Library Expansion Projects The expansion plan for the library involves two separate projects: Project 1 is scheduled for 2017. We hope to undertake Project 2 in several years. Project 1 Description: The project for 2017 involves a 1,625 square foot addition to the existing library. The expansion will utilize an area of the west wing that is currently occupied by a rock and tree garden within the building’s existing foundation. Therefore, there will be no enlargement of the build- ing’s footprint. No parking spaces will be lost. No sidewalks or roads will be affected in any way. The section to be added will make use of the same brick column design found throughout the building and will blend seamlessly with the existing fa- cade. The expansion will include two small-group meeting rooms and a large flexible use room, tentatively named the Garden Lounge. Each small- group meeting room will seat five and include a large, wall-mounted flat-screen for presentations utilizing patrons’ laptop computers, and white board walls to allow maximum creativity for participants at the meeting. Even at maximum capacity (10), our existing parking is more than adequate for this use. The Garden Lounge will include comfortable seating, recharging stations for mobile devices, a vending area, and a fireplace. A clerestory above will bring in natural light. This space will also be available for the library to stage special events such as book discussions and occasional Friends Of The Library Meetings. Although small in square footage, this addition will bring us meeting, vending, and technology capabilities that our patrons have consistently requested but that we could not deliver. We hope to begin construction in May and complete construction in August. The bid notice will be published in the Daily Herald on Monday, January 16. The winning bidder will be chosen at the Tuesday, March 7 Library Board Meeting. The lead architect on this project is Carrie Matlock of DLA Archi- tects, Ltd., Itasca, Illinois. Project 2 Description: It will take us several years to build the funds needed to begin the second project. It involves a 1,075 square foot expansion of the receiving room area on the North side of the building. This addition will house the book stock for the Friends Of The Library semi-annual book sales and provide some space to sort and prepare the books for storage. This will essentially be a large garage area attached to the library’s existing receiving room. Building Size: The building is currently 43,000 square feet. The Project 1 expansion in the West Wing will add 1,625 square feet. The building will then total 44,625 square feet. Project 2 expansion in the Receiving Room will add another 1,075 square feet. This area will be for staff only. When this proj- ect is completed, the total size of the building will be 45,700 square feet. January 2017

The expansion plan for the library involves two separate ...€¦ · Project 2 Description: It will take us several years to build the funds needed to begin the second project. It

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: The expansion plan for the library involves two separate ...€¦ · Project 2 Description: It will take us several years to build the funds needed to begin the second project. It

Library Expansion Projects

The expansion plan for the library involves two separate projects: Project 1 is scheduled for 2017. We hope to undertake Project 2 in several years. Project 1 Description: The project for 2017 involves a 1,625 square foot addition to the existing library. The expansion will utilize an area of the west wing that is currently occupied by a rock and tree garden within the building’s existing foundation. Therefore, there will be no enlargement of the build-ing’s footprint. No parking spaces will be lost. No sidewalks or roads will be affected in any way.

The section to be added will make use of the same brick column design found throughout the building and will blend seamlessly with the existing fa-cade. The expansion will include two small-group meeting rooms and a large flexible use room, tentatively named the Garden Lounge. Each small-group meeting room will seat five and include a large, wall-mounted flat-screen for presentations utilizing patrons’ laptop computers, and white board walls to allow maximum creativity for participants at the meeting. Even at maximum capacity (10), our existing parking is more than adequate for this use. The Garden Lounge will include comfortable seating, recharging stations for mobile devices, a vending area, and a fireplace. A clerestory above will bring in natural light. This space will also be available for the library to stage special events such as book discussions and occasional Friends Of The Library Meetings. Although small in square footage, this addition will bring us meeting, vending, and technology capabilities that our patrons have consistently requested but that we could not deliver.

We hope to begin construction in May and complete construction in August. The bid notice will be published in the Daily Herald on Monday, January 16. The winning bidder will be chosen at the Tuesday, March 7 Library Board Meeting. The lead architect on this project is Carrie Matlock of DLA Archi-tects, Ltd., Itasca, Illinois.

Project 2 Description: It will take us several years to build the funds needed to begin the second project. It involves a 1,075 square foot expansion of the receiving room area on the North side of the building. This addition will house the book stock for the Friends Of The Library semi-annual book sales and provide some space to sort and prepare the books for storage. This will essentially be a large garage area attached to the library’s existing receiving room.

