The cases which have been processed by State Government but pending for Forest Clearances- as on
27.09.2016.
State S.
No.
Name
of the
Applica
nt
Mineral Area
(Hect.)
Village and
Dist.
Date of
Approval under
5(1) , if
scheduled
mineral
Letter
of
Intent
issued,
if non-
schedul
ed
minera
l
Date of
applica
tion of
Stage –
I of FC,
if
applied
Date of
Grant of
Stage-I
of FC, if
granted
Date of
applicati
on of
Stage –
II of FC,
if
applied
Date of
Grant of
Stage-II of
FC, if
granted
Presentl
y case
pending
with
Action required
& Timeline
agreed.
Andhra
Pradesh
NIL
Chhattisgarh Cases pending with MoEF
1 CMDC/
NMDC
NCL
Iron Ore 646-596
Deposit No. 4,
Dantewada
30.11.11
- 16.4.15
(Revise
d)
- - - MoEF Meeting held on
24.08.2016.
MoEF to
expedite stage 1
order. MoEF
may expedite
decision by
16.10.2016
2 M/s
Monet
Ispat &
Enargy
Ltd.
Raipur -
Iron Ore 78-09
Hahaladdi,
Kanker
06.10.04
-
28.12.04 - - - MoEF FAC held for
Stage I, Moef to
expedite grant
order. MoEF may
expedite decision
by 16.10.2016.
Cases Pending with State Forest/ Company
Chhattisga
rh
1 M/s
Monet
Ispat &
Enargy
Ltd.
Raipur
Limeston
e
252-552 Posri and Guma,
Balodabazar
- 5.10.201
0
30.9.201
3
(Revise
d area)
Not
submitt
ed
- - - Applican
t
Applicant to
expedite the
matter by
10.09.2016.
2 M/s
Jindal
Steel &
Power
Limeston
e
121-690
Godadih,
Bilaspur
- 04.10.0
8
5.2.201
0
13.6.13 10.5.14 11.9.15 State
Forest
Deptt.
for
issuance
of Final
Order.
Compliance
submitted with
FC on
27.8.2016.
Mines Dept. to
ask State Forest
Dept. to expedite
the matter by
16.09.2016.
3 M/s SKS
Ispat &
power
Ltd.
Raipur
Lime Stone 299-751 Lohrabodh,
Bilaspur
- 13.10.0
8
21.05.2
011
(Registr
ation
No
2011/04
7)
Applicati
on
submitted
on
29.08.201
6
- - State
Forest
State Forest to
forward Stage I
application to
MoEF by
16.09.2016.
4 M/s
Navbhara
t Fuse
Company
Ltd.
Raipur
Iron Ore 220-00
Rasuli, Kanker 24.09.08
-
Registere
d on
2010
Documen
t
submitted
on June
2015
- - - Applicant Applicant finding
land for CA, may
expedite the
matter by
16.09.2016.
5 Shree
Bajarang
power
Ispat Ltd.
Raipur
Iron Ore 57-00
Chotedongar,
Bastar
13.04.11
-
4.4.15 - - - Applicant
& State
Forest
Panbchayat NOC
to be obtained.
State Forest to
expedite the
matter by
16.09.2016.
6 M/s Inds
Senergy
Ltd.
Iron Ore 313
Hahaladdi,
Kanker
08.05.08
-
25.9.08 26.10.12 - - Applicant
for NPV
& CA
deposit
Applicant had
difficulty in
arranging finance,
but assured to
expedite the
matter by
20.09.2016.
7
CMDC Bauxite 99-35 Pathrai, Sarguja 7.3.13 - 30.5.16 - - - State
Forest
Stage I
compliance
submitted. SG to
expedite the
matter by
16.09.2016.
8 CMDC/
NMDC
Iron Ore 413-745
Deposit No. 13,
Dantewada
13.02.07
-
- 12.11.14 12.2.15 - Applicant,
State
Forest &
MoEF
Land identified
for CA.
Compliance to
be sent to MoEF
this week.
MoEF may
expedite
decision by
16.09.
2016
9 M/s
Jaisawal
Neco Ltd.
