13
SYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here The Gingham Watercourse, how a bi-plane aided restoration. Daryl Albertson Conservation & Regional Delivery, NSW Office of Environment & Heritage.

The Gingham Watercourse, Place yourriversymposium.com/wp-content/uploads/2018/11/104.pdfSYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here ... excavator hire,

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The Gingham Watercourse, Place yourriversymposium.com/wp-content/uploads/2018/11/104.pdfSYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here ... excavator hire,

SYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY

Place yourlogo here

The Gingham Watercourse, how a bi-plane aided restoration.

Daryl Albertson Conservation & Regional Delivery,

NSW Office of Environment & Heritage.

Page 2: The Gingham Watercourse, Place yourriversymposium.com/wp-content/uploads/2018/11/104.pdfSYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here ... excavator hire,

SYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY

Place yourlogo hereMy Role

Aquatic and Wetlands Ecologist

Current titleSenior Wetlands & Rivers Conservation Officer,

Employed since 1998 in NSW Government (Environment).

Principle role: Environmental water management, across the Northern NSW catchments.

Most recent focus (2006 – current), the Gwydir River & its catchment.

‘I’m no technocrat, but apply the tools that assist my role’

Page 3: The Gingham Watercourse, Place yourriversymposium.com/wp-content/uploads/2018/11/104.pdfSYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here ... excavator hire,

SYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY

Place yourlogo here

Gwydir River Delta and its Wetlands SystemNorth West New South Wales, Australia.

Page 4: The Gingham Watercourse, Place yourriversymposium.com/wp-content/uploads/2018/11/104.pdfSYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here ... excavator hire,

SYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY

Place yourlogo hereThe Gingham Watercourse

part the iconic (Ramsar listed) Gwydir Wetlands system

Page 5: The Gingham Watercourse, Place yourriversymposium.com/wp-content/uploads/2018/11/104.pdfSYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here ... excavator hire,

SYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY

Place yourlogo here

• Flat, semi-arid low rainfall environment (Av. 500 mm annual);

• Unique remnant of a western flowing semi-permanent wetlands complex;

• Significant to the local people of the Kamilaroi Aboriginal Nation;

• Home to 75 waterbirds, 50 known to have bred, a number of migratory species;

• History of large colonial waterbirds nesting events;

• Important for survival of waterbirds populations across the Murray Darling Basin;

• Late 1970s Copeton Dam was built, 50+ kms of constructed channels were cut along the most direct path west, for annual farm and stock water;

• Open channels continually drained the wetlands west and greatly influenced inundation extent and duration, resulting in 30 years of wetlands/floodplain drying;

• The 2006/07 drought period resulted in a further impoverished wetlands system.

The Environment

Page 6: The Gingham Watercourse, Place yourriversymposium.com/wp-content/uploads/2018/11/104.pdfSYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here ... excavator hire,

SYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY

Place yourlogo hereThe Gingham Watercourse Project Area

Page 7: The Gingham Watercourse, Place yourriversymposium.com/wp-content/uploads/2018/11/104.pdfSYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here ... excavator hire,

SYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY

Place yourlogo here

• 2009 River Environmental Restoration Program (RERP) sought to provide landholders with a piped homestead water supply;

• 250 Km of trenched pipeline constructed;

• 52 Households connected;

• Over a floodplain area of 90,000 Hectares;

• $2.3 million infrastructure costs, $2.8 million total cost;

• As a result, the open channel network was redundant, enabling NSW OEH to began the watercourse restoration process;

• $283,000 additional for Environmental Restoration

• $283K included environmental reviews, approvals including Commonwealth Govt. (EPBC) Referral, rocks, small scale infrastructure, channel infilling and excavator hire, all combined to begin the process of self–repair.

The ProjectGingham Homestead Water Supply

Page 8: The Gingham Watercourse, Place yourriversymposium.com/wp-content/uploads/2018/11/104.pdfSYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here ... excavator hire,

SYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY

Place yourlogo here

Wetland Restoration Where to begin ?

Lidar (2009).

Gingham Project Area

Page 9: The Gingham Watercourse, Place yourriversymposium.com/wp-content/uploads/2018/11/104.pdfSYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here ... excavator hire,

SYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY

Place yourlogo hereHillshade for Landscape Features

Page 10: The Gingham Watercourse, Place yourriversymposium.com/wp-content/uploads/2018/11/104.pdfSYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here ... excavator hire,

SYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY

Place yourlogo hereA chance find – Eureka !

Taken by Adastra Airways 1935

Wako G-ACGJ taken at Brisbane Airport 1935

Page 11: The Gingham Watercourse, Place yourriversymposium.com/wp-content/uploads/2018/11/104.pdfSYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here ... excavator hire,

SYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY

Place yourlogo here

Now clear evidence of pre-1970s natural condition

Page 12: The Gingham Watercourse, Place yourriversymposium.com/wp-content/uploads/2018/11/104.pdfSYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here ... excavator hire,

SYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY

Place yourlogo here

The Gingham Watercourse Today

Given ½ a chance and

time, the environment

will self repair.

Project target 3000 Hectares. Latest estimate 5000 Hectares.

Page 13: The Gingham Watercourse, Place yourriversymposium.com/wp-content/uploads/2018/11/104.pdfSYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY Place your logo here ... excavator hire,

SYDNEY, AUSTRALIA | 14 -18 October 2018 MANAGED BY

Place yourlogo here

Time and water will now return the Gingham Watercourse to its

pre-1970s condition.

Thankyou for the opportunity.

Any Questions ??

The natural process of self repair has begun