Building Size: The building is currently 43,000 square feet. The Project 1 expansion in the West Wing will add 1,625 square feet. The building will then total 44,625 square feet. Project 2 expansion in the Receiving Room will add another 1,075 square feet. This area will be for staff only. When this proj-ect is completed, the total size of the building will be 45,700 square feet.

January 2017

Page 2: The expansion plan for the library involves two separate ...€¦ · Project 2 Description: It will take us several years to build the funds needed to begin the second project. It

TM

LIBRARY RENOVATIONROLLING MEADOWS LIBRARY

16 DECEMBER 2016

Page 3: The expansion plan for the library involves two separate ...€¦ · Project 2 Description: It will take us several years to build the funds needed to begin the second project. It

TM© 1983-2016 DLA ARCHITECTS, LTD.

LIBRARY RENOVATIONROLLING MEADOWS LIBRARY16 DECEMBER 2016© 1983-2016 DLA ARCHITECTS, LTD.

LEGEND1. GARDEN LOUNGE2. RELOCATED MEDIA SPECIALIST STATION (BY OWNER)3. EXISTING TO REMAIN4. SMALL GROUP MEETING ROOMS5. RECEIVING / SORTING AREA6. CLERESTORY / SKYLIGHT ABOVE7. FIXED PERIMETER WORK COUNTERS/ CASEWORK AT ACCESSIBLE HEIGHT8. VENDING9. FIREPLACE10. COMPUTER STATIONS

0 8’ 16’ 32’NO

RTH

ENLARGED PLAN

EXISTINGNEW

EXIS

TING

NEW

1

2

3

10

6

7

9

5

4

8

6

Page 4: The expansion plan for the library involves two separate ...€¦ · Project 2 Description: It will take us several years to build the funds needed to begin the second project. It

TM© 1983-2016 DLA ARCHITECTS, LTD.

LIBRARY RENOVATIONROLLING MEADOWS LIBRARY16 DECEMBER 2016© 1983-2016 DLA ARCHITECTS, LTD.

EXTERIOR PERSPECTIVE 1

Page 5: The expansion plan for the library involves two separate ...€¦ · Project 2 Description: It will take us several years to build the funds needed to begin the second project. It

TM© 1983-2016 DLA ARCHITECTS, LTD.

LIBRARY RENOVATIONROLLING MEADOWS LIBRARY16 DECEMBER 2016© 1983-2016 DLA ARCHITECTS, LTD.

EXTERIOR PERSPECTIVE 2

Page 6: The expansion plan for the library involves two separate ...€¦ · Project 2 Description: It will take us several years to build the funds needed to begin the second project. It

TM© 1983-2016 DLA ARCHITECTS, LTD.

LIBRARY RENOVATIONROLLING MEADOWS LIBRARY16 DECEMBER 2016© 1983-2016 DLA ARCHITECTS, LTD.

INTERIOR PERSPECTIVE 1

Page 7: The expansion plan for the library involves two separate ...€¦ · Project 2 Description: It will take us several years to build the funds needed to begin the second project. It

TM© 1983-2016 DLA ARCHITECTS, LTD.

LIBRARY RENOVATIONROLLING MEADOWS LIBRARY16 DECEMBER 2016© 1983-2016 DLA ARCHITECTS, LTD.

INTERIOR PERSPECTIVE 2

Page 8: The expansion plan for the library involves two separate ...€¦ · Project 2 Description: It will take us several years to build the funds needed to begin the second project. It

TM© 1983-2016 DLA ARCHITECTS, LTD.

LIBRARY RENOVATIONROLLING MEADOWS LIBRARY16 DECEMBER 2016© 1983-2016 DLA ARCHITECTS, LTD.

INTERIOR PERSPECTIVE 3

Page 9: The expansion plan for the library involves two separate ...€¦ · Project 2 Description: It will take us several years to build the funds needed to begin the second project. It

TM© 1983-2016 DLA ARCHITECTS, LTD.

LIBRARY RENOVATIONROLLING MEADOWS LIBRARY16 DECEMBER 2016© 1983-2016 DLA ARCHITECTS, LTD.

INTERIOR PERSPECTIVE 4