ENGINEERING FOR PHARMAThe core business of the Company

Page 2: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:
Page 3: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

ABOUT US

Our experience in the pharmaceutical sector gives to VALUE ENGINEERING S.R.L. importantadded values such as:

• Respect of high standards in safety for layout developing• Study of materials and staff flow• Check of compliance with cGMP and FDA requirements (utilities & facilities)

We work with a quality system conformed with ISO 9001:2015 and we apply it in all our process

3

CONSULTING&

PLANNING

DESIGN&

ENGINEERING

PROJECTMANAGEMENT

COMMISSIONING&

START UP

E n g i n e e r i n g P r o c u r e m e n t C o n s t r u c t i o n M a n a g e m e n t

Page 4: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

4

MAIN PHARMA SERVICES

Engineering

Management

Commissioning & Start Up

ENG

PM

COM

• CONSULTING

• Feasibility studies & project budgeting

• User’s Requirements specifications

• Defining production layouts

• Site master planning

• cGMPs Consulting (utilities & facilities)

• Energy audit & management

• DESIGN

• Concept design

• Basic design

• Detailed design (layout – facilities – b&c utilities – HVAC – moreover)

Page 5: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

5

MAIN PHARMA SERVICES

Engineering

Management

ENG

PM

• Project Management

• Construction Management

• Health & Safety coordination

• Work management & supervision

• Procurement assistance

• Site assistant

• Time & Cost control

Commissioning & Start UpCOM

Page 6: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

6

MAIN PHARMA SERVICES

Engineering

Management

ENG

PM

• Start Up

• Commissioning

• Maintenance plans

Commissioning & Start UpCOM

General services:

• MEP engineering

• Fire engineering

• Acoustic consulting

• Procurement assistance

• Permitting

• PED (Pressure Equipment Directive)

Page 7: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

ACTIVE POWDER DEPARTMENT

7

PHARMA

STERILE DEPARTMENT

Job:New active powder department

Activities Design Work supervision

General info:2003-2005Ascoli (IT)ENG (PIERREL) *Activity done as consultant of other Engineering Company

Job:New Manufacturing Department for sterileproducts

Activities Design Construction management

General info:2006-2007Firenze (IT)ENG (GSK) *Activity done as consultant of other Engineering Company

Page 8: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

HVAC SYSTEM

Job:New Hvac plant for Packaging PharmaDepartment

Activities Design Work supervision

General info:2006-2007Firenze (IT)MECHANICAL CONTRACTOR (ELI LILLY ITALIA)

8

PHARMA

Job:New complete carpule department FDAApproved

Activities Design Construction management

General info:2007-2013Caserta (IT)ENG (PIERREL) *Activity done as consultant of other Engineering Company

NEW CARPULE DEPARTMENT

Page 9: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

9

PHARMA

PW LOOP REVAMPING

Job:PW loop complete revamping

Activities Design Construction management

General info:2010-2011Firenze (IT)ENG (ABBOTT) *Activity done as consultant of other Engineering Company

WAREHOUSE REVAMPING

Job:Pharma Warehouse revamping includingautomated Cold Room

Activities Design Construction management

General info:2011-2012Firenze (IT)ENG (ELI LILLY) *Activity done as consultant of other Engineering Company

Page 10: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

10

PHARMA

NEW MANUFACTURING DEPARTMENT

Job:New Manufacturing Department for medicaldevice

Activities Design Construction management

General info:2012-2014Torino (IT)TECNOSS

HEATING SYSTEM REVAMPING

Job:Heating plant revamping of Pharma Warehouse

Activities Design Work supervision

General info:2013Firenze (IT)ELI LILLY ITALIA

Page 11: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

11

COLD ROOM

Job:Cold room consultancy

Activities Design Construction management

General info:2013Siena (IT)NOVARTIS

PHARMA

PW PRODUCTION REVAMPING

Job:Revamping of PW production system anddistribution loop of Pharma Plant

Activities Design Construction management

General info:2013Firenze (IT)MENARINI GROUP

Page 12: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

12

PHARMA

CORRIDORS REVAMPING

Job:Pharma corridors revamping

Activities Design Construction management

General info:2013-2014Firenze (IT)ELI LILLY ITALIA

DETAIL DESIGN FOR HVAC PLANT

Job:MEP design for new bio department

Activities: Design

General info:2014 Teheran (IRAN)ENG (BIOSUN) *Activity done as consultant of other Engineering Company

