby 3 (Carbon

Capture Equipped Gas

Fired Generating Station)

Order

AutoCAD SHX Text
WB
AutoCAD SHX Text
Track
AutoCAD SHX Text
Drain
AutoCAD SHX Text
2.2m
AutoCAD SHX Text
Keadby Common
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Track
AutoCAD SHX Text
Electricity Distribution Site
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
Track
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
FB
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Bank
AutoCAD SHX Text
Drain
Page 5: The Keadby 3 Low Carbon Gas Power Station Project · The Keadby 3 Low Carbon Gas Power Station Project Document Ref: 4.7 Planning Inspectorate Ref: EN010114 The Keadby 3 (Carbon Capture

LEGEND

0 25 50

1:1000

m

@A1

ITEM DESCRIPTION

WORK 1A - CCGT PLANT

1. FUEL GAS CONDITIONING PACKAGE2. GAS TURBINE HALL3. HRSG BUILDING4. STEAM TURBINE HALL5. STEAM TURBINE INSTRUMENT BUILDING6. TRANSFORMER YARD7. EMERGENCY DIESEL GENERATOR8. POWER ISLAND AUXILIARY BUILDING9. FLUE GAS BOOSTER FAN

WORK 1B - CCGT COOLING INFRASTRUCTURE

10. COOLING TOWER11. COOLING TOWER PUMPS12. COOLING TOWER AREA ELECTRICAL AND INSTRUMENT

BUILDING13. RETENTION POND

WORK 1C - CARBON CAPTURE PLANT

14. DIRECT CONTACT COOLER15. DIRECT CONTACT COOLER CIRCULATING WATER COOLER16. DIRECT CONTACT COOLER BD AIR STRIPPER17. ABSORBER18. LEAN/RICH AMINE INTERCHANGER19. ABSORBER AREA ELECTRICAL AND INSTRUMENT BUILDING20. CO2 STRIPPER21. CO2 STRIPPER CONDENSER22. CO2 STRIPPER REFLUX DRUM23. CO2 STRIPPER REBOILER24. THERMAL RECLAIMER25. CO2 STRIPPER AREA ELECTRICAL AND INSTRUMENT

BUILDING26. AMINE STORAGE TANK27. CO2 COMPRESSOR LP STAGE28. CO2 DE-OXYGENATION PACKAGE29. CO2 DEHYDRATION PACKAGE30. CO2 COMPRESSOR HP STAGE31. NATIONAL GRID AGI - CO2 EXPORT32. FIRE WATER TANK33. FIRE WATER PUMP BUILDING34. DEMIN WATER TANK

WORK 1E - GENERATING STATION SUPPORTING USES

35. ADMIN BUILDING36. CONTROL ROOM37. STORES BUILDING38. WATER TREATMENT BUILDING39. RAW WATER BALANCING TANK40. TREATED WATER TANK

OTHER PLANT AREAS

41. NATIONAL GRID AGI - NATURAL GAS42. SSE AGI - NATURAL GAS43. GUARD HOUSE44. MAIN CAR PARK45. VISITOR CAR PARK46. OVERFLOW CAR PARK

41

42

44

46

45

43

35 40 39

383736

1

29

1417

15161926

34

33

32

6

78

54

18

25

23202324292831

13

1211

10

2730

THE ORDER LIMITS

N

2122

WORK NO. 1A CCGT PLANT

Works Plan:

WORK NO. 1B CCGT COOLING

INFRASTRUCTURE

WORK NO. 1C CARBON

CAPTURE PLANT

0 25 50

1:1000

m

@A1

N

SHEET TITLE

Indicative Proposed Power and Carbon

Capture Layout and Elevations/Section

Plans

Sheet 3 of 5 - Layout View

SHEET NUMBER

Application Document Ref. 4.7

60625943-PE-DRG-003

NOTES

Reproduced from Ordnance Survey

digital map data © Crown copyright

2021. All rights reserved. Licence

number 0100031673.

APPLICANT

Keadby Generation Limited

PROJECT NUMBER

60625943

The Keadby 3 (Carbon Capture

Equipped Gas Fired

Generating Station) Order

Regulation 5(2)(o) - Infrastructure

Planning (Applications: Prescribed

Forms and Procedures) Regulations

2009

Last saved by: D

AN

.R

AIL

EA

NU

(2

02

1-05-27

) L

ast P

lotted: 2021

-05-27

AutoC

AD

V

ersion: 22.0S

(LM

S T

EC

H)

