The future for DHCin Brescia and Milano
Venice, 26.05.2009
Lorenzo SpadoniA2A Spa - Italy
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 2
A2A - OVERVIEW
1st Italianplayer
1st Italianplayer
2nd EE player3rd gas player
1st utility forclients andturnover
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 3
A2A – FIGURES YEAR 2008
REVENUES: 6,1 billion Euro
EBITDA: 1,1 billion Euro
NET INCOME: 0,3 billion Euro
ELECTRIC INSTALLED POWER: 3,7 GW
ELECTRICITY SALES: 26,5 billion kWh
ELECTRICITY DISTRIBUITED: 12,2 billion kWh
GAS SALES: 5,2 billion m3
GAS DISTRIBUITED: 1,9 billion m3
DH HEAT SALES: 1,9 billion kWh
WASTE TREATED/DISPOSED: 2,9 million tons
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 4
• Brescia DH system: today situation
• Brescia DH system: future developments
• Brescia DC system
• Milan DH system: today situation
• Milan DH system: future developments
Agenda
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 5
39,4 Mm3 heated volume
606 km of double pipe
18.889 connected buildings
130.000 inhabitants supplied
695 MWt of installed power
1 km
C.le Nord
C.le Lamarmora
Termoutilizzatore
BRESCIA DISTRICT HEATING – EXISTING SITUATION
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 6
BRESCIA DISTRICT HEATING – ANNUAL GROWTH
02468
10121416182022242628303234363840
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
2008
YEAR
HE
AT
ED
VO
LUM
E (
10
^6
m3
)
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 7
BRESCIA DISTRICT HEATING
THERMAL POWER AVALIABLE FOR DISTRICT HEATING(2008)
Year of P thermal P electric cogenerated Fuelconstruction (MW) (MW)
Lamarmora 359Unit 1 1978 84 31 Natural Gas/Fuel Oil
Unit 2 1981 87 33 Natural Gas/Fuel Oil
Unit 3 1987 130 75 Coal/Natural Gas/Fuel Oil
Boiler Macchi 3 1977 58 - Natural Gas
Termoutilizzatore 1998 160 84 Waste
North Plant
Boiler Fochi 90 - Natural Gas
Boiler Bono 12 - Natural Gas
New boiler Bono 59 - Natural Gas
Other plants 15
TOT 695 223
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 8
0200400600800
1.0001.2001.4001.6001.8002.0002.2002.4002.6002.8003.0003.2003.4003.6003.8004.000
GW
h
1972
1973
1974
1975
1976
1977
1978
1979
1980
1981
1982
1983
1984
1985
1986
1987
1988
1989
1990
1991
1992
1993
1994
1995
1996
1997
1998
1999
2000
2001
2002
2003
2004
2005
2006
2007
ANNI
COMBUSTIBILI IMPIEGATI
BRESCIA DISTRICT HEATING
• natural gas
• oil
• coal
• municipal waste and biomass
FUEL USED INBRESCIA DISCTRICT HEATING PLANTS
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 9
BRESCIA DISTRICT HEATING
2008 OPERATIONAL DATA
Heat supplied by district heating:at customer boundaries: 1.053 GWhtat power plant boundaries: 1.292 GWht
Cogenerated electricity: 857 GWhe
Maximum heat produced(5 gennaio 2009): 560 MWt
PRF = 0,2 According to UNI EN 15316-4-5 May 2008and prEn 15603 final draft August 2007
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 10
TERMOUTILIZZATORE(the waste to energy plant of Brescia )
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 11
TERMOUTILIZZATORE BRESCIA2006 "Industry award"
WTERT - Columbia University - New York
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 12
OPERATIONS DATA 2008:
Treated waste( of which biomass 274.000 tons )
Electricity production (net)
District heating
Fossil fuels saving (Tons of Oil Equivalent)
CO2 avoided emissions
801.000 tons
570 Gwhel
568 Gwhth
> 150.000 TOE
> 400.000 tons
