As of 2004, nuclear power provided 6.5% of the world's energy and 15.7% of the world's electricity, with the U.S., France, and Japan together accounting for 57% of all nuclear generated electricity. As of 2007, the IAEA reported there are 439 nuclear power reactors in operation in the world, operating in 31 different countries.

Page 3: The Current Status And Future Of Nuclear Power C
Page 4: The Current Status And Future Of Nuclear Power C

Status of Commercial Nuclear Power in the USA

Page 5: The Current Status And Future Of Nuclear Power C

The Current USA Reactor Fleet is dominated by two reactor types •Pressurized Water Reactors (PWR)•Boiling Water Reactors (BWR)

Page 6: The Current Status And Future Of Nuclear Power C
Page 7: The Current Status And Future Of Nuclear Power C
Page 8: The Current Status And Future Of Nuclear Power C
Page 9: The Current Status And Future Of Nuclear Power C
Page 10: The Current Status And Future Of Nuclear Power C

Other Reactor Types in the World

PHW Candu: Pressurized Heavy Water Candu

BLW Candu: Boiling Light Water Candu

BHWR: Boiling Heavy Water Reactor

SGHWR: Steam Generating Heavy Water Reactor

PHWR: Pressure Vessel Heavy Water Reactor

LWCHWR: Light Water Cooled Heavy Water Reactor

GCR: Gas Cooled Reactor

MAGNOX: Magnox Type Gas Cooled Reactor

AGR: Advanced Gas Cooled Reactor

HTGR: High Temperature Gas Cooled Reactor

FBR: Fast Breeder Reactor

LWBR: Light Water Breeder Reactor

GCHWR: Gas Cooled Heavy Water Reactor

LWGR: Light Water Cooled Graphite Reactor

Page 11: The Current Status And Future Of Nuclear Power C

Annual Energy Outlook 2007 with Projections to 2030

Page 12: The Current Status And Future Of Nuclear Power C

Annual Electric Sales

Total electricity sales increase by 41 percent from 3,660 billion kilowatt-hours in 2005 to 5,168 billion kilowatt-hours in 2030.

The largest increase is in the commercial sector (Figure 53), as service industries continue to drive growth.

Electricity sales, which are strongly affected by the rate of economic growth, are projected to grow by 54 percent to 5,654 billion kilowatt-hours in 2030.

Page 13: The Current Status And Future Of Nuclear Power C
Page 14: The Current Status And Future Of Nuclear Power C
Page 15: The Current Status And Future Of Nuclear Power C
Page 16: The Current Status And Future Of Nuclear Power C

Public Opinion

Feb 2005 opinion poll regarding nuclear power in the USA.

Blue represents people in favor of nuclear power.Gray represents undecided.Yellow represents opposed to nuclear power

Page 17: The Current Status And Future Of Nuclear Power C

0.0

2.0

4.0

6.0

8.0

10.0

1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006

Coal - 2.37Gas - 6.75Nuclear - 1.72Petroleum - 9.63

2006

U.S. Electricity Production Costs

1995-2006, In 2006 cents per kilowatt-hour

Production Costs = Operations and Maintenance Costs + Fuel Costs

Source: Global Energy DecisionsUpdated: 6/07

Page 18: The Current Status And Future Of Nuclear Power C

Factors positively influencing the prospects of constructing new nuclear power plants: Presented in

Speech by Chair of NRC in 2008Support by the President and

the Congress for expanding the use of nuclear power, including incentives for the first six plants

 Concerns with the Nation’s

energy security

High cost of oil and natural gas

Environmental considerations

Low and stable electrical production costs from nuclear

Low interest rates and inflation

Renewed interest by utilities in building new nuclear power plants

NRC’s establishment of an improved licensing process

Page 19: The Current Status And Future Of Nuclear Power C

Factors Negatively influencing the prospects of constructing new nuclear power plants:

Presented in Speech by Chair of NRC in 2008

High capital cost of new nuclear power plants

Financing considerations

New licensing processes have not yet been fully tested

Page 20: The Current Status And Future Of Nuclear Power C

New infrastructure needed for new nuclear power plants: Presented in Speech by Chair of NRC

Improved reactor design and construction

Reliable suppliers

Well-qualified personnel

Page 21: The Current Status And Future Of Nuclear Power C
Page 22: The Current Status And Future Of Nuclear Power C

Roadmap to Commercial Operation

Page 23: The Current Status And Future Of Nuclear Power C

Click to See Movie on New Licensing Process

Page 24: The Current Status And Future Of Nuclear Power C

Proposed New Reactors in the USA

Page 25: The Current Status And Future Of Nuclear Power C
Page 26: The Current Status And Future Of Nuclear Power C
Page 27: The Current Status And Future Of Nuclear Power C
Page 28: The Current Status And Future Of Nuclear Power C

Advanced Reactors Scheduled for Review by NRC

Evolutionary Power Reactor (EPR)

Simplified Boiling Water Reactor (ESBWR)

Westinghouse AP1000 Advanced Passive Plant

US-APWR is a 4451 MWt pressurized water reactor designed by Mitsubishi Heavy Industries, Ltd.