Page 13: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

WAREHOUSE LAYOUT VARIATION BASIC DESIGN OF NEW FACILITIES

Job:Possible layout variation on main warehouse

Activities Design

General info:2014Firenze (IT)MENARINI GROUP

Job:Basic design of new facilities

Activities Design

General info:2015Cartoceto (IT)DIATHEVA

13

PHARMA

Page 14: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

BIOLOGICAL LABORATORY PACKAGING DEPARTMENT

Job:Biological laboratory revamping

Activities Design Construction management

General info:2016Firenze (IT)ELI LILLY ITALIA

Job:Packaging department revamping

Activities Design Construction management

General info:2016Firenze (IT)MENARINI GROUP

14

PHARMA

Page 15: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

DETAIL DESIGN FOR HVAC PLANT

Job:Detail design for HVAC plant dedicated to newpharma facilities

Activities: Design

General info:2016 Teheran (IRAN)ENG (BIOSUN) *Activity done as consultant of other Engineering Company

15

PHARMA

PW PRODUCTION & DISTRIBUTION

Job:Detail design for PW production anddistribution system

Activities: Design Construction management

General info:2016 Firenze (IT)MENARINI GROUP

Page 16: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

16

PHARMA

PHARMA LABORATORY

Job:New pharma laboratory in biological area(MEP and civil works)

Activities: Design Construction management

General info:2016-2017Firenze (FI)ELI LILLY ITALIA

PW PRODUCTION

Job:Detail design for PW production system

Activities: Design Construction management

General info:2017Firenze (FI)MENARINI GROUP

Page 17: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

17

PHARMA

NEW CHEMICAL LABORATORY

Job:New building for chemical laboratory(mechanical and electrical plants)

Activities: Design Work supervision

General info:2016-2018Firenze (IT)BIOCHEMIE

VACCINES PLANT

Job:New HVAC plants for vaccines production

Activities: Design Construction management

General info:2017-2018Siena (IT)PHARMA CONTRACTOR

Page 18: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

18

NEW R&D LABORATORY

Job:New R&D laboratory

Activities: Design Construction management

General info:2018Catania (IT)ELI LILLY ITALIA

PHARMA

PW PRETREATMENT & DISTRIBUTION

Job:PW pretreatment and distribution forpharmaceutical utilities

Activities: Design Construction management

General info:2018Firenze (IT)ELI LILLY ITALIA

Page 19: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

19

NEW LABORATORIES

Job:New Chemical and Microbiologicallaboratories

Activities: Design

General info:2018-2019Firenze (IT)ISTITUTO CHIMICO FARMACEUTICO MILITARE

PHARMA

NEW PHARMA GREENHOUSES

Job:New greenhouses for herbal drugs cultivation

Activities: Design

General info:2018Firenze (IT)ISTITUTO CHIMICO FARMACEUTICO MILITARE

Page 20: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

20

MANUFACTORING RELAYOUT

Job:Manufactoring layout change

Activities: Design Construction management

General info:2019-on goingFirenze (IT)ELI LILLY ITALIA

PHARMA

NEW FACILITIES SXB

Job:New Facilities for new Compounding Area

Activities: Design

General info:2019-on goingModena (IT)BIOFER

Page 21: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

21

PHARMA

LABORATORY SUITE

Job:New mechanical plants for Laboratory Suite

Activities: Design

General info:2019-on goingAprilia (IT)PHARMA CONTRACTOR

Page 22: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:
Page 23: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:
Page 24: The core business of the Companyfiles.spazioweb.it/e3/b7/e3b71900-53f1-4911-bec2-b1ad23...ELI LILLY ITALIA DETAIL DESIGN FOR HVAC PLANT Job: MEP design for new bio department Activities:

VALUE ENGINEERING S.R.L.

VIA VITTORIO BARBIERI,18/2050141 FLORENCE

ITALYPHONE - FAX

+39 055 4480902@-MAIL

[email protected]

www.ve-global.com

VALUE ENGINEERING S.R.L. IS CONFORMED TO THE"ISO 9001:2015 QUALITY MANAGEMENT SYSTEMS“

CERTIFICATE No. 392063 LL-C Certification