Iron Ore 50-00
Metabodli,
Kanker
06.10.04
-
12.5.04 22.10.13 9.1.14 - Applicant,
MoEF &
State
Forest
Clarification
sought from
MoEF regarding
the amount of
CA Land
required, which
is awaited. Letter
has been sent on
16.12.2014 By
PCCF
Chhattisgarh.
MoEF may
expedite
decision by
16.09.
2016. Applicant
submitting double
amount, but State
to expedite
compliance report
for Stage II
clearance to
MoEF.
Cases pending with Project Proponent.
1 M/s
Jaisawal
Neco Ltd.
Iron Ore 50-00
Metabodli,
Kanker
06.10.04
-
12.5.04 22.10.13 9.1.14 - Project
Proponent
Clarification
sought from
MoEF regarding
the amount of
CA Land
required, which
is awaited. Letter
has been sent on
16.12.2014 By
PCCF
Chhattisgarh.
MoEF may
expedite
decision by
16.09.
2016. Applicant
submitting
double amount,
but State to
expedite
compliance
report for Stage
II clearance to
MoEF.
2 M/s Arti
Sponge
Ltd.
Iron Ore 31-55
Alnar,
Dantewada
21.04.11
- 12.3.14 - - - Project
Proponent
Applicant to give
compliance to 15
point objections
by 16.09.2016.
Goa NIL
Gujarat NIL
Jharkhand Cases pending with MoEF
Jharkhan
d
1 M/s
Electros
teel
Casting
Ltd.
Iron ore
(ML)
192.50
Ha.
Kodlibad
(West
Singhbhum)
01.06.2006 - It relates to MOEF, GOI Stage-II FC is
not submitted by
the applicant.
Saranda cases.
MoEF may
expedite
decision by
16.09.
2016
2 M/s
Rungta
Mines
Ltd.
Iron ore
(ML)
350.50
Ha.
Kodlibad
(West
Singhbhum)
18.04.2006 - Stage-II FC is
not submitted by
the applicant.
Saranda cases.
MoEF may
expedite
decision by
16.09.
2016
3 M/s
Arcelar
Mittal
India
Ltd.
Iron ore
(ML)
500.00
Ha.
Silpungi etc.
(West
Singhbhum)
05.06.2008 - It relates to MOEF, GOI Stage-I FC
isawaited.
Saranda case.
MoEF may
expedite
decision by
16.09.
2016
4 M/s
Rungta
Sons
Pvt.
Ltd.
Iron ore
(ML)
343.00
Acre
Bokna
(West
Singhbhum)
11.09.1990 - 15.12.2
003
Under
process.
Pending
with State
Govt
- - - Kept in abeyance
for Carrying
Capacity Study
Report. MoEF
may expedite
decision by
16.08.
2016
5
M/s
JSPL
Iron Ore 537 ha
Ghatkuri 6.9.2007 16.6.20
08
22.05 Kept in abeyance
due to Saranda
forest land.
MoEF may
expedite
decision by
16.09.
2016
Jharkhand State is not sending comments report on ICFRIE. SG needs to expedite.
Cases Pending with State Forest/ Company
Jharkhand 1 M/s
Manmo
han
Mineral
Pvt.
Ltd.
Gold
(ML)
134.80
Acre
Lawa,Nimdih
etc.
(Sarai Kela)
22.02.2010 - State
Forest
Dept
Integrated
wildlife
Management
Plan to be
approved by
State Forest
DEpt. for
onward
processing of
Stage II FC.
2 M/s
Bhusha
n Power
& Steel
Ltd.
Iron ore
(ML)
422.75
Ha.
Ghatkuri
(R.F)
(West
Singhbhum)
14.09.2007 - State
Forest
Departm
ent
FC application
pending with
State Forest
Dept. for being
sent to MoEF
due to area
falling in
Saranda Forest
area.
Karnataka
Cases Pending with MoEFCC
1
M/s.
Bellary
Steel
and
Alloys
Ltd.
Iron Ore 99.15 Muraripura Approved
21/1 /1999
ADV1993 Sl.
No. 16, Received
08 applications
pursuant to the
notification.
After conducting
hearing GoK
considered the
area in favour of
this applicant.
GoI accorded
prior approval on
22.01.1999.