Page 29: The Current Status And Future Of Nuclear Power C

• The review process for new reactor designs involves the certification of standard reactor designs by rulemaking (Subpart B of Part 52).

• Design certification applicants must provide the technical information necessary to demonstrate compliance with the safety standards set forth in applicable NRC regulations (10 CFR Parts 20, 50, 73, and 100).

• Applicants must also provide information to close out unresolved and generic safety issues, as well as issues that arose after the Three Mile Island accident.

Page 30: The Current Status And Future Of Nuclear Power C

Currently there are four certified reactor designs that can be referenced in an application for a combined license. They are:

• Advanced Boiling Water Reactor design by GE Nuclear Energy (May 1997);

• System 80+ design by Westinghouse (formerly ABB-Combustion Engineering) (May 1997);

• AP600 design by Westinghouse (December 1999); and

• AP1000 design (pictured) by Westinghouse (February 2006).

Page 31: The Current Status And Future Of Nuclear Power C

Advanced ReactorsABWR developed by

General Electric Co (GE), USA, together with Hitachi & Toshiba Japan

APWR developed by Westinghouse (W), USA, together with Mitsubishi, Japan

BWR 90 developed by ABB Atom, Sweden

AP1000 Westinghouse

EPR developed by Nuclear Power International (NPI), a joint company of Framatome, France and Siemens, Germany

System 80+ developed by ABB Combustion Engineering Nuclear Power, USA

VVER-1000 (V-392) developed by Atomenergo project and Gidropress, Russia

Page 32: The Current Status And Future Of Nuclear Power C

Advanced Boiling Water Reactor

ABWR: The U.S. Advanced Boiling Water Reactor design uses a single-cycle, forced circulation, reactor with a rated power of 1,300 megawatts electric (MWe).

The design incorporates features of the BWR designs in Europe, Japan, and the United States, and uses improved electronics, computer, turbine, and fuel technology.

The design is expected to increase plant availability, operating capacity, safety, and reliability.

Page 33: The Current Status And Future Of Nuclear Power C

•AP1000: This is a larger version of the previously approved AP600 design.

•It is a 1,000 MWe advanced pressurized water reactor that incorporates passive safety systems and simplified system designs.

•It is similar to the AP600 design but uses a longer reactor vessel to accommodate longer fuel, and also includes larger steam generators and a larger pressurizer.

Page 34: The Current Status And Future Of Nuclear Power C
Page 35: The Current Status And Future Of Nuclear Power C
Page 36: The Current Status And Future Of Nuclear Power C

ABB Combustion Engineering System 80+

The System 80+ is a 1300 MWe advanced pressurized water reactor.

Like previous ABB-CE reactors, the System 80+ reactor coolant system has a two loop configuration, a major feature that has distinguished CE designed units.

Like other ALWRs, improved safety performance and operability

are achieved, owing to sophisticated design features.

Another interesting feature of System 80+ is that it can run with Plutonium fuel, which could be a very useful mean to dispose the Weapon Graded Plutonium from dismantled nuclear warheads

Page 37: The Current Status And Future Of Nuclear Power C

United States Advanced PWRThe US-APWR is a 4451 MWt pressurized water reactor designed

by Mitsubishi Heavy Industries, Ltd.

It is an evolutionary design with active safety features. The US-APWR is based on established APWR technology.

Mitsubishi Heavy Industries, Ltd formally announced its intent to pursue a Design Certification on June 20, 2006 and formally requested a pre-application review of the U.S. APWR on August 31, 2006.

Page 38: The Current Status And Future Of Nuclear Power C

•EPR: The EPR is a large pressurized water reactor of evolutionary design, with design output of approximately 1,600 MWe.

•Design features include four 100% capacity trains of engineered safety features, a double-walled containment, and a “core catcher” for containment and cooling of core materials for severe accidents resulting in reactor vessel failure.

•The design does not rely on passive safety features. The first EPR is currently being constructed at the Olkiluoto site in Finland.

Page 39: The Current Status And Future Of Nuclear Power C

UniStar Nuclear will market a standard advanced design called the U.S. Evolutionary Power Reactor (U.S. EPR), a 1,600-megawatt evolutionary power reactor designed for America by AREVA Inc.

Page 40: The Current Status And Future Of Nuclear Power C

•Economic Simplified Boiling Water Reactor (ESBWR)

•General Electric requested pre-application review of its design in a letter to the NRC dated April 18, 2002.

•General Electric submitted its design certification application for the ESBWR on August 24, 2005.

•The staff accepted the application for review in a letter dated December 1, 2005, and expects the certification process to continue through 2010.

Page 41: The Current Status And Future Of Nuclear Power C

Nuclear Plant Design Expectations

3-6 Nuclear Plant Applications this year

15-30 Nuclear Plant Applications in 2010

Significant Shortages of Nuclear Design Engineers

Significant Shortages of Analyst to Perform Calculations for Licensing Evaluations.

Significant Shortage of Review Engineers