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 13
STACK EMISSIONSmg/Nm3
(excepted TCDD in ng/Nm3)dry, 11% O2
AUTORIZZ.REGIONALE
1993
DESIGN DATA
1994
EUROPEANDIRECTIVE2000/76/CE
(recepit in Italyin 2005)
ACTUALOPERATIONAL
DATA(typical)
Dust 10 3 10 <0,5SO2 150 40 50 10NOx 200 100 200 80HCl 30 20 10 4HF 1 1 1 0,1CO 100 40 50 15Heavy metals 2 0,5 0,5 0,01Cd 0,1 0,02 0,05 0,002Hg 0,1 0,02 0,05 0,002IPA 0,05 0,01 0,01 <0,001TCDD Teq ng/Nm3 0,1 0,1 0,1 <0,005
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 14
• Brescia DH system: today situation
• Brescia DH system: future developments
• Brescia DC system
• Milan DH system: today situation
• Milan DH system: future developments
Agenda
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 15
BRESCIA DISTRICT HEATING FUTURE developmentS- SCENARIO 2020 -
HEATED VOLUME: 45 Mm3
MAXIMUM PEAK OF HEAT REQUIRED: 720 MWt
ANNUAL THERMAL ENERGY REQUIRED: 1.791 GWht
02468
10121416182022242628303234363840424446
1972
1974
1976
1978
1980
1982
1984
1986
1988
1990
1992
1994
1996
1998
2000
2002
2004
2006
2008
2010
2012
2014
2016
2018
2020
VOLU
MET
RIA
ALL
AC
CIA
TA 1
0̂6
m3
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 16
BRESCIA DH : FUTURE developmentS
IMPROVEMENT OF GENERATION SYSTEM
IMPROVEMENT OF NOX CONTROL:
• WTE PLANT: HIGH DUST SCR• LAMARMORA COAL BOILER: DENOX SCR
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 17
Brescia DH: developments in generation system
Repowering of Termoutilizzatore•new steam turbine•replacements of heating surfaces on boiler 1 and 2•substitution of the fabric filters
High efficiency solutions for Lamarmora plant underevaluation.
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 18
IMPLEMENTED NOx CONTROL IN BRESCIA WTE(since 1998)
• PRIMARY\
- low combustion excess air- 30 compartment grate- infrared camera foroptimization of air supply
- flue gas recirculation
• SECONDARY (NOx reduction)
- SNCR (NH3 injection with 27 nozzles, positioned atthree levels)
Brescia DH developments: NOx Reduction
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 19HIGH DUST SCR LOCATION
HIGH DUST SCR
Brescia DH developments: NOx Reduction
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 20
• installation: 2005 Sep. – 2006 Feb.
• operation: started 2006 Mar. (1st phase – one cat. layer)
• inspection: Sep. 2006 (cleaning and catalyst analysisshowing some pore plugging and catalystpoisoning with sulphates)
• 2nd phase: started 2006 Oct. after inspection (2 cat. layer)
• inspections: 2007 Apr. and Sep. (only cleaning)2008 Apr. (erosion starts to become evident)
November: removal of one layer and installation of a new layerwith modified geometry
High Dust SCR - HighlightsBrescia DH developments: NOx Reduction
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 21
2 SCR LAYER (24 months operation):
• NOx: 80 à 60 mg/Nm3
• NH3 slip: 12 à 1 - 4 mg/Nm3
• NH3 consumption: 0.22 à 0.20 m3/h (25% concentrated)
• PRESSURE LOSS: < 2 m bar
SCR “HIGH DUST”2nd PHASE TEST RESULTS (preliminary)
Brescia DH developments: NOx Reduction
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 22
NOx – NH3 consumption – ammonia slipHIGH DUST SCR RESULTS
NOx- NH3 emissions
0
10
20
30
40
50
60
70
80
90
1/1/06 1/5/06 29/8/06 27/12/06 26/4/07 24/8/07 22/12/07 20/4/08 18/8/08
NO
x - N
H3 s
tack
em
issi
ons
[mg/
Nm
³]
0
100
200
300
400
500
600
NH3 c
onsu
mpt
ion
[l/h]
NOx
NH3slipNH3cons.