Govt. vide letter
19.03.1999
sought
clarification as to
whether the
proposed land
belongs to Forest
or Revenue and
other
information/docu
ments. Further
no
correspondence.
15 years lapsed.
Govt. directed to
submit
individual
proposals in
respect of 5(1)
approved cases.
DGPS survey
conducted. Govt.
yet to issue in
principle
approval or
Section 5(1)
notification. As
per GOK, the
party has
submitted the
R&R Plan the
fix the
production
target to State
DMG for
further
necessary
action.
2
Shri N.
Sathyan
arayana
Iron Ore 15
Hect. Nandihalli
Approved
dt :9 /6 /2006
DGPS survey
conducted. Lease
deed is to be
executed after
obtaining delay
condonation
from the Govt.
and on
submission of
stage-II F.C. PL
to ML case. The
case is pending
with DC office
of Bellary
regarding the
constitution of
committe and
FC pending.
3
Shri G.
Mallikar
juna
Babu
Iron Ore 17.4
Hect. Dharamapuri
Approved dt
:11/8 /2010
Govt. heard and
passed
proceedings on
09.06.2016.
Applicant has to
furnish
complaince. FC
is pending due
to non
submission of
DGPS survey
sketch to the
Forest Dept of
the State.
4
M/s.
Umiya
Holding
Pvt.
Ltd.
Iron Ore
,Mangan
ese Ore
6 Hect. NER Range Approved
dt :14/2 /2006
The matter is
pending with
GOK due to
overlapping
issue with M/s
MML & M/s
Mineral
Syndicate.
5
Sh. B.
Rudra
Gowda
Mangane
se
Ore,Iron
Ore
68.31
Hect. N.E.B. Range
Approved
dt :12/12/2007
All statutory
clearances
obtained except
FC. Stage II
pending.
Presently the
case is pending
before Hon'ble
Delhi High
Court due to
overlapping
issue.
6
M/s.
P.M.
Mines
&
Mineral
s Pvt.
Ltd.
Iron Ore 210
Hect. NEB Range
Approved
dt :22/7 /2008
All statutory
clearances
obtained except
FC. In the
meanwhile,
overlapping
found with the
area reserved in
f/o VISL after
CEC survey.
Grantee filed
revision petition
before GoI.
Presently the
case is pending
before Hon'ble
Delhi High
Court.
7
M/s
Upendra
and
Compan
y
Iron ore
&
Mangane
se ore
121.41
Ha
Yarrekatte
Tumkur
Approved on 21-
04-2006
Grantee has
submitted all
clearances
except FC.
Pending with
lessee.
But the
considered area
is notified area
for Manganese
and this
applicant
company is a
sole applicant,
without
conducting
hearing
recommended
this application
for grant. FC is
pending due to
deemed forest
issue and party
has to provide
the
compensatory
land.
Cases Pending with State Forest/ Company
1
Shri
J.M.
Vrushab
endraiah
Iron Ore 8.81
Acre Ramgarh
Approved
dt :26/9 /2007
Grantee has
made a proposal
on 7.02.2014 for
FC which is
pending. EC &
FC is pending
with State
Forest as on
date.
2
M/s.
Asha
Mining
Co.
Iron Ore 25 Acre R.M. Block Approved
dt :24/7 /2006
Party has to
submit the
compensatory
land to the
Forest Dept. to
further
processing of
FC. There is no
provision of
purchasing
agricultural
land in
Karnataka
State. Pending
with State
Forest.
4
Allum
Prashant
h
Mangane
se
19.50
Ha
Kanchihalli
Chitradurga
Dist
Approved on 24-
03-2011
Translation of
kannada letter
and other
related issue is
pending with
the Forest Dept.
of Chitradurga
as reported by
the applicant.
Pending with
State forest.
5
M/s.
Umiya
Holding
Pvt.
Ltd.
Iron Ore
,Mangan
ese Ore
6 Hect. NER Range Approved
dt :14/2 /2006
The matter is
pending with
GOK due to
overlapping
issue with M/s
MML & M/s
Mineral
Syndicate.
Pending with
State Forest. Sg
to decide in 15
days.
Madhya Pradesh
Cases pending with MoEF
Madhya
Pradesh
1 M/s Rio
Tinto
Explorat
ion India
Pvt Ltd.
