Purpose Main Objectives Evaluate the groundwater mound in the
vicinity of lands irrigated by CNPPID facilities Provide an
understanding of the temporal and spatial changes of the
groundwater mound Identify factors affecting the groundwater
mound
Key Terms CSD Wells Database of water levels from wells used in
CSD report
Slide 5
Key Terms Study Area
Slide 6
Groundwater Mound Study Recap Estimated Mound Volume CSD well
method Water balance method Subareas Spatial and Temporal Movement
Adjustment Impact Diversions ET
Slide 7
Groundwater Mound Size and Shape Annual Groundwater Mound
Volume
Slide 8
Groundwater Evaluation Water Balance
Slide 9
CSD Mound Volume Compared to Water Balance Mound Volume Mound
Volume Calculated using the Water Balance Mound Volume Calculated
using CSD Well Data
Slide 10
Water Balance Adjusted Diversions Annual Groundwater Mound
Volume No Diversions 50% Diversions 75% Diversions CSD Well Data
125% Diversions 100% Diversions 25% Diversions
Slide 11
Water Balance Adjusted ET Annual Groundwater Mound Volume 95%
ET 98% ET 105% ET 102% ET CSD Well Data Un-Adjusted ET
Slide 12
Primary Conclusions Groundwater Mound Size and Volume
Increasing trend from the 1950s to 2000. No longer an increasing
trend since 2000.
Slide 13
The Future of the Mound Declining Surface Water Recharge
Reduced Water Supply in Lake McConaughy (Allocations) Increased
efficiencies (Conservation) 1950-2000 average recharge = 145,000 af
Since 2000 average recharge = 90,000 af Declining Mound Negative
Water Balance