74
12
4,4
8
1,3 1,83,7
SCR operation start(1 layer)
Start with2nd layer
217
2,5
70
44
33
53
66
61
67
58
69
179
166
184186
219200
44,9
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 23
CATALYST AFTER 2 YEARS OF OPERATION
TERMOUTILIZZATORE(The waste to energy plant of Brescia)
Before Cleaning
After Cleaning
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 24
SCR HIGH DUST ON THE COAL BOILER OF LAMARMORA PLANT
EXPECTED NOx EMISSION AFTER DENOX INSTALLATION: < 150 mg/Nm3
• BOILER THERMAL POWER: 200 MW
• FLUE GAS FLOW: 230 KNm3/h
• NOX EMISSION: 500 mg/Nm3
Brescia DH developments: NOx Reduction
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 25
• Brescia DH system: today situation
• Brescia DH system: future developments
• Brescia DC system
• Milan DH system: today situation
• Milan DH system: future developments
Agenda
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 26
COOL WATER PLANT:
- Cooling power installed 19,2 MWch
- Nr unit installed 6 unità
- Technology Centrifugal Chiller Electric withinverter, cooled by water
- Pumping system One stage with variable mass flow
- Aux. cooling system Evaporative tower
- Running period 12 months/year; 24hours/day
- COPchiller yearly average 6,76
- COPplant yearly average 4,49
Network
- Lenght of double pipe 4,8 km
- Customer Hospital, University, Office
- Cooled volume 575.000 m3
- Yearly cooling energy 24,6 GWh/anno
Note: data refered to 2008
Universitydistrictcooling
Hospitaldistrictcooling
COOL WATERPLANT
DISTRICT COOLING SYSTEM – BRESCIA NORTH
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 27
COOLING PLANT “BRESCIA NORTH”
District CoolingPumps
Auxiliary pumps(for evaporativetower)
ChillerAuxiliary coolingsystem
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 28
• Brescia DH system: today situation
• Brescia DH system: future developments
• Brescia DC system
• Milan DH system: today situation
• Milan DH system: future developments
Agenda
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 29
MILANO DISTRICT HEATING – EXISTING SITUATION
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 30
MILANO DISTRICT HEATING
2008 DATA
Connected thermal power: 360 MW
Inhabitants: 183.000
Heated volume: 17,4 Mm3
Heat sold: 514 GWh
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 31
• Brescia DH system: today situation
• Brescia DH system: future developments
• Brescia DC system
• Milan DH system: today situation
• Milan DH system: future developments
Agenda
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 32
MILANO DISTRICT HEATING – FUTURE DEVELOPMENT
HE
AT
ED
PO
WE
R
year
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 33
MILANO DISTRICT HEATING – FUTURE DEVELOPMENT
INH
AB
ITA
NT
S C
ON
NE
CT
ED
year
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 34
MILANO DISTRICT HEATING – FUTURE DEVELOPMENT
NE
TW
OR
K d
eve
lop
men
t
year
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 35
MILANO DISTRICT HEATING – FUTURE DEVELOPMENT
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 36
MILANO DISTRICT HEATING – FUTURE DEVELOPMENT
HEAT PUMP PLANT
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 37
MILANO DISTRICT HEATING – FUTURE DEVELOPMENT
NOX EMISSION AVOIDED
ton
s/ye
ar
year
This information was prepared by A2A and it is not to be relied on by any 3rd party without A2A’s prior written consent. 38
MILANO DISTRICT HEATING – FUTURE DEVELOPMENT
CO2 EMISSION AVOIDED
ton
s/ye
ar
year