The City of New York
Capital Commitment PlanFiscal Year 2013
Volume 2January 2013
Michael R. Bloomberg, Mayor Office of Management and BudgetMark Page, Director
January 2013 Capital Commitment Plan Agency Index
Department No. Department Name Volume Page 125 Aging, Department for the (AG) .......................................................................................... 1 1
801 Business Services, Department of Economic Development, Office of (ED) ................................................................ 1 116
068 Children’s Services, Administration for (CS)....................................................................... 1 70 042 City University of New York (HN) ...................................................................................... 2 477 856 Citywide Administrative Services, Department of Courts (CO) ............................................................................................................ 1 49 Equipment and Miscellaneous (PU) ....................................................................... 2 1029 Public Buildings (PW) ........................................................................................... 3 1356 Real Property (RE) ................................................................................................. 3 1497 072 Correction, Department of (C) .............................................................................................. 1 27 126 Cultural Affairs, Department of (PV) ................................................................................... 3 1062 858 Department of Information Technology & Telecommunications (DP) ................................ 1 88 040 Education, Department of (E) ............................................................................................... 1 100 826 Environmental Protection, Department of Equipment (EP) ...................................................................................................... 1 168 Sewers (SE) ............................................................................................................ 3 1523 Water Mains, Sources and Treatment (WM) ......................................................... 3 1641 Water Pollution Control (WP) ................................................................................ 3 1702 Water Supply (W) .................................................................................................. 3 1633 057 Fire Department (F) .............................................................................................................. 1 181 816 Health, Department of (HL) ................................................................................................. 2 404 819 Health and Hospitals Corporation (HO) ............................................................................... 2 519
January 2013 Capital Commitment Plan Agency Index
Department No. Department Name Volume Page 071 Homeless Services, Department of (HH) ............................................................................. 1 392 806 Housing Preservation and Development Housing Authority (HA) ........................................................................................ 1 213 Housing Preservation and Development (HD) ....................................................... 1 296 096 Human Resources Administration (HR) ............................................................................... 2 544 130 Juvenile Justice, Department of (JJ) ..................................................................................... 2 665 Libraries 035 New York Research (L) ......................................................................................... 2 667 038 Brooklyn Public (LB) ............................................................................................. 2 674 037 New York Public (LN) ........................................................................................... 2 685 039 Queens Borough Public (LQ) ................................................................................. 2 718 846 Parks and Recreation, Department of (P) ............................................................................. 2 735 056 Police Department (PO) ....................................................................................................... 2 997 827 Sanitation, Department of (S) ............................................................................................... 3 1500 998 Transit Authority MTA Bus Company (MT)………………………………………………………... 2 733 Staten Island Rapid Transit (ST) ............................................................................ 3 1590 Transit Authority (T) .............................................................................................. 3 1592 841 Transportation, Department of Bridges, Highway (HB) ......................................................................................... 1 234 Bridges, Waterway (BR) ........................................................................................ 1 20 Equipment (TD) ..................................................................................................... 3 1600 Ferries and Aviation (FA) ...................................................................................... 1 203 Highways (HW) ..................................................................................................... 2 559 Traffic (TF) ............................................................................................................ 3 1604
VIII..
