Upload
anne-powers
View
215
Download
0
Tags:
Embed Size (px)
Citation preview
The European Organisation for the Safety of Air Navigation
EAD AIXM 5.1 Implementation
Razvan Guleac
DNM/COO/NOM/ADM
AIXM 5.1 Seminar
EAD AIXM 5.1 Implementation 2
PLANNING
EAD AIXM 5.1 Implementation 3
EAD Evolution
• One release every 12 Months• Client involvement during definition & assessment• Dedicated workshops depending on release content
• Extensions to a release• Necessity to react to the needs of the EAD clients • On dedicated topics • No impact on existing MyEAD/ESI API• Between release – every 6 months
• Patches• Maximum one per month• Bug fixing
EAD AIXM 5.1 Implementation 4
EAD Development Process
Web Tool – EAD CHM Tool
Extension
End of October/Beginning of November
Release
12 months6 m
Evolution TF membersSSG MembersDOP, ITPSubsystemsEtc.
EUROCONTROLICAOSES Etc.
Test TestAcceptance
End of April /Beginning of May
Release
Test TestAcceptance
OperationalOperational RegulatoryRegulatory
EAD AIXM 5.1 Implementation 5
EAD Change Management Tool
EAD AIXM 5.1 Implementation 6
EAD CHM – 814 – Route Package Download in AIXM 5.1
EAD AIXM 5.1 Implementation 7
Future Implementation Milestones
• AIXM 5.1
• Digital NOTAM
• ICAO 2012 Flight Plan
EAD AIXM 5.1 Implementation 8
AIXM 5.1 Implementation (1)
MAR 2011R6 R6E1 R7
NOV 2011 APR 2012
EADProduction
EADPre-Ops
AIXM 5.1
Analysis, Specifications,Development, Testing
6 months
Obstacles UploadDigital NOTAM Increment 1Min SDO
Download
AIXM 5.1decoupling
Min SDODownload
ObstaclesUpload / Download Digital
NOTAMIncrement 1
Min SDODownload
EAD AIXM 5.1 Implementation 9
AIXM 5.1 Implementation (post R7)
NOV 2012R7E1 R8 R8E1
MAY 2013 NOV 2013
ADQ Support:Upload – ADQ scope (AIP, Charting, eTOD)
Digital NOTAM upload & visualisation…
EAD AIXM 5.1 Implementation 10
SDO 5.1 Architecture
EAD AIXM 5.1 Implementation 11
System Architecture
AIP
CHP
INO-DP(current)
DigitalNOTAM
AIP I/F
CHP I/F
INO-DP I/F
Digital N. I/FAIXM 5.1 Download
AIXM 5.1 -> CACD
Mapping
CFMUCACD
AIXM 5.1 -> ARINC Mapping
AIXM 5.1 -> AIXM 4.5 Mapping
ARINCData User
AIXM 4.5Data User
AIXM 5.1Data User
AIMSL I/F
ESI I/F
HMI I/F
AIMSLWS
AIMSLWFS
AIXM 5.1DP - ESI
AIXM 4.5 -> AIXM 5.1 Mapping
AIXM 4.5DP - ESI
AIXM 5.1DP - HMI
SDDO
4.5
SDDO Business Logicand AIXM 5.1 Database
5.1INO-DU INO-DU I/F
CORE
AIXM 5.1 -> INSPIRE Mapping
INSPIREData User
AIMSLWMS
EAD AIXM 5.1 Implementation 12
Data Maintenance Principles• Data maintenance is done only in the appropriate system. This
means that AIXM 4.5 data is handled in SDO (4.5) while AIXM 5.1 data is handled in SDO (5.1). This includes the HMI as well as uploads via ESI and IFS.
• The synchronisation is done via dedicated system interfaces between SDO (4.5) and SDO (5.1); backwards download (5.1 -> 4.5) shall be limited, e.g. ad-hoc SNAPSHOT
• Minor updates in the SDO (4.5) system to enable data model compatibility: new business rules, new DHOs
• It is not possible to have mixed slots, the slot-handling for 4.5 slots is done in SDO (4.5) while the equivalent handling for the 5.1 slots is done in SDO (5.1). Slot-operations are therefore only possible in the system where the slot has been created originally.
• The mapping shall be robust enough not to lead to any error in the counterpart system (mapping & business rules).
EAD AIXM 5.1 Implementation 13
AIXM 5.1 Business Rules
EAD AIXM 5.1 Implementation 14
EAD AIXM 5.1 Business Rules
• Based on the AIXM 5.1 Business Rules
• Will be transposed into EAD AIXM 5.1 Business Rules
• Using SBVR - Semantics of Business Vocabulary and Business Rules
• Will be developed progressively with the implementation of the upload packages (i.e. starting with Release 7 – May 2012)
• Will contain both Static Data rules and Digital NOTAM Event Specification Rules
EAD AIXM 5.1 Implementation 15
EAD AIXM 5.1 Implementation 16