Diamond
and
Kimberlit
e
971.5
95
(954
ML+1
7.595
Appro
ach
Road)
Bakswaha/
Chhatarpur
17.11.2011 -- 31.05.2
014
11.08.201
5
-- MoEF MP approved. In
principle EC
received.
Wildlife
Conservation
Plan approved.
Objections
raised by FAC.
Cases Pending with State Forest/ Company
1 Modern
Mineral
Industrie
s
Manganes
e
7.088 Khapadripar/
Chhindwara
21.04.2011 --
Pending for
submission of
AMP/FC.
Applied to
Forest
Department for
FRA clearance
which is under
process. To be
expedited by
Sep, 2016.
2 Modern
Mineral
Industrie
s
Manganes
e
10 Madkasur/
Chhindwara
08.07.2011 -- MP approved &
FC awaited.
FRA clearance
obtained. NPV
to be deposited.
To be expedited
by Sep, 2016
3 M/s
Anik
Industrie
s Ltd.
Manganes
e
130 Mirgpur/
Balaghat
13.08.2009 MP approved.
Pending for
submission of
FC. To be
expedited by
Sep, 2016
4 Maa
Kali Iron
and steel
Co.
Iron Ore 11.56 Pahadi/ Katni 26.11.2008
FC required, the
CA land has
been rejected.
Pending for
court case, the
case yet to be
recommended
from the State
Forest dept.
5 AP
Trivedi
Manganes
e
4.20 Ramrama,
Balaghat
24.09.2012 MP approved.
Approval of
SPCB. FC
approval
awaited.
Approval of
Forest Awaited.
To be expedited
by Sep, 2016
6 Aparn
Ferro
Alloys.
Manganes
e
69.22 Mohaganvgh
at /Balaghat
16.11.1993 FRA clearance
obtained. MP
approved.
Revision of MP
required after
change in land
status. FC
applied.
7 M/s
Jivan
Lime
Chemica
l
Bauxite 4 Jariyari/
Satna
16.09.2013 MP approved,
FC Stage I
granted. Final
order FC-II
awaited. EC
under process
DIEAA
Maharashtra Cases pending with MoEF
1 Smt.
Nila V.
Dempo
&Shrini
vas V.
Dempo
Iron Ore 263.82 Zolambe,
Dist.
Sindhudurg
01/08/2008 --- Not
granted
Forest
Departme
nt
ESZ , Pending
with MoEF. MoEF may
expedite decision
by 16.08. 2016
Cases pending with Other departments of MoEF.
1 M/s.
Puntam
bekar
Mineral
s
Bauxite 206.37 Talagaon
&Baveli,
Dist.
Kolhapur
30/06/2005 --- Not
granted
Forest
Departme
nt
Wild
Life
Departm
ent
EC has been
granted in april,
2016 subject to a
wild life issue to
be cleared by
NBWL. MoEF
may expedite
decision by
16.08.
2016
2 M/s.
Jaiswal
Neco
Ltd.
Mangane
se Ore
61.45 Ramdongari,
Dist. Nagpur
01/12/2006
--- Not
granted
Forest
Departme
nt
Pending with
MoEF for issue
of final
notification
about the
sanctuary
concerned as the
draft was already
issued in Mar,
2016.
Cases Pending with State Forest/ Company
1 M/s.
Gopani
Iron
&Power
(India)
Pvt.
Ltd.
Iron Ore 153.09 Surjagad
Wooria, Dist.
Gadchiroli
01/06/2006 --- Forest
Departme
nt
Gram
Panchaya
t
FC stage 1
applied and
pending for Wild
Life Clearance.
SG to expedite
the matter with
Gram Panchayat
to issue order.
2 M/s. Jai
Bamles
hvari
Iron Ore 4.30 Manegaon,
Dist. Gondia
16/11/2006
--- Not
granted
Forest
Departme
nt
Pending with
State Forest
Department. SG
to expedite the
matter by
16.08.2016.
Cases pending with Project Proponent.
1 M/s.
New
Limeston
e
293.12 Chedvi, Dist.
Chandrapur
----- 28/02/2
006
Due to land
ownership
India
Mining
Corpora
tion
issues, FC filed
in Mar, 2016
online.