2013-2016AppropriationsandCommitmentswith2013PlanandForecast,andActualsthroughNovember,IncludingDetailedProjectStatusInformations,byBudgetLine
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 404WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN014 FMS #: 816 A00 ALBERT EINSTEIN COLLEGE OF MEDICINEAVAILABLE BALANCE AS OF: 11/30/12 $2,550,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $1,901.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $2,035,099.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 2,550 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 2,550 * 2,550FORCST(C)* * * * * * * * * * * * 2,550 * 2,550ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
801 HL82ALB Albert Einstein College of MedicineCONS 002 CONSTRUCTION 1,000 0 06/13
801 HL99AECOM AECOM-DIABETES MOBILE TESTING UNIT & EQUIPMENTEQFN 003 EQUIPMENT AND FURNITURE 1,000 0 06/13
816 HL99ALEIN ALBERT EINSTEIN COLLEGE OF MEDICINEEQFN 002 EQUIPMENT AND FURNITURE 500 0 06/13EQFN 004 EQUIPMENT AND FURNITURE 50 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 405WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN023 FMS #: 816 A02 AMERICAN RED CROSS IN GREATER NEW YORKAVAILABLE BALANCE AS OF: 11/30/12 $154,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 154 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 154 * 154FORCST(C)* * * * * * * * * * * * 154 * 154ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HL99AMRC AMERICAN RED CROSS IN GREATER NEW YORK - COMMUNICATION EQUIPEQFN 002 EQUIPMENT AND FURNITURE 154 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN024 FMS #: 816 A03 AMERICAN-ITALIAN CANCER FOUNDATIONAVAILABLE BALANCE AS OF: 11/30/12 $1,992.91 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $198,007.09 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 2 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 2 * 2FORCST(C)* * * * * * * * * * * * 2 * 2ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
816 HL98IVAN AMERICAN ITALIAN CANCER MOBILE MAMMOGRAPHY VANCO#: 00 EQVH 005 EQUIPMENT - VEHICLES 2 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 406WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN036 FMS #: 816 A05 ASSOCIATION FOR THE ADVANCEMENT OF THE BLIND AND RETARDEDAVAILABLE BALANCE AS OF: 11/30/12 $200,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 200 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 200 * 200FORCST(C)* * * * * * * * * * * * 200 * 200ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HL99AABRT ASSOC. FOR THE ADVANCEMENT OF THE BLIND & RETARDEDEQFN 001 EQUIPMENT AND FURNITURE 200 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN045 FMS #: 816 A07 BEDFORD STUYVESANT FAMILY HEALTH CENTER INCAVAILABLE BALANCE AS OF: 11/30/12 $2,002,539.24 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $165,271.96 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $1,832,188.80 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 2,003 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 2,003 * 2,003FORCST(C)* * * * * * * * * * * * 2,003 * 2,003ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
801 HLBSFHC BEDFORD STUYVESANT FAMILY HEALTH CENTEREQFN 003 EQUIPMENT AND FURNITURE 2,000 0 06/13
801 HL99BEDFC FA - Construction of Bed-Stuy Family Health Center DSGN 12/04 12/05CONS 010 CONSTRUCTION 3 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 407WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN049 FMS #: 816 A08 NYU SCHOOL OF MEDICINEAVAILABLE BALANCE AS OF: 11/30/12 $683,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 483 * * * * (C)* 683 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 683 * 683FORCST(C)* * * * * * * * * * * * 683 * 683ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HLDNNYUCH NYU SCHOOL OF MEDICINE - DNA SEQUENCERS FOR MS RESEARCHEQFN 001 EQUIPMENT AND FURNITURE 483 0 06/13
850 HL99NYUS2 BELLEVUE - NYU SCHOOL OF MEDICINEEQFN 001 EQUIPMENT AND FURNITURE 200 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN050 FMS #: 816 A09 BETH ISRAEL MEDICALCENTER- KINGS HIGHWAY DIVISIONAVAILABLE BALANCE AS OF: 11/30/12 $937,030.18 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $1,603,430.82 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 897 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * 41-* * * * * * * 938 * 897FORCST(C)* * * * * 41-* * * * * * * 938 * 897ACTUAL(C)* * * * * 41-* * * * * * * * 41-
