The DESIR facility at SPIRAL2. SPIRAL2 at GANIL SPIRAL2 Phase 1 and Phase 2 New equipment at SPIRAL2 DESIR facility DESIR physics programme. Bertram Blank CEN Bordeaux-Gradignan. Arctic FIDIPRO-EFES Workshop , Saariselkä, Finland April 20-24, 2009. Existing GANIL facility. - PowerPoint PPT Presentation
Citation preview
Arctic FIDIPRO-EFES Workshop, Saariselkä, Finland April 20-24, 2009
• SPIRAL2 at GANIL
• SPIRAL2 Phase 1 and Phase 2
• New equipment at SPIRAL2
• DESIR facility
• DESIR physics programme
Bertram BlankCEN Bordeaux-Gradignan
Spins&Shapes
Position ofdrip-linesPosition ofdrip-lines
N=ZN=Z
rp-processrp-process
Heavy and Super Heavy Elements
Heavy and Super Heavy Elements
r-process pathr-process path
Haloes & Structures in the Continuum
Haloes & Structures in the Continuum
Equation of StateRole of Isospin
Equation of StateRole of Isospin
Spins & ShapesSpins & Shapes
Shell structure far from stabilityShell structure
far from stability
Neutrons for scienceAtomic & solid state physicsRadiobiology & Isotope production
Neutrons for scienceAtomic & solid state physicsRadiobiology & Isotope production
ISOSPIN DEGREES OF FREEDOM IN NUCLEAR FORCES
ISOSPIN DEGREES OF FREEDOM IN NUCLEAR FORCES
www.ganil.fr/research/developments/spiral2/
Particle ArrayParticle ArrayGamma ArrayGamma Array
AGATA
PARISGASPARD FAZIA
EXOGAM 2
ACTAR
NFS
S3DESIR
2006-2007: 19 Letters of Intent, 600 physicists from 34 countries2008-2009: TDR for big instrumentation at SPIRAL2
DESIR
Low-energy beams from:S1, S2, S3
S3Productionbuilding
SPIRAL2 (S2)
GANIL – SPIRAL1 (S1)
Désintégration, excitation et stockage d’ions radioactifs(Decay, excitation and storage of radioactive ions)
Projectile or targetfragmentation at95 MeV/A
main interest:very neutron- and proton-rich light nuclei1+ n+
C
Source
UCx2000°C
diffusion / effusiondeuterons40 MeV neutrons
1+ n+
C
Source
UCx2000°C
diffusion / effusiondeuterons40 MeV neutrons
1+ n+
Fission, fusionevaporation, DIC
main interest:- fission products- medium-mass proton-rich nuclei
UCx2H
IS
UCx ISHI
n
2HTarget
2HIS
n
Target IS
Converter
LISOL
Gas catcher
Fusion-evaporationreactions at CoulombBarrier, DIC
main interest:- very heavy nuclei- N=Z nuclei- very short-lived isotopes- refractory elements
Optical studies for double HRS are under way: aim is m/m = 20000 for 2mm mrad
to DESIR
Identification station
to CIME
RFQ-HRS
Teresa Kurtukian Nieto, CENBG
0 20 40 60 80-300
-250
-200
-150
-100
-50
0
50
Deriva
ted in
tensi
ty
V4 (V)
40 41 42 43 44 45 46 47 48 49 50 51 52-300
-250
-200
-150
-100
-50
0
50
Der
ivat
ed in
tens
ity
V4 (V)
0 20 40 60 80-20
0
20
40
60
80
100
120
140
Nor
mal
ized
inte
nsity
(%
)
V4 (V)
• Gas : Helium at 10-2 mbar
• ΔE ≈ 0.18eV (before re-acceleration)
-8 -6 -4 -2 0 2 4 6 8
-6
-4
-2
0
2
4
Div
erg
ence
(m
rad)
Position (mm)
0
248,8
497,5
746,3
995,0
1244
1493
1741
1990
-8 -6 -4 -2 0 2 4 6 8
-6
-4
-2
0
2
4
Div
erge
nce
(mra
d)
Position (mm)
0
1008
2015
3023
4030
5038
6045
7053
8060
Without gas : 12 π.mm.mrad Helium at 10-2mbar : 4.75 π.mm.mrad
• 4.75 π.mm.mrad @ 3keV → ≈ 1 π.mm.mrad @ 60keV • Still under investigation :
– RF heating – Residual gas effect outside the RFQ section– Charge-exchange process
Laserroom
(mezzanine)
Meetingroom
(on top of DAQ)
Kitchen
+ WC(on top of CR)
MLL trap
Collinea
r Las
er
spec
trosc
opy
-NM
R
RFQbun-cher
+
Decay
set
up
Paultrap
General
purpose
SAS
ElectronicsDeskAccess5 m
Beam fromLevel -1
TAS
Neutronditch
Crane access to basement
Double M
OT
Gener
al
purpose
IS
Identification station with
tape
LN2
Gas &
w
aste sto
rage
LUMIERE BESTIOL
DA
Qro
om
Co
ntro
lro
om
off-linesource2
off-linesource1
Supply
Electri-city
Gray Room 2
Gray Room 1
AssemblyRoom 3
ControlRacks
Interfaces
HV
supplies
Crane access to basement
Stor- age 1
Assembly Room 2
Assembly Room 1
Stor- age 2
Radiolab
5 m
storage
Limits of DESIR hall
free
Bea
m f
rom
P
rod
uct
ion
bu
ild
ing
, S
3 an
d S
PIR
AL
1
Workshop
X
Identificationand radioprotectionmeasurements
Neutronditch
• RFQ SHIRAC: Gilles Ban• HRS: Bertram Blank• DESIR building: Franck Delalee• General purpose ion buncher GPIB + stable ion sources: Pierre Delahaye• Identification station: Philippe Dessagne
• Beam transport lines: Francois Le Blanc
• Safety and security: Jean-Charles Thomas
• Command / Control, diagnostics: Stéphane Grévy
• submitted on December 19, 2008
• presented to SPIRAL2 SAC on January 29, 2009
• strongly supported by SPIRAL2 SAC….