2 M/s.
Murli
Industri
es Ltd.
Limeston
e
695.72 Chedvi, Dist.
Chandrapur
----- 28/02/2
006
Due to land
ownership
issues, FC filed
in Mar, 2016
online.
Odisha
Cases pending with MoEF
1
M/s.
Orissa
Sponge
Iron
Ltd.
Iron 459.00
Garjantoli &
Kadamdihi
Dist-
Keonjhar
17.07.02 - 05.09.2
005
03.06.201
3 - - MoEF
The diversion
proposal has been
accorded stage-I (In
Principle) approval
for 173.02 hect.
Against originally
proposed 269.1698
hect. Further an
extent 34.00 hect.
Of non forest land
has been considered
as forest land by the
Ministry during
their site inspection
for which GOI,
MOEF has sought
for separate
diversion proposal
and then
modification of
Stage-I approval
order. The user
agency has filed the
D.P. for 34.00
hect. which is under
scrutinity at the
field level. MoEF
may expedite
decision by
16.08.2016
2 K.C.
Pradhan Iron 24.57
Nayagarh
Dist-
Keonjhar
05.12.03 - 06.06.11 MoEF
Stage -II approval
has been accorded
GOI, MOEF vide
F. No-
5/ORC059/2007
FCE dated-
06.06.2011 over
20.310 hect. (
excluding safety
zone).NPV
amounting to Rs.
16084090/- paid
over total forest
land. Pending with
MoEF. MoEF to
expedite approval
for safety zone.
MoEF may
expedite decision
by 16.08.2016. MP
&EC approved.
The applicant
moved for
clearance over
entire forest area of
24.507 hects U/s
2(iii) of FC Act,
1980 which is
approved by
Regional Empower
Committee, Easter
Regional Office
MoEF, Govt. of
India.
3
M/s.
National
Enterpri
ses
Iron 15.074
Adaghat
Dist-
Sundergarh
04.10.2000 - 02.11.2
004
MoEF
& C.C,
GoI
Forest diversion
proposal for entire
forest land has been
sent to MOEF &
CC, ERO vide
letter
no.12469/F&E
dated-16.07.2015
of F&E Deptt.
Pending with
MoEF. MoEF may
expedite decision
by 16.08.2016
4
M/s.OC
L India
Ltd.
Iron &
Mangane
se
45.131
Kundaposi
Dist-
Keonjhar
29.09.2008 - 16.10.2
009
MoEF The proposal has
been submitted to
MOEF vide no.
7591 dated-
26.04.2014 of State
Govt. Pending with
MoEF subject to
NEERI. MoEF may
expedite decision
by 16.08.2016
5
M/s.Pra
kash
Industri
es Ltd.
Iron &
Mangane
se
19.532 SirkaguttaDis
t-Keonjhar 17.06.09 -
03.11.2
010
Pending
with
MoEF,
GoI due
to want of
NEERI
report
- -
MoEF The diversion
proposal has been
submitted to GOI,
MOEF vide letter
No.12266/F&E
dated-05.07.2014.
Pending with
MoEF subject to
NEERI. MoEF may
expedite decision
by 16.10.2016
6 D.C.
Jain
Iron &
Mangane
se
257.78
Sidhamatha
R.F
Dist-
Keonjhar
04.03.83 -
MoEF The proposal has
been submitted to
MOEF vide no.
14850/F&E dated-
13.09.2010 of State
Govt. The State
Govt. F& E deptt
forwarded its
recommendation
for approval u/s
2(III) to MoEF &
F&C.C, GoI vide
letter
dated.16.06.2016.
Pending with
MoEF subject to
NEERI. Grant
order revoked by
SG and State has
gone to High Court.
Matter Subjudice
7 Dr. S.
Pradhan
Iron &
Mangane
se
94.256
Sidhamatha
R.F
Dist-
Keonjhar
04.03.83 - 2005 21.09.06 26.09.07
MoEF Stage-II approval
has been accorded
by GoI, MoEF vide
F.No. 8-100/2006-
FC dated
26.09.2007 over
85.55 hect. Balance
area applied for FC
by U/A u/s 2(III).