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
816 HL98BETH BETH ISRAEL KINGS HWY HOSPITAL EQFNCO#: 00 EQFN 006 EQUIPMENT AND FURNITURE 41- 0 11/12CO#: 01 EQFN 006 EQUIPMENT AND FURNITURE 41 0 06/13
EQFN 007 EQUIPMENT AND FURNITURE 250 0 06/13EQFN 008 EQUIPMENT AND FURNITURE 250 0 06/13EQFN 009 EQUIPMENT AND FURNITURE 397 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 408WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN084 FMS #: 816 A13 CALLEN-LORDE COMMUNITY HEALTH CENTERAVAILABLE BALANCE AS OF: 11/30/12 $338,101.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $1,414,206.98 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $1,039,814.12 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 1,782 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 1,782 * 1,782FORCST(C)* * * * * * * * * * * * 1,782 * 1,782ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HL82CLORD CALLEN LORDE HEALTH CENTER - VARIOUS EQUIPMENT PROJSTRT 07/08 07/08CONS 008 CONSTRUCTION 765 0 06/13
CO#: R3 CONS 008 CONSTRUCTION 23 0 06/13CO#: 01 CONS 008 CONSTRUCTION 994 0 06/13CO#: 03 IFSP 012 IFA CONSTRUCTION SUPERVIS 500 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN107 FMS #: 816 A16 COBBLE HILL HEALTH CENTERAVAILABLE BALANCE AS OF: 11/30/12 $1,500,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 1,493 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * 263 * * * * * 1,230 * 1,493FORCST(C)* * * * * * * 263 * * * * * 1,230 * 1,493ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HL99CHHC COBBLE HILL HEALTH CENTER - RENOVATE RESIDENTIAL SENIOR HEALCONS 001 CONSTRUCTION 480 0 06/13EQFN 002 EQUIPMENT AND FURNITURE 263 0 01/13CONS 003 CONSTRUCTION 750 0 06/13IFSP 010 IFA CONSTRUCTION SUPERVIS 7 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 409WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN108 FMS #: 816 A17 COLUMBIA UNIVERSITY MEDICAL CENTERAVAILABLE BALANCE AS OF: 11/30/12 $561,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $250,000.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 396 * * * * (C)* 561 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 561 * 561FORCST(C)* * * * * * * * * * * * 561 * 561ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
801 HL99CUMC COLUMBIA UNIVERSITY Pediatric Dental ClinicCONS 002 CONSTRUCTION 501 0 06/13
850 HLDNCUPDC COLUMBIA UNIVERSITY Pediatric Dental ClinicEQFN 001 EQUIPMENT AND FURNITURE 60 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN133 FMS #: 816 A18 DR. BETTY SHABAZZ HEALTH CENTERAVAILABLE BALANCE AS OF: 11/30/12 $1,042,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $40,000.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 1,042 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 1,042 * 1,042FORCST(C)* * * * * * * * * * * * 1,042 * 1,042ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HL99CHN COMMUNITY HEALTHCARE NETWORK DR. BETTY SHABAZZ HLTH CTR RENV PROJSTRT 02/07 02/07CONS 004 CONSTRUCTION 1,042 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 410WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN135 FMS #: 816 A20 EAST HARLEM HEALTH CENTERAVAILABLE BALANCE AS OF: 11/30/12 $75,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 75 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 75 * 75FORCST(C)* * * * * * * * * * * * 75 * 75ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
816 HL82HRAMP SECURITY SYSTEMS FOR DOHMH HEALTH CENTERS IN HARLEMCONS 004 CONSTRUCTION 75 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN136 FMS #: 816 A84 EPISCOPAL HEALTH SERVICES INC.AVAILABLE BALANCE AS OF: 11/30/12 $1,612,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 1,612 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 1,612 * 1,612FORCST(C)* * * * * * * * * * * * 1,612 * 1,612ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HL82SJONE Saint John Episcopal - EquipmentEQFN 003 EQUIPMENT AND FURNITURE 1,612 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 411WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN140 FMS #: 816 AA1 EDEN II SCHOOL FOR AUTISTIC CHILDREN, INC.AVAILABLE BALANCE AS OF: 11/30/12 $730,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 730 * * * * (C)* 730 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 730 * 730FORCST(C)* * * * * * * * * * * * 730 * 730ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