• about 100 pages of technical description of DESIR facility
and its equipment
• co-signed by 111 physicists and engineers of 15 countries
• contains a general description of buildings and interfaces
• description of major installations like traps, spectroscopy
setups etc
• report available on DESIR web page (www.cenbg.in2p3.fr/desir)
• Collinear Laser spectroscopy: - spins - magnetic moments - quadrupole moments - change of charge radii
• -NMR spectroscopy: - nuclear gyromagnetic factor - quadrupole moment
N=50, N=64, N=82, …
• Microwave double resonance in a Paul trap: - hyperfine anomaly and higher order momenta (octupole and hexadecapole deformation)
Eu, Cs, Au, Rn, Fr, Ra, Am ….
LUMIERELUMIERELLaser aser Utilisation for tilisation for MMeasurement andeasurement and
IIonization of onization of EExotic xotic RRadioactive adioactive EElementslements
F. Le Blanc ,OrsayF. Le Blanc ,OrsayG. Neyens, LeuvenG. Neyens, LeuvenP. Campbell, ManchesterP. Campbell, Manchester
• Decay studies with halo nuclei
• Clustering studies in light nuclei
• -delayed charged-particle emission: e.g. proton-proton correlation
• Super-allowed decays and the standard model of electro-weak interaction
• Deformation and Gamow-Teller distribution
• 2n correlations, Pn and nuclear structure (r-process)
• ...
BESTIOLBESTIOLBEBEta decay STSTudies at the SPIRAL2 IIsOLOL facility
TETRA, Y. Penionzhkevich (Dubna)TAS, J.L. Tain (Valencia) setup, B. Blank (Bordeaux)
M.J.G. Borge, MadridM.J.G. Borge, Madrid
MLLTRAPMLLTRAP
• High-accuracy mass measurements - unitarity of CKM matrix (Vud): 50Mn, 54Co with M/M~10-10
- transuranium isotopes (beams from S3): M(Z>102) • In-trap spectroscopy: - conversion electron and spectroscopy: shape coexistence • Trap-assisted spectroscopy - decay studies of isomerically pure radioactive species
P. Thirolf , MunichP. Thirolf , Munich
Set-up being installed at
MLL/Garching
KVI atomic trapping facilityKVI atomic trapping facility
• New limits on scalar and tensor contributions in the weak interaction
• New limits on time-reversal violation in beta decay
• Systematic of atomic parity non-conservation in a long isotopic chain
H. Wilschut, GroningenH. Wilschut, Groningen
Experimental set-up at KVI
DESIR: 29 weeks of RIB/year: 10 weeks of RIB from SPIRAL2, 4 weeks from S3, 15 weeks from SPIRAL1 DESIR: 29 weeks of RIB/year: 10 weeks of RIB from SPIRAL2, 4 weeks from S3, 15 weeks from SPIRAL1
Standard planning; one production caveStandard planning; one production cave
Main parts: estimated costs fund available
• RFQ and HRS « building »: included in SPIRAL2 project
• DESIR building + interfaces: 6000 k€ 2000 k€ (CPER)
• RFQ: 450 k€ + ? 320 k€ (CPER)
• HRS: 2000 k€ + ? -
• beam lines: 4500 k€ -
• off-line sources + GPIB: 290 k€ -
• identification station: 140 k€ -
• control / command, diagnostics: 400 k€ together with SPIRAL2
• RFQ: on-going tests, study of “nuclearisation”, study of final version of RFQ
• HRS: detailed optical study of new ALPHA version, detailed mechanical study
• beam lines: preliminary design, cost estimate, detailed design study
• stable ion sources: definition, purchase
• GPIB: study and construction
• Identification station: preliminary design, detailed design, construction
• DESIR building: like SPIRAL2 Phase 2 construction program….
decision about construction at latest mid 2010
• ……