4
The Components of the Water Task (Linkages and Performance Indicators)

The Components of the Water Task (Linkages and Performance Indicators)

Embed Size (px)

Citation preview

Page 1: The Components of the Water Task (Linkages and Performance Indicators)

The Components of the Water Task(Linkages and Performance Indicators)

Page 2: The Components of the Water Task (Linkages and Performance Indicators)

By 2015, produce comprehensive sets of data and information products to supportdecision-making for efficient management of the world's water resources, based on

coordinated, sustained observations of the water cycle on multiple scales.

C5 Information System Development and Capacity Building

C4 Global Water Quality

Products and Services

C3 Information Service

for Cold Regions

C2 Information Systems for Hydro-meteorological

Extremes

C1 Integrated Water-cycle Products and Services

Component Interactions for WA-01 in the 2012-2015 GEO Work Plan.

Page 3: The Components of the Water Task (Linkages and Performance Indicators)

Soil Moisture

Runoff andSurface Water

Evapo-transpiration

Precipitation Water CycleIntegrator

Great LakesData System

End to EndIndicators

C2 Information Systems for Hydro-meteorological

Extremes

C5 Information System Development and Capacity Building

By 2015, produce comprehensive sets of data and information products to support decision-making for efficient management of the world's water resources, based on

coordinated, sustained observations of the water cycle on multiple scales.

Soil MoistureAnomaly maps

Soil MoistureData archive

SMOSSMAPproducts

Analysis andData access tools

National AssessmentIndicators

Data setsFor Asia andAfrica

Network of Experts

RevisedGPCP data sets

Regional Pand SM data

Component #1

Basin wide Transbound-ary data sets/metadata

National water indicators

Runoff data for the GCI

Groundwater

Regional ET maps*

StreamflowAnomaly maps

PrecipitationAnomaly maps

Page 4: The Components of the Water Task (Linkages and Performance Indicators)

J 2012

D 2012

J 2013

D2013

J2014

D2014

J2015

D2015

P: GPCP D AP, AM P D D O OSM, AM P P D D I I OSF, AM P P D D I OSM, DA D D D I I A ASMAP P P P P D D A ASMOS D D D A A A O ORgnl ET P P D D A A OWCI P P P D D O OGL RDS D D D A A A/O A/O A/ON ind D D D D A A O ONet EX P D D D D O O O

P- Planned, D – Developing, I – Implemented, A- Available, O- Operational

Component #1: Deliverables and Milestones