801 HLEDEN2 FA - Eden II School for Autistic Children 132872916-L4868CONS SJ 002 CONSTRUCTION SITE DEV. AND OFFSITE INF 730 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN146 FMS #: 816 A85 NEW ALTERNATIVES FOR CHILDREN (NAC) INC.AVAILABLE BALANCE AS OF: 11/30/12 $46,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 46 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 46 * 46FORCST(C)* * * * * * * * * * * * 46 * 46ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HL82NACH NEW ALTERNATIVES FOR CHILDRENCONS 001 CONSTRUCTION 46 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 412WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN156 FMS #: 816 A23 FLATLANDS VOLUNTEER AMBULANCEAVAILABLE BALANCE AS OF: 11/30/12 $7,088.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $117,912.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 7 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 7 * 7FORCST(C)* * * * * * * * * * * * 7 * 7ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
816 HL99FLATL FLATLANDS VOLUNTEER AMBULANCEEQVH 003 EQUIPMENT - VEHICLES 7 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN163 FMS #: 816 A88 SINERGIAAVAILABLE BALANCE AS OF: 11/30/12 $175,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 175 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 175 * 175FORCST(C)* * * * * * * * * * * * 175 * 175ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HL82SINER SINERGIA- INITIAL OUTFITTINGEQFN 001 EQUIPMENT AND FURNITURE 175 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 413WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN164 FMS #: 816 A89 WILLIAM F. RYAN COMMUNITY HEALTH CENTERAVAILABLE BALANCE AS OF: 11/30/12 $380,020.66 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $481,979.34 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 84 * * * * (C)* 374 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * 6-* * * * * * * 380 * 374FORCST(C)* * * * * 6-* * * * * * * 380 * 374ACTUAL(C)* * * * * 6-* * * * * * * * 6-
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
816 HL82WFRY WILLIAM RYAN COMMUNITY HEALTH CENTER - INITIAL OUTFITTINGCO#: 00 EQFN 001 EQUIPMENT AND FURNITURE 12 0 06/13CO#: 01 EQFN 001 EQUIPMENT AND FURNITURE 6- 0 11/12CO#: 02 EQFN 001 EQUIPMENT AND FURNITURE 6 0 06/13
EQFN 002 EQUIPMENT AND FURNITURE 196 0 06/13
850 HLDNWILLM WILLIAM F. RYAN COMMUNITY HEALTH CENTER - VEHICLE PURCHASEEQVH 001 EQUIPMENT - VEHICLES 84 0 06/13
850 HLWFRCHC William F. Ryan Community Health CtrEQFN 001 EQUIPMENT AND FURNITURE 82 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 414WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN189 FMS #: 816 A25 HOSPITAL FOR SPECIAL SURGERYAVAILABLE BALANCE AS OF: 11/30/12 $4,215,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 4,215 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 4,215 * 4,215FORCST(C)* * * * * * * * * * * * 4,215 * 4,215ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
816 HL82HSS1 EQFN FOR THE HOSPITAL OF SPECIAL SURGERY - CC$$EQFN 002 EQUIPMENT AND FURNITURE 310 0 06/13
850 HLHSS HOSPITAL FOR SPECIAL SURGERY - X-ray systemsEQFN 001 EQUIPMENT AND FURNITURE 629 0 06/13
850 HL82HSS2 HOSPITAL FOR SPECIAL SURGERYEQFN 001 EQUIPMENT AND FURNITURE 533 0 06/13EQFN 002 EQUIPMENT AND FURNITURE 613 0 06/13
