The INDOT CORS Indiana GIS Conference

February 19, 2008

By William A. Schmidt, PE, LS

Manager of Aerial Engineering, INDOTThomas A. Mahon, PE, LS

Survey Group Manager, Woolpert Inc

Page 2: The INDOT CORS Indiana GIS Conference February 19, 2008

What is a CORS?

• Continuously Operating Reference Station

• Operated by Others

• Operates continuously

• Data available for Post-Processing

• Data may be available in real-time

Page 3: The INDOT CORS Indiana GIS Conference February 19, 2008

Advantages of a CORS

• Single coordinate system

• Uniform precision

• No need to setup base stations

• Avoids base station radio issues

• Frees up base stations as rovers

• Increases productivity

• Ease of use

Page 4: The INDOT CORS Indiana GIS Conference February 19, 2008

Existing CORSNGS

Page 5: The INDOT CORS Indiana GIS Conference February 19, 2008

Existing CORS (cont’d)Seiler Instruments (01/15/08)

Page 6: The INDOT CORS Indiana GIS Conference February 19, 2008

INDOT’s Primary Network17 New Stations

Page 7: The INDOT CORS Indiana GIS Conference February 19, 2008

Typical Installation

• Add state map showing INDOT facilities

• Add picture of a maintenance yard

Page 8: The INDOT CORS Indiana GIS Conference February 19, 2008

Primary Monumentation

Page 9: The INDOT CORS Indiana GIS Conference February 19, 2008

Primary Monumentation (Cont’d)

Page 10: The INDOT CORS Indiana GIS Conference February 19, 2008

Primary Monumentation (Cont’d)

Page 11: The INDOT CORS Indiana GIS Conference February 19, 2008

Primary Monumentation (cont’d)

Page 12: The INDOT CORS Indiana GIS Conference February 19, 2008

Secondary Monumentation

Page 13: The INDOT CORS Indiana GIS Conference February 19, 2008

Station Locations

• Primary Station Locations– Indiana Department of

Transportation Facilities– Other State Facilities

• Secondary Station Locations– Other State Facilities– Higher Education (Possibly)– Private Consultants (Unlikely)

Page 14: The INDOT CORS Indiana GIS Conference February 19, 2008

Network Administration

• INDOT Funded Primary Network and it is under construction

• Indiana Office of Technology (IOT) to Maintain Servers

• Servers dedicated to INDOT CORS

• Network Operations and Maintenance by INDOT Aerial Engineering (John Kurtz, LS)

Page 15: The INDOT CORS Indiana GIS Conference February 19, 2008

Budgets

• Initial Capital Costs– Primary Network: $400,000– Secondary Network: $700,000

• Annual Operating Budget: to be determined– Hardware and Software Upgrades– Additional User Licenses (no charge)– Network Administration (IOT fees)

Page 16: The INDOT CORS Indiana GIS Conference February 19, 2008

Schedule

• Procurement Bids – March 2007• Bids Received – April 2007• Bid Awarded – April 2007• Begin Primary Installations – November 2007• Complete Primary Installation, including

operational network – Anticipated Summer of 2008

• Begin Secondary Installation – Anticipated Spring 2008

• Complete Secondary Installation – Projected by the end of 2008

Page 17: The INDOT CORS Indiana GIS Conference February 19, 2008

CORS Access

• Post-Processing– Free & Available from a web location to be

determined

• Real-Time Kinematic– Controlled by user name and password– Up to 300 concurrent users w/o paying for

additional access licenses– May develop a fee-based system of

access to support maintenance, upgrades, and IOT fees

Page 18: The INDOT CORS Indiana GIS Conference February 19, 2008

CORS Access (Cont’d)

• Real-Time Differential– Coast Guard Beacons (10 m h

68%)– WAAS FAA (7 m h&v 95%)– Third Party Vendors Omnistar

(submeter 95%)– INDOT CORS (subdecimeter 95%)– Potential fee schedule similar to

RTK

Page 19: The INDOT CORS Indiana GIS Conference February 19, 2008

CORS Challenge

• Real Time RTK – Vertical– Hundredths vs. Tenths

Page 20: The INDOT CORS Indiana GIS Conference February 19, 2008

CORS Challenge (Cont’d)

• Solution to the Vertical– Height Modernization

• Better Geoid Model Development• Densification of Benchmarks

throughout Indiana• Elevations on existing HARN

Monuments• Elevations on CORS Stations• More Gravity Readings

Page 21: The INDOT CORS Indiana GIS Conference February 19, 2008

INDOT CORS

• Questions?