Pending with
MoEF subject to
NEERI. MoEF may
expedite decision
by
16.08.2016.Safety
Zone clearance
issue.Legal Heir
issue pointed out
by FC is also
beinfg sorted by
the State Govt in
consultation with
the Legal dept.
8 Dr. S.
Pradhan
Iron &
Mangane
se
152.93
Kalaparbat
Dist-
Keonjhar
08.04.99 - 20.10.1
997 03.11.04 15.01.07
MoEF Stage-II approval
has been accorded
by GoI, MoEF vide
F. stage-II approval
F.No. 8-177/1997-
FC dated
15.01.2007 over
52.002 hect.
Balance area
applied for FC by
U/A u/s 2(III).
Pending with
MoEF. Safety Zone
issue. MoEF may
expedite decision
by 16.08.2016.
Safety Zone
clearance
issue.Legal Heir
issue pointed out by
FC is also beinfg
sorted by the State
Govt in
consultation with
the Legal dept.
9
Rudrase
n
Sindhu
Mangane
se 65.71
Bhanjapali,
Koira,Dist-
Sundergarh
14.12.1999 - 20.01.14
MoEF Stage-II approval
accorded by GoI ,
MoEF vide letter
no. 8-6/2004-FC
dated-20.01.2014
(excluding safety
zone). Full amount
of NPV for Rs.
3,36,53,200/-has
been realised.
Safety Zone issue.
MoEF may
expedite decision
by 16.08.2016.
Safety Zone issue.
Matter pending
with MoEF since
June 16
10
M/s.
Nilachal
a Ispat
Nigam
Ltd.
Iron 874.29
Kadalia,
Mithrida etc.
Dist-
Sundergarh
20.05.99 -
MoEF The Proposal for
diversion of
806.153 hect of
forest land
(including 16.601
hect for safety
Zone) with in
874.290 hect of the
mining lease
granted area for
Iron Ore mining in
sundargarh and
Keonjhar District of
Odisha has been
forwarded to the
MoEF &CC, Govt.
of India vide letter
No. 17199/F&E dt.
19.08.2013 of F&E
Department, Govt.
of Odisha. NPV
not demanded.
Pending with
MoEF subject to
NEERI. MoEF may
expedite decision
by 16.08.2016
11 M.
Aikath Chromite 56.656
Ostapal
Jajpur
NA
However, grant
order issued on
29.06.1991
Granted
GP No.
7829/S
M
dt.29.06
.1991
MoEF MP & EC
approved. FC
pointed out issues
of legal heir which
has been answered
on 31.8.2016. FC
obtained over
14.836 hects. out of
total forest area
39.179 hects.,
Application U/s
2(iii) of FC Act,
1980 pending with
State Govt. NPV
not paid over the
Forest area which
was to be paind
within 60 days. But
now the NPV has
been deposited on
7.9.2016 and sent
to MoEF for
expediting FC.
12
M/s.Shr
ee
Metalik
s Ltd.
Iron &
Mangane
se
35.774
Khandabandh
& Baitarni
R.F.
Keonjhar
13.04.2007 -
MoEF Stage-I (in principle
) approval accorded
by GOI, MOEF,
vide F.No.5-
ORC097/2010-
BHU dated-
11.03.2011. The
stage-I compliance
received from
RCCF, Rourkela
Circle is fowarded
by PCCF, Odisha to
Govt, F&E
department on
17.05.2016. The
matter pending
with RO, of MoEF
from 11.08.2016
for considering the
compliance of
Staege I and grant
of Stage II
clearance
13
M/s.
SMC
Power
&
Generati
on Ltd.
Iron 246.04
Khandabandh
a & Baitarani
RF, Keonjhar
07.04.2010 -
MoEF
Govt. have
accepted the
reduced area over
176.816 hects. The
applicant submitted
Mining plan for
revised area and
applied for EC
online on
02.08.2016. Forest
clearance for
approval U/s 2(iii)
FC Act, 1980
initiated by the
applicant which is
pending with
MoEF, Govt. of
India. Online
submission of FC
on 6.9.2016 and
asked for CA land
DGPS survey to be
completed by the
applicant within 15
days.SG to
facilitate with the
help of concerned
departments -
Forect, Revenue &
mining
Cases Pending with State Forest /Company
1 Miter
