The European FloodForecasting system

HEPEX Workshop, 08-10 March 2004

Page 2: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

The EFFS: the facts

• Project EFFS was sponsored by the 5th Framework Programme of the European Commission.

• Duration 01/03/2000 – 31/09/2003 (42 months).• EC financial contribution: 1.8 M€ over 3,5 years.• 11 institues + 8 NAS institutes= 19 partners in

total.

Page 3: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

EFFS Project Objectives

• EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to 10 days ahead.

• The main emphasis is on the medium-range lead time, i.e 4 to 10 days.

• The prototype is designed at providing pre-warningto local water and flood forecasting authorities across Europe.

• The system should permit encapsulation of pre-existing hydrological and river routing models already tested and used by local authorities.

Page 4: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

EFFS “Mother” Consortium

• Original Consortium: 11 institutes• 3 Weather services (DWD, DMI, ECMWF)• 3 Universities (Lancaster, Bristol, Bologna)• 2 Research Centres (Delft Hydraulics, JRC)• 2 National Hydro-meteorological Services (SHMI, BAFG)• 1 National Water Management Authority (RIZA)

Page 5: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

EFFS “Mother” Consortium

Univ LancasterUniv. BristolECMWF

WL|Delft,RIZA

SMHI

JRC IspraUniv. Bologna

DWDDMI

GRDC/BFG

Page 6: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

EFFS NAS-1 amendment

• In June 2002 an EFFS amendment is approved to include 8 additional institutes from the Newly Associated States (NAS) in view of the enlargement of the EU.

• Amendment financed with ~ 4 k€ over 1 year• New opportunities: Data from river systems in

Eastern Europe are made available for sharing within the consortium.

• Results of hydrological and river routing models can be compared.

Page 7: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

EFFS NAS-1 Partners

SHMU-SKSlovak UT-SK

Vituki Plc

NIMH-RO

GGI-LT

NIMH-BG

IMWM-PL

Uni Ljubljana-SI

Page 8: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

EFFS Project Organigramm

WP 4: Building a geographical DB

UNI Bristol

WP 3 Hydrological data collection

GRDC

WP 10 Dissemination of forecasts & warnings

SHMI

WP 6 Downscaling and validating meteorological forecasts

DMI

WP 5 Parameter and forecast uncertainty estimation

Lancaster

WP 7 Development of the European-scale FF system

JRC

WP 8 Application, validation &comparison of watershed models

Uni Bologna

WP 9 Set-up & testing of prototype system

RIZA

WP 1 Co-ordinator & interface with EC

WL-Delft Hydraulics

WP 2 Meteorological data collection & supply

DWD

Page 9: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

EFFS structure

Hydrological ModelsSoil, land-use,model parameters

P,T,….

River routers

Weather forecastup to 10 days ahead

1. Global model2. HIRLAM3. EPS4. HIRLAM Mini-EPS

conversion from GRIB toNEFIS format

1. Sobek

2. Muskingam-Cunge

1. Overtopping?

2. Defence structurecollapse?

Inundation modelling

save in DB

save in DB

Operational testing

Warning

meteo and hydro data from hydrological networks

EFFS open-architecture platform

postprocessing

save in DB

Page 10: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

Numerical Weather forecasts

• ECMWF supplies medium range meteorological data from their deterministic model and from their Ensemble Prediction System (EPS).

• DWD and DMI supply deterministic high resolution short range forecasts from their High Resolution Local Area Model (HIRLAM).

• HIRLAM is initialised through Global ECMWF model output

• The high-resolutions forecasts make it possible to estimate the impact of horizontal resolution of the atmospheric predictions on water level forecasts.

• In addition, DMI is experimenting with mini ensembles with the aim to investigate uncertainties in the precipitation forecasts.

Page 11: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

High Resolution Local AreaModel nested domains

Courtesy Danish Meteorological Institute

Page 12: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

Precipitation hindcast

Courtesy Deutscher Wetterdienst

Page 13: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

Hydrological measuring networksin flood forecasting

• The operation of a river basin-scale flood forecasting system, and in particular of a continental-scale system, as EFFS, requires regular update through measured data.

• Which data are required?

1. Precipitation 2. Temperature 3. Synoptic weather data4. Discharge data at critical locations5. Water level data at critical locations

Page 14: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

Measuremement network for the RhineBasin

DWD meteorological stations

Stream flow gauges

Page 15: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

Data acquisition in EFFS•The following scheme shows the data-stream from measuring networks to the EFFS is performed.

•The data acquisition was led by the GRDC in Work-Package 3.

Courtesy GRDC

Page 16: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

Utilisation of measured data in the flood forecasting system

• The regularly update measurement form the hydrological networks are used for the following purpose:

• In now-casting (extremely short lead-time, max 24 hrs) directly measured precipitation data form gauges and radar are used to drive models.

• in EFFS (mdium-range lead-time) hydrological and hydraulic models are updated (data assimilation) through data measured over the 2 weeks precedent the begin of the forecast.

Hattingen / Ruhr -1993 flood event • The data are transferred from the

loggers over FTP into the data-base of the flood forecasting system.

Page 17: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

Hydrological modelling

• Different hydrological models are used within the EFFS system:

1. HBV (SHMI) semi-distributed model the entire Rhine Basin (calibrated at the BFG, Koblenz) representing the Rhine Basin up to Switzerland through 134 sub-basins.

2. LISFLOOD (JRC) raster-based model for simulation of continental river basins at 5 sqkm resolution. Used in particular for Rhine, Odra, Danube.