850 HL98HSS HOSPITAL FOR SPECIAL SURGERY -EQUIPMENTEQFN 002 EQUIPMENT AND FURNITURE 2,130 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 415WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN192 FMS #: 816 A26 INTERFAITH MEDICAL CENTERAVAILABLE BALANCE AS OF: 11/30/12 $500,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 500 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 500 * 500FORCST(C)* * * * * * * * * * * * 500 * 500ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HL99IFMC INTERFAITH MEDICAL CENTEREQFN 001 EQUIPMENT AND FURNITURE 250 0 06/13EQFN 003 EQUIPMENT AND FURNITURE 250 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN201 FMS #: 816 A91 NEW YORK BLOOD CENTERAVAILABLE BALANCE AS OF: 11/30/12 $801,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 801 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 801 * 801FORCST(C)* * * * * * * * * * * * 801 * 801ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HLNYBC New York Blood Center -Vans and blood drive equipmentEQFN 001 EQUIPMENT AND FURNITURE 515 0 06/13
850 HL82NYBC NEW YORK BLOOD CENTER- MOBILE MUSEUMEQVH 002 EQUIPMENT - VEHICLES 286 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 416WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN202 FMS #: 816 A27 JAMAICA HOSPITAL MEDICAL CENTERAVAILABLE BALANCE AS OF: 11/30/12 $1,667,798.50 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $41,201.50 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 1,667 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * 1-* * * * * * * 1,668 * 1,667FORCST(C)* * * * * 1-* * * * * * * 1,668 * 1,667ACTUAL(C)* * * * * 1-* * * * * * * * 1-
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
816 HL99JHMC JAMAICA HOSPITAL MEDICAL CENTEREQFN 005 EQUIPMENT AND FURNITURE 1,667 0 06/13
CO#: 01 EQFN 005 EQUIPMENT AND FURNITURE 1- 0 11/12CO#: 02 EQFN 005 EQUIPMENT AND FURNITURE 1 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN228 FMS #: 816 A28 KINGSBROOK JEWISH MEDICAL CENTERAVAILABLE BALANCE AS OF: 11/30/12 $6,465,021.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $2,970,979.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 754 * * * * (C)* 6,463 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * 2-* * * * * * * 6,465 * 6,463FORCST(C)* * * * * 2-* * * * * * * 6,465 * 6,463ACTUAL(C)* * * * * 2-* * * * * * * * 2-
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
816 HL98KJMC KINGSBROOK JEWISH MED CTR -CAT SCANNEREQFN 002 EQUIPMENT AND FURNITURE 1,850 0 06/13
CO#: 00 EQFN 004 EQUIPMENT AND FURNITURE 2- 0 11/12CO#: 01 EQFN 004 EQUIPMENT AND FURNITURE 2 0 06/13
EQFN 005 EQUIPMENT AND FURNITURE 27 0 06/13
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 417WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HL82KJMED KINGSBROOK JEWISH MEDICAL CENTEREQFN 001 EQUIPMENT AND FURNITURE 1,700 0 06/13EQFN 002 EQUIPMENT AND FURNITURE 1,691 0 06/13
850 HL82KNJSW KINGSBROOK JEWISH MEDICAL CENTER: SURGICAL TABLEEQFN 002 EQUIPMENT AND FURNITURE 1,195 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN244 FMS #: 816 A30 LONG ISLAND COLLEGE HOSPITALAVAILABLE BALANCE AS OF: 11/30/12 $400,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 400 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 400 * 400FORCST(C)* * * * * * * * * * * * 400 * 400ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HL82LICH2 LICH - RADIOLOGY & RADIATION EQUIPMENTEQFN 001 EQUIPMENT AND FURNITURE 400 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 418WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN252 FMS #: 816 A31 LUTHERAN MEDICAL CENTERAVAILABLE BALANCE AS OF: 11/30/12 $6,824,604.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $981,396.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 6,825 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 6,825 * 6,825FORCST(C)* * * * * * * * * * * * 6,825 * 6,825ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
816 HL82LUTHR LUTHERAN MEDICAL CENTER - PATIENT MGMT SYSTEM - CC$$EQFN 005 EQUIPMENT AND FURNITURE 1,757 0 06/13
850 HLLUTHR LUTHERAN MEDICAL CENTEREQFN 001 EQUIPMENT AND FURNITURE 1,400 0 06/13
850 HL82HLLMC Lutheran Medical CenterCONS 001 CONSTRUCTION 1,668 0 06/13CONS 002 CONSTRUCTION 2,000 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 419WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN254 FMS #: 816 A32 MAIMONIDES MEDICAL CENTERAVAILABLE BALANCE AS OF: 11/30/12 $8,961,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $2,650,000.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 1,810 * * * * (C)* 8,961 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 8,961 * 8,961FORCST(C)* * * * * * * * * * * * 8,961 * 8,961ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HLKNMAIMO MAIMONIDES MEDICAL CENTER - MRI PURCHASEEQFN 002 EQUIPMENT AND FURNITURE 1,810 0 06/13
