Upload
others
View
10
Download
0
Embed Size (px)
Citation preview
PROJECT Gherkin Restaurant
The restaurant and bar situated on the
39th & 40th floors feature panoramic
views and an amazing helix atrium from
which the restaurant takes its name.
The restaurant and bar operated by
Searcys was originally for members only,
however after a recent refurbishment, it
is now open to the public.
As part of the refurbishment project,
Benif Zinc effect Interior film supplied
by leading surface material distributor
David Clouting was selected to recover
tables, bar areas and lift interiors.
Specialist contractors T6 were able to
carry out the work in only four nights in
time for the official opening to the public.
Manufactured by LG Hausys, Benif is a
self-adhesive, architectural film that can
be quickly and easily applied to almost
any interior surface.
The results of the refurbishment were
both visually pleasing, cost effective
and practical thanks to the Benif’s
low maintenance requirements and
longevity of performance.
With over 400 Benif designs and finishes
to choose from, walls, doors, paneling,
skirting and architrave can be quickly
transformed without the need for costly
replacements.
Benif Interior Film has CE and IMO
Certification.
The Gherkin is one of the most iconic buildings on the London landscape.
Benif Interior Film selected for
Gherkin restaurant refurbishment
How to contact us:For product samples: [email protected]
For sales enquiries/orders: [email protected]
For general product information: [email protected]
DAVID CLOUTING LTDHEAD OFFICE: Unit 650, The Hub, Skyline 120, Avenue West, Braintree CM77 7AA | Tel: 01376 518037 | Fax: 01376 500104 | Email: [email protected] | www.davidclouting.co.ukNORTHERN OFFICE: Unit 4A, Shawcross Business Park, Dewsbury, West Yorkshire WF12 7RF | Tel: 01924 458333 | Fax: 01924 458444
www.davidclouting.co.uk
PROJECT Gherkin Restaurant
Benif Zinc effect
Interior Film was used for this
refurbishment
The results were visually pleasing and cost effective
Specialist contractor T6
carried out the work over four
nights