3. TopKapi (Uni Bologna) for simulation of the Po river basin

N.B.: The system is however conceived as “open “ allowing any other model to be incorporated through an appropriate model-adapter.

Page 18: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

LISFLOOD model

Courtesy Joint Research Centre

Page 19: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

River routing

• Lateral inflows into the main river system are calculated by thehydrological model (e.g. HBV).

• The water is subsequently routed along the main river system (e.g. Rhine).

• Within the EFFS river routing is performed with the WL | Delft Hydraulics Saint-Venant model SOBEK.

• Discharge Q and water level height H at critical sections are calculated.

• Effects of engineering structures such as weirs, locks and bridges are included in the schematisation.

Page 20: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

River routing

Lippe [814.50]

Emscher [797.80]

Wisper [540.30]

Nette [608.70]

Saynbach [599.90]Wied [610.20]

Ruhr [780.10]

Wupper [703.30]Erft [736.55]

Sieg [659.4]

Ahr [629.45]

Selz[518.80] Modau [473.70]

Weschnitz [454.70]

Speyerbach [400.20] Queich [384.80]

Pfinz [380.70]Alb [371.20]

Nahe[529.10]

Lobith [862.2]

Wesel [814.0]

Ruhrort [780.8]

Düsseldorf [744.2]

Cologne [688.0]

Bonn [654.8]

Andernach [613.8] Moselle [592.3]

Lahn [585.7]

Kaub [546.2]

Nahe [529.1]

Mainz [498.3]

Main[496.6]

Worms [443.4]

Neckar [428.2]

Maxau [362.3]

Rees [837.4]

Sobek modelMoselle [592.3]

1

2

3

4

5 6

7

8

9 10

12

11

16

15

14

13

17

8

7

4

1

Neckar [428.2]

Main [496.6]Lippe [814.50]

Emscher [797.80]

Ruhr [780.10]

Wupper [703.30]Erft [736.55]

Sieg [659.4]

Ahr [629.45]

Lobith [862.2]

Wesel [814.0]

Ruhrort [780.8]

Düsseldorf [744.2]

Cologne [688.0]

Bonn [654.8]

Andernach [613.8]

Rees [837.4]

12

11

16

15

14

13

17

48 hourforecastWSD

Model A

Model B

Page 21: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

Floodplain inundation modelling

• Once water overtops a dyke and invades lowlands (e.g. polders), 2-D flood-wave propagation modelling is needed to forecast the extent of the inundation.

• Inundation modelling within EFFS can be performed by two different models:

1. The 2D inundation of the University of Bristol and JRC (LISFLOOD-FP.

2. The Delft 2D inundation model.

Page 22: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

Inundation Modeling River Severn (UK)Raw LiDAR data(6 x 3 km domain)

Topography map

Vegetation height map

Inundation modelling results

Courtesy University of Bristol

Page 23: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

Uncertainty

• Flood forecasting cannot be separated form the problem of the uncertainty inherent to the input, model structure and parameter values.

• Any flood forecasting system is made up by a cascade of models, usually :

• Each model contains parameters which lie within a range, i.e. their exact value is not known.

• In addition the inputs (e.g. rainfall) as well as the initial conditions are affected by uncertainty.

• Subsequently the predictions lead to a bandwidth of forecasted values, which may over- or underestimate the actual water levels.

Meteo Hydrology Routing Inundation

Page 24: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

Model integration: prototype FEWS

• The modeling steps needed in a flood forecasting system are integrated through an integration platform (shell-tool).

• The shell-tool is designed as open and re-usable software system.

• The system is adaptable to different hydrological and hydraulic models through model-adapters.

• The platform is linked to a data-base system.• Results of various model runs are saved and retrieved

subsequently from the DB.• Within the shell-tool model runs, analysis of results and

postprocessing are facilitated.

Page 25: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

The Open-Architecture Platform

Page 26: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

Testing of the prototype

• The EFFS is being tested within the frame of the project in a semi-operational fashion by the Dutch institute RIZA on the river Rhine.

• Several hundreds of forecasts have been carried out though direct access to DWD weather forecast data and subsequent running of the model cascades.

• The predicted water levels are compared directly with the ones measured at the German-Dutch border flow measuring station.

• Results of these test-runs will be presented later on in the conference.

Page 27: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

Flood Warning & dissemination

• Once a high water is forecast by the system, decision need to be made if evacuation is necessary.

• False alarms can be as damaging as not issuing a warning at the right moment.

• Decisions stay ultimately with the forecaster and need use of historical records for verification and uncertainty reduction.

• A systematic approach to address this issue is matter of ongoing research.

Page 28: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

Summary

• The outlined system components will be addressed by the project partners through dedicated sessions during this conference.

• Results and applications of various project applications will be presented.

• Systematic quantification and handling of the inherent uncertainties on forecast results are a complex issue which needs particular attention from a research point of view.

Page 29: The European Flood Forecasting system - ECMWF · EFFS Project Objectives • EFFS aims at developing a prototype of a flood forecasting system for the European countries for up to

• Keith Beven• Paul Bates• Erdmann Heise• Tony Hollingsworth• Bo Holst • Michael Hils

• Jaap Kwadijk• Ad de Roo • Kai Sattler • Eric Sprokkereef • Ezio Todini

The conference organisation would like to wish you a pleasant stay and is looking forward to fruitful discussion!

Thank you very much for your attention.

ContributionsTo this presentation have contributed the following people :