850 HL82MAIMC MAIMONIDES MEDICAL CENTEREQFN 001 EQUIPMENT AND FURNITURE 1,800 0 06/13EQFN 002 EQUIPMENT AND FURNITURE 1,001 0 06/13EQFN 004 EQUIPMENT AND FURNITURE 500 0 06/13EQFN 005 EQUIPMENT AND FURNITURE 1,200 0 06/13EQFN 008 EQUIPMENT AND FURNITURE 1,800 0 06/13
850 HL82MIDES MAIMONIDES MEDICAL CENTER: PURCHASE 2 AMBULANCESEQFN 002 EQUIPMENT AND FURNITURE 850 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 420WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN269 FMS #: 816 A34 MORRIS HEIGHTS HEALTH CENTERAVAILABLE BALANCE AS OF: 11/30/12 $2,113,994.21 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $8,650,000.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $507,005.79 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 2,114 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 2,114 * 2,114FORCST(C)* * * * * * * * * * * * 2,114 * 2,114ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
801 HL82MORR Morris Heights Health CenterCONS 001 CONSTRUCTION 2,071 0 06/13
801 HL82MORRH FA - Morris Heights Health Facility DSGN 01/04 01/05CONS 008 CONSTRUCTION 43 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN271 FMS #: 816 A35 MOUNT SINAI ADOLESCENT HEALTH CENTERAVAILABLE BALANCE AS OF: 11/30/12 $1,735,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 50 * * * * (C)* 1,735 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 1,735 * 1,735FORCST(C)* * * * * * * * * * * * 1,735 * 1,735ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HLSINAIAV Mount Sinai Hospital A-V & Technology SystemsEQFN 001 EQUIPMENT AND FURNITURE 50 0 06/13
850 HL82SINAM MOUNT SINAI HOSPITAL - RENOVATIONCONS 001 CONSTRUCTION 1,475 0 06/13
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 421WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HL82SINDC MOUNT SINAI ADOLESCENT HEALTH CENTEREQFN 001 EQUIPMENT AND FURNITURE 210 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN273 FMS #: 816 A36 MOUNT SINAI HOSPITAL OF QUEENSAVAILABLE BALANCE AS OF: 11/30/12 $5,598,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 2,600 * * * * (C)* 5,574 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 5,574 * 5,574FORCST(C)* * * * * * * * * * * * 5,574 * 5,574ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HLDNMOUNT MOUNT SINAI QUEENS - HOSPITAL EQUIPMENTEQFN 001 EQUIPMENT AND FURNITURE 2,600 0 06/13
850 HLMTSIN MOUNT SINAI HOSPITAL,QUEENS CAMPUSEQFN 001 EQUIPMENT AND FURNITURE 253 0 06/13
850 HL82SINCC MOUNT SINAI HOSPITAL, QUEENS NEW CANCER CENTEREQFN 001 EQUIPMENT AND FURNITURE 1,800 0 06/13
CO#: RG EQFN 001 EQUIPMENT AND FURNITURE 921 0 06/13IFSP 005 IFA CONSTRUCTION SUPERVIS 24 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 422WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN283 FMS #: 816 A37 NARAL PRO-CHOICE NEW YORK FOUNDATIONAVAILABLE BALANCE AS OF: 11/30/12 $60,340.55 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $270,659.45 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 60 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 60 * 60FORCST(C)* * * * * * * * * * * * 60 * 60ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
816 HL99NARAL NARAL PRO-CHOICE NY FOUNDATION - INITIAL OUTFITTINGEQFN 004 EQUIPMENT AND FURNITURE 60 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN295 FMS #: 816 A38 NEW YORK ACADEMY OF MEDICINEAVAILABLE BALANCE AS OF: 11/30/12 $522,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $208,084.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $5,034,125.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 512 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 512 * 512FORCST(C)* * * * * * * * * * * * 512 * 512ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
801 HL82MED NY Academy of MedicineCONS WW 001 CONSTRUCTION WINDOWS 512 0 06/13