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

___

__

__

___

____

_

File

nam

e: C

:\U

SE

RS

\D

AN

.R

AIL

EA

NU

\A

EC

OM

D

IR

EC

TO

RY

\K

EA

DB

Y 3

D

CO

D

ELIV

ER

AB

LE

S - G

EN

ER

AL

\W

OR

KIN

G\6

06

259

43

-P

E-D

RG

-00

3.D

WG

ISSUE PURPOSE

DCO APPLICATION

This d

raw

ing

has bee

n prepared for the use of A

EC

OM

’s clien

t. It m

ay no

t b

e used

, m

od

ified

, re

pro

du

ce

d or re

lied

up

on

by third

p

artie

s, e

xce

pt as a

gre

ed

b

y A

EC

OM

o

r a

s re

qu

ired

b

y la

w. A

EC

OM

acce

pts n

o respo

nsib

ility, a

nd d

enie

s an

y lia

bility w

hatso

eve

r, to

a

ny p

arty tha

t u

se

s o

r re

lie

s o

n th

is d

ra

wing

w

ith

ou

t A

EC

OM

’s e

xp

re

ss w

ritte

n co

nse

nt. D

o n

ot sca

le

this d

ocum

en

t. A

ll m

ea

su

re

me

nts m

ust b

e o

bta

in

ed

from

th

e sta

te

d d

im

en

sio

ns.

CONSULTANT

AECOM LIMITED

GROUND FLOOR

2 CITY WALK

LEEDS, LS11 9AR

T:+44-(0)113-301-8400

WWW.AECOM.COM

PROJECT

The Keadby 3 (Carbon

Capture Equipped Gas

Fired Generating Station)

Order

3

WORK NO. 1E GENERATING

STATION SUPPORTING USES

AutoCAD SHX Text
WB
AutoCAD SHX Text
Track
AutoCAD SHX Text
Drain
AutoCAD SHX Text
2.2m
AutoCAD SHX Text
Keadby Common
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Track
AutoCAD SHX Text
Electricity Distribution Site
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
Track
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
FB
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Bank
AutoCAD SHX Text
2.3m
AutoCAD SHX Text
Drain
Page 6: The Keadby 3 Low Carbon Gas Power Station Project · The Keadby 3 Low Carbon Gas Power Station Project Document Ref: 4.7 Planning Inspectorate Ref: EN010114 The Keadby 3 (Carbon Capture

LEGEND

SHEET TITLE

Indicative Proposed Power and Carbon

Capture Layout and Elevations/Section

Plans

Sheet 4 of 5 - 3D Aerial View

SHEET NUMBER

Application Document Ref. 4.7

60625943-PE-DRG-004

NOTES

Reproduced from Ordnance Survey

digital map data © Crown copyright

2021. All rights reserved. Licence

number 0100031673.

APPLICANT

Keadby Generation Limited

PROJECT NUMBER

60625943

The Keadby 3 (Carbon Capture

Equipped Gas Fired

Generating Station) Order

Regulation 5(2)(o) - Infrastructure

Planning (Applications: Prescribed

Forms and Procedures) Regulations

2009

Last saved by: D

AN

.R

AIL

EA

NU

(2

02

1-05-27

) L

ast P

lotted: 202

1-05-27

AutoC

AD

V

ersion: 22.0S

(LM

S T

EC

H)

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

___

__

__

___

____

_

File

nam

e: C

:\U

SE

RS

\D

AN

.R

AIL

EA

NU

\A

EC

OM

D

IR

EC

TO

RY

\K

EA

DB

Y 3

D

CO

D

ELIV

ER

AB

LE

S - G

EN

ER

AL

\W

OR

KIN

G\6

06

259

43

-P

E-D

RG

-00

4.D

WG

ISSUE PURPOSE

DCO APPLICATION

N

This d

raw

ing

has bee

n prepared for the use of A

EC

OM

’s clien

t. It m

ay no

t b

e used

, m

od

ified

, re

pro

du

ce

d or re

lied

up

on

by third

p

artie

s, e

xce

pt as a

gre

ed

b

y A

EC

OM

o

r a

s re

qu

ired

b

y la

w. A

EC

OM

acce

pts n

o respo

nsib

ility, a

nd d

enie

s an

y lia

bility w

hatso

eve

r, to

a

ny p

arty tha

t u

se

s o

r re

lie

s o

n th

is d

ra

wing

w

ith

ou

t A

EC

OM

’s e

xp

re

ss w

ritte

n co

nse

nt. D

o n

ot sca

le

this d

ocum

en

t. A

ll m

ea

su

re

me

nts m

ust b

e o

bta

in

ed

from

th

e sta

te

d d

im

en

sio

ns.

