Proposed Amendment
• Support for an Amendment (10) to the CALWMP – very similar to Amendment 7 (i.e., tertiary in WestShore built at same time as main plant
• This is not a final decision, simply approval in principle that allows Colwood to fully explore this approach
Next Steps if approved in principle…
Detailed study and design• Environmental Impact
Studies• Groundwater studies • Colwood pays all costs• Develop best financial
model • Ministry of Environment
prepared to approve Operating Certificate
Amendment Process• Grant agreement secured• Public consultation
throughout Core area• CRD Board approval to
request amendment from Ministry of Environment
• Colwood pays all costs• Approved amendment from
Ministry of Environment
Colwood Facility Benefits
• Tertiary disinfected
• Short term – treated water to ground
• Longer term – water reuse for irrigation, toilet flushing, ground and creek enhancement
• Heat recovery to local buildings
• Biosolids dried, used as fuel
Financial Implications
• No change to design of main plant – adds 4-5 years capacity for other core municipalities
• Modest short term cost to other municipalities – about $16 per household per year, BUT
• avoided future cost of about $250 per year for WestShore plant
• Colwood is not seeking to have its ‘share’ of the federal/provincial grants
• Colwood will leave $ already contributed
Sewage Treatment Financial Timeline
20132015
20172019
20212023
20252027
20292031
20332035
20372039
20412043
20452047
20492051
20532055
20572059
0
100
200
300
400
500
600
700
Annual taxes on typical res-idence for capital cost un-der current LWMP
Annual taxes on typical res-idence in rest of Core Area if Colwood pays for West-Shore Plant
Current LWMP: Tax ramps up in2029 to 2035 for Westshore Plant
Current LWMP: Total tax reaches $600/yr
Current LWMP: Total tax drops to$245/yr andcontinues till 2059
Colwood proposal - to-tal tax stays at $350/yr
Colwood proposal – Total tax drops to zero
Colwood proposal -$16 more/yr
Current LWMP
Colwood Proposal