850 HL82NYAM3 New York Academy of Medicine- BoilerIFSP 005 IFA CONSTRUCTION SUPERVIS 10 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 423WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN305 FMS #: 816 A42 NEW YORK HOSPITAL QUEENSAVAILABLE BALANCE AS OF: 11/30/12 $1,454,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 634 * * * * (C)* 1,954 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 1,954 * 1,954FORCST(C)* * * * * * * * * * * * 1,954 * 1,954ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HLDNHOSPT THE NEW YORK HOSPITAL MEDICAL CENTER OF QUEENSEQFN 001 EQUIPMENT AND FURNITURE 634 0 06/13
850 HL82NYHCQ NEW YORK HOSPITAL MEDICAL CENTER OF QUEENSEQFN 002 EQUIPMENT AND FURNITURE 820 0 06/13
850 HL99NYHQ NEW YORK HOSPITAL QUEENSEQFN 001 EQUIPMENT AND FURNITURE 500 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 424WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN308 FMS #: 816 A43 NEW YORK UNIVERSITY COLLEGE OF DENTISTRYAVAILABLE BALANCE AS OF: 11/30/12 $1,285,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $300,000.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 1,285 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 1,285 * 1,285FORCST(C)* * * * * * * * * * * * 1,285 * 1,285ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
816 HL98NYUD NYU COLLEGE OF DENTISTRY -DENTAL CLINIC EQEQFN 008 EQUIPMENT AND FURNITURE 750 0 06/13
850 HLNYUD NEW YORK UNIVERSITY COLLEGE OF DENTISITRYEQFN 001 EQUIPMENT AND FURNITURE 535 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN316 FMS #: 816 A45 NEW YORK FAMILIES FOR AUTISTIC CHILDRENAVAILABLE BALANCE AS OF: 11/30/12 $100,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $273,634.57 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $2,126,365.43 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 1,275 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* 1,175 * * * * * * * * * * * 100 * 1,275FORCST(C)* 1,175 * * * * * * * * * * * 100 * 1,275ACTUAL(C)* 1,175 * * * * * * * * * * * * 1,175
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
801 HL99AUTSM NY FAMILIES FOR AUTISTIC CHILDRENCONS 004 CONSTRUCTION 85 0 06/13
CO#: A2 CONS 004 CONSTRUCTION 1,175 0 07/12CONS 005 CONSTRUCTION 15 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 425WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN328 FMS #: 816 A48 PLANNED PARENTHOOD OF NEW YORK CITYAVAILABLE BALANCE AS OF: 11/30/12 $98,398.29 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $35,194.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $375,407.71 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 128 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* 35 * * * * 5-* * * * * * * 98 * 128FORCST(C)* 35 * * * * 5-* * * * * * * 98 * 128ACTUAL(C)* 35 * * * * 5-* * * * * * * * 31
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
816 HL98PPNYC PLANNED PARENTHOOD OF NYC -MOBILE MEDICAL UNIT PURCHASECO#: 00 EQFN 004 EQUIPMENT AND FURNITURE 5- 0 11/12CO#: 01 EQFN 004 EQUIPMENT AND FURNITURE 5 0 06/13
850 HL82PPNY2 PLANNED PARENTHOOD OF NYCEQFN 001 EQUIPMENT AND FURNITURE 35 0 07/12EQFN 004 EQUIPMENT AND FURNITURE 93 0 06/13IFSP 010 IFA CONSTRUCTION SUPERVIS 1 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 426WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN336 FMS #: 816 B02 PROJECT RENEWALAVAILABLE BALANCE AS OF: 11/30/12 $359,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 359 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 359 * 359FORCST(C)* * * * * * * * * * * * 359 * 359ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HL82PCRHL PROJECT RENEWALEQFN 001 EQUIPMENT AND FURNITURE 359 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN346 FMS #: 816 A52 RICHMOND UNIVERSITY MEDICAL CENTERAVAILABLE BALANCE AS OF: 11/30/12 $2,608,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $1,203,000.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* 1,064 * * * * (C)* 2,608 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 2,608 * 2,608FORCST(C)* * * * * * * * * * * * 2,608 * 2,608ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
816 HL82RCHD RICHMOND UNIVERSITY MEDICAL CENTER-ANGIOGRAPHY & CTEQFN 003 EQUIPMENT AND FURNITURE 250 0 06/13EQFN 004 EQUIPMENT AND FURNITURE 458 0 06/13EQFN 005 EQUIPMENT AND FURNITURE 86 0 06/13
816 HL82RCHU Richmond University Hospital - Purchase Medical EquipmentEQFN 008 EQUIPMENT AND FURNITURE 750 0 06/13