CONSULTANT

AECOM LIMITED

GROUND FLOOR

2 CITY WALK

LEEDS, LS11 9AR

T:+44-(0)113-301-8400

WWW.AECOM.COM

PROJECT

The Keadby 3 (Carbon

Capture Equipped Gas

Fired Generating Station)

Order

0 25 50

1:1000

m

@A1

0 25 50

1:1000

m

@A1

Page 7: The Keadby 3 Low Carbon Gas Power Station Project · The Keadby 3 Low Carbon Gas Power Station Project Document Ref: 4.7 Planning Inspectorate Ref: EN010114 The Keadby 3 (Carbon Capture

LEGEND

NORTH ELEVATION

SOUTH ELEVATION

SHEET TITLE

Indicative Proposed Power and Carbon

Capture Layout and Elevations/Section

Plans

Sheet 5 of 5 - Elevations View

SHEET NUMBER

Application Document Ref. 4.7

60625943-PE-DRG-005

NOTES

Reproduced from Ordnance Survey

digital map data © Crown copyright

2021. All rights reserved. Licence

number 0100031673.

APPLICANT

Keadby Generation Limited

PROJECT NUMBER

60625943

The Keadby 3 (Carbon Capture

Equipped Gas Fired

Generating Station) Order

Regulation 5(2)(o) - Infrastructure

Planning (Applications: Prescribed

Forms and Procedures) Regulations

2009

Last saved by: D

AN

.R

AIL

EA

NU

(2

02

1-05-27

) L

ast P

lotted: 202

1-05-27

AutoC

AD

V

ersion: 22.0S

(LM

S T

EC

H)

Proje

ct M

ana

gem

ent Initials:

Desig

ner:

Che

cked:

Ap

proved:

___

__

__

___

____

_

File

nam

e: C

:\U

SE

RS

\D

AN

.R

AIL

EA

NU

\A

EC

OM

D

IR

EC

TO

RY

\K

EA

DB

Y 3

D

CO

D

ELIV

ER

AB

LE

S - G

EN

ER

AL

\W

OR

KIN

G\6

06

259

43

-P

E-D

RG

-00

5.D

WG

ISSUE PURPOSE

DCO APPLICATION

PLAN VIEWSOUTH ELEVATION

NORTH ELEVATION

EAST

ELEVATION

WEST

ELEVATION

EAST ELEVATION

WEST ELEVATION

Steam Turbine Hall

Maximum Anticipated Height 35m (AGL), 37.6m (AOD)

CO2 Stripper

Maximum Anticipated Height 53m (AGL), 55.6m (AOD)

Gas Turbine Hall

Maximum Anticipated Height 32m (AGL), 34.6m (AOD)

HSRG Building

Maximum Anticipated Height 56m (AGL), 58.6m (AOD)

HSRG Building Stack

Maximum Anticipated Height 85m (AGL), 87.6m (AOD)

(not to scale)

Direct Contact Cooler

Cooling Tower

Absorber Stack

Maximum Anticipated Height 105m (AGL), 107.6m (AOD)

(not to scale)

CO2 Stripper

Maximum Anticipated Height 53m (AGL), 55.6m (AOD)

Gas Turbine Generator Hall

This d

raw

ing

has bee

n prepared for the use of A

EC

OM

’s clien

t. It m

ay no

t b

e used

, m

od

ified

, re

pro

du

ce

d or re

lied

up

on

by third

p

artie

s, e

xce

pt as a

gre

ed

b

y A

EC

OM

o

r a

s re

qu

ired

b

y la

w. A

EC

OM

acce

pts n

o respo

nsib

ility, a

nd d

enie

s an

y lia

bility w

hatso

eve

r, to

a

ny p

arty tha

t u

se

s o

r re

lie

s o

n th

is d

ra

wing

w

ith

ou

t A

EC

OM

’s e

xp

re

ss w

ritte

n co

nse

nt. D

o n

ot sca

le

this d

ocum

en

t. A

ll m

ea

su

re

me

nts m

ust b

e o

bta

in

ed

from

th

e sta

te

d d

im

en

sio

ns.

CONSULTANT

AECOM LIMITED

GROUND FLOOR

2 CITY WALK

LEEDS, LS11 9AR

T:+44-(0)113-301-8400

WWW.AECOM.COM

0 25 50

1:1000

m

@A1

0 25 50

1:1000

m

@A1

Existing OHL Towers and Transmission Lines

PROJECT

The Keadby 3 (Carbon

Capture Equipped Gas

Fired Generating Station)

Order

Absorber

Maximum Anticipated Height 99m (AGL), 101.6m (AOD)

(not to scale)

AutoCAD SHX Text
WB
AutoCAD SHX Text
Track
AutoCAD SHX Text
Drain
AutoCAD SHX Text
2.2m
AutoCAD SHX Text
Keadby Common
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Track
AutoCAD SHX Text
Electricity Distribution Site
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
Track
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Gantry
AutoCAD SHX Text
FB
AutoCAD SHX Text
Drain
AutoCAD SHX Text
Bank
AutoCAD SHX Text
2.3m
AutoCAD SHX Text
Drain