Upload
others
View
2
Download
0
Embed Size (px)
Citation preview
the experts for your integrated fire protection systems
innovative consultancies safety engineering
Fire Safety Engineering & Consultancy Services
Experience:INCOS Engineering personnel/engineers have worked for INMACO,
Semco Maritime and Norfass with the first operating since 2002
supplying Fire and Safety System to more than 70 FPSO’s / Offshore Oil
& Gas Facilities. Some references are; Woodside Laminaria - Northern
Endeavor – Okha - Vincent, ConocoPhillips Bayu-Undan, Marathon
Alvheim, Maersk Peregrino, Bluewater AkoaMizu, TeekayPetrojarl Siri
and FPSO (Knarr), PTTEP (TPOT) Montara, INPEX Icthys.
Key personnel engineers with individually more than 25 years-
experience and daily use of international standards including DNV,
ABS, Lloyds, GL, BV, AS, ATEX, IECEX, ASME, API, ANSI, BS, ISO, NMD,
NORSOK, NFPA, PED, SIL, SOLAS, UL, IMO etc.
Capabilities:
FEED / CONCEPTUAL ENGINEERING• Hazardous Area Evaluation, Fire Risk consideration, preparation of Fire Protection equipment / system specifications• Material and Corrosion Technology; advisory on suitable materials for Fire water Systems• Review of applicable environmental regulations/policies/guidelines and performance standards for foam concentrate selection
BASIC ENGINEERING• Preparation of Fire Protection Plot Plans, Piping and Instrument Diagrams• Design of deluge distribution piping• Preparation of technical proposals from analysis of specification and standards, evaluating options/alternatives, designing/sizing• Fluid mechanic calculations: Pressure, flow rate, head losses, pump duties, (using software Pipenet, Bernoulli’s principles, Darcy-Weisbach and
Hazen-Williams equations etc)• Nozzle/discharge equipment selection (coverage, throw/reach, foam expansion ratio)
DETAILED ENGINEERING• Design of deluge, sprinkler, foam nozzles layout drawings• Perform Hydraulic calculations and balancing of deluge piping distribution systems• Foam concentrate proportioning calculations and proportioner’s selection• Write System functional specifications
PRE-OPERATION• Installation and Commissioning Procedures• Generic Maintenance Strategies and Preventive Maintenance Programs• Equipment Operations Performance Standards and testing programs
OPERATION• Optimisation of Operators Programs for Inspection, Testing, and Maintenance• Performance Strategy and testing procedures • Site surveys and review of facilities fire water systems • Provide specialised expertise in the design, testing and commissioning for fire protection
systems (sprinklers, deluge, foam, hydrants, hose reels, gaseous systems etc)• Foam concentrate transition feasibility review• Life Extension Programs
DE-COMMISSIONING• Environmental Management of Fire fighting Foam Policy• Fire fighting foam and fire water waste inevitably contain components that class as regulated
wastes that require special handling, treatment and disposal
Base Scenario 2Geoman Consulting Pty
PIPENET Schematic Page 1 of 1Wednesday, January 29, 2020
FW-0
32
113
115
116
118
FW-020
120
121
FW-0
35
123
125
126
128
FW-023
130
131
132
133
134
135
FW-6
16
117
124
127
136
FW-617
138
139
FW-1994FW-1993FW-1992
FW-0
26
129
137
140
141
FW-014
143
144
145
146
147
148
FW-017
150
151
152
153
FW-0
29
155
156157
158
159
160
FW-016
162
163
164
165
FW-0
28
167
168
169
170
171
172
FW-718
175
FW-7
15
180
181
182
183
184
185
186
187
188
FW-0091 FW-0092 FW-0093
FW-1981 FW-1982
FW-00913FW-00911FW-00910FW-0095
FW-1983
FW-1985
FW-1985
FW-0094
FW-1984
FW-612
FW-6
13
177
178
FW-0096
174
FW-0099FW-0098FW-0097
190FW
-007
FW-005
FW-003
FW-001
195196
197 198
FW-171
FW-171
FW-171
FW-172
FW-172
FW-172
201
202
203 204 205 206
FW-0
0920
FW-00920 FW-00915FW-00919 FW-00914
FW-00914
FW-00914FW-00912
FW-00916
FW-1
991
FW-1991
FW-00918 FW-00917
FW-00921
1
2
4
5
6 7
8
9
10
11
12
13
14
15
16
17
18
19
3
60
61
222324
25
26
27
28
29
30
31
32
33 34 35 36
36
37 38
39
40
41
42
43
21
44
44
45
20
20
46
46
47
1
2