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 427WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HLDNRICHM RICHMOND MEDICAL CENTER - MAJOR HOSPITAL EQUIPMENT REHAB.EQFN 001 EQUIPMENT AND FURNITURE 1,064 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN357 FMS #: 816 A53 RUSK INSTITUTE OF REHABILITATION MEDICINEAVAILABLE BALANCE AS OF: 11/30/12 $375,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 375 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 375 * 375FORCST(C)* * * * * * * * * * * * 375 * 375ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HL99NYURI NYU HOSPITAL CENTER - THE RUSK INSTITUTE - EQUIPMENTEQFN 001 EQUIPMENT AND FURNITURE 375 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 428WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN359 FMS #: 816 A54 RYAN/CHELSEA-CLINTON COMMUNITY HEALTH CENTERAVAILABLE BALANCE AS OF: 11/30/12 $1,047,246.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $297,906.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 1,047 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 1,047 * 1,047FORCST(C)* * * * * * * * * * * * 1,047 * 1,047ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
816 HL98RCCCH RYAN CHELSEA-CLINTON COMM - PURCHASE FULL SERVICE MED VANEQVH 002 EQUIPMENT - VEHICLES 1,047 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
BUDGET LINE: HL-DN363 FMS #: 816 A56 SAINT BARNABAS HOSPITALAVAILABLE BALANCE AS OF: 11/30/12 $1,159,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $.00 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $500,000.00 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 1,128 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * * * * * * * 1,128 * 1,128FORCST(C)* * * * * * * * * * * * 1,128 * 1,128ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HLDNSBARN ST BARNABAS HOSPITAL DIAGNOSTIC IMAGING SYSTEMEQVH 001 EQUIPMENT - VEHICLES 969 0 06/13IFSP 002 IFA CONSTRUCTION SUPERVIS 31 0 06/13
850 HL82SBARN ST. BARNABAS HOSPITAL - PURCHASEEQFN 001 EQUIPMENT AND FURNITURE 159 0 06/13
------------------------------------------------------------------------------------------------------------------------------------
SOLIMAR SOLASC JL132 NONE
X::PDF(F)PX(S)MT(MAIN)
FY 2013 AUTHORIZED COMMITMENT PLAN PAGE: 429WITH FY 2013 PLAN AND FORECAST AND ACTUALS
($ IN THOUSANDS / COMMITMENT TOTALS EXCLUSIVE OF IFA)
BUDGET LINE: HL-DN367 FMS #: 816 A58 ST. MARY'S HEALTHCARE SYSTEM FOR CHILDRENAVAILABLE BALANCE AS OF: 11/30/12 $4,881,000.00 (CITY) $.00 (NON-CITY)CONTRACT LIABILITY: $41,375.36 (CITY) $.00 (NON-CITY)ITD EXPENDITURES: $4,624.64 (CITY) $.00 (NON-CITY)
* FY 13 * FY 14 * FY 15 * FY 16 * * FY 13 * FY 14 * FY 15 * FY 16 *____________________________________________________________________________________________________________________________________ADOPTED (C)* * * * * (C)* 4,860 * * * *APPROPRIATIONS COMMITMENT PLAN
(N)* * * * * (N)* * * * *____________________________________________________________________________________________________________________________________FY 2013
JULY AUG SEPT OCT NOV DEC JAN FEB MARCH APRIL MAY JUNE FY 13____________________________________________________________________________________________________________________________________PLAN (C)* * * * * * 2,484 * * * * * * 2,376 * 4,860FORCST(C)* * * * * * 2,484 * * * * * * 2,376 * 4,860ACTUAL(C)* * * * * * * * * * * * *
* * * * * * * * * * * * *PLAN (N)* * * * * * * * * * * * *FORCST(N)* * * * * * * * * * * * *ACTUAL(N)* * * * * * * * * * * * *____________________________________________________________________________________________________________________________________
MGN PROJECT CITY NC PLAN CURRENT MILESTONEAGY ID NO DESCRIPTION COST COST COMM DATE MILESTONE START END____________________________________________________________________________________________________________________________________
850 HLDNMARYS ST. MARY'S HEALTH CARE SYSTEM FOR CHILDRENEQFN 001 EQUIPMENT AND FURNITURE 1,000 0 06/13
850 HL82MHHS ST. MARY'S HEALTH CARE SYSTEM FOR CHILDREN HOSPITALEQFN 002 EQUIPMENT AND FURNITURE 68 0 06/13
CO#: RG EQFN 002 EQUIPMENT AND FURNITURE 1,661 0 12/12IFSP 005 IFA CONSTRUCTION SUPERVIS 46 0 06/13
850 HL82SMAR2 ST. MARY'S HOSPITAL FOR CHILDR