4 3 5
P-001-A
P-001-D
P-002-B
P-002-A
P-001-B
P-001-C
DXV-071
DXV-131
DXV-141
DXV-161
DXV
-162
DXV
-142
DXV
-132
DXV
-072
DXV-041
DXV-051
DXV-061
DXV
-042
DXV
-052
DXV
-062
DXV-111
DXV-121
DXV-151
DXV
-112
DXV
-122
DXV
-152
DXV-201
DXV-090
DXV-091
DXV
-202
DXV
-093
DXV
-092
DXV-211
DXV-221
DXV-231
DXV-021
DXV-011
DXV-081
DXV-101
DXV
-212
DXV
-222
DXV
-232
DXV
-022
DXV
-012
DXV
-082
DXV
-102
STAINER
STAINER STAINER STAINER
STAINER STAINER
STAINER
STAINER
STAINER
STAINER
STAINER
STAINER
STAINER
STAINER
STAINER
STAINER
schroeder valve schroeder valve
Water Spray Calculation for 792-DXV-0019 (LNG Train) Geoman Consulting Pty
PIPENET Schematic Page 1 of 1Wednesday, January 29, 2020
DELUGE VALVE791-DXV-0019
L-601-P-001
L-601-V-004
L-601-V-008
L-601-V-001
From Bypass Line
FW733 1GA1 10391
FW734 1GA1 100395
F808-1GA1 10606
F731- 1GA1 10682
FW732 1GA1 10688 FW732-1GA1 10684
FW785 1GA1 10060
FW785 1GA1 10425
FW733 1GA1/03 10394
Demand 7434 l/min @ 7.54barg using INPEX layout
INCOS use the globally recognised computer program “PIPENET” for hydraulic calculations.
Specifically intended for the design of fire protection systems. PIPENET Spray/Sprinkler complies with the NFPA13, NFPA15 and NFPA16 rules. The module is used for designing a wide range of fire protection systems i.e. sprinkler, deluge, ring-main, and foam solution.
The result of the hydraulic design process is a written report discussing the results from the computer calculations, a noded isometric drawing, and the actual printout of the hydraulic report. Our Engineers have experience in evaluating the results obtained from the calculation program, and will give recommendations needed to obtain the most balanced and efficient fire water distribution system.
Safety design is a process defined as the integration of hazard identification and risk assessment methods early in the design process to eliminate or minimise the risks of injury throughout the life of a structure being designed. Safe design is everybody’s business - from clients to designers to constructors.
Subject matter experts within Active Fire Protection Systems.
In summary we ensure the facts and details are correct so that
the project’s/program’s deliverables will meet the needs of the
stakeholders, legislation, policies, standards, and best practices.
FEED /ConceptualEngineering
BasicEngineering
DetailedEngineering Pre-Operation Operation De-
commisioning
Maintenance Engineering
PREVENTIVE MAINTENANCE
Planned and meticulous maintenance of facility assets,
equipment and infrastructure is the key component to
continuous and sustained operations in the field.
Incos Engineering Programmed Service & Maintenance
provides assurances to the customer that all is being
done to provide continuous uninterrupted operation by
maximising functional reliability and effectiveness of the
safety critical Firewater system.
SAFETY, SAFETY, SAFETY!
Potential hazards in the oil and gas industry are well-
documented. Accidents lead to safety incidents and loss of
production that can damage entire regions. Safety must be
an integral element in every facet of industry operation.
Common sense tells us that proper maintenance of oil
and gas processing facilities is key, in today’s tight energy
market, to ensure continuous, uninterrupted operation.
PLANT RELIABILITY
Ensuring minimal damage to the environment is caused as a result of oil and gas operations. Reliability and safety go hand-in-hand,
making sure that major incidents with the potential to affect the workforce and wider community occur as infrequently as possible.
Poor plant reliability also causes uncertainty among both investors and customers, ultimately impacting on the bottom line.
www.incos-e.com
+61 8 6252 [email protected] Ernest Clark RoadCanning Vale, Western Australia, 6155
ABN: 91 629 733 508 | Trading as: INCOS EngineeringOffshore Oil & Gas, Onshore Petrochemical Industries and Marine Support
the experts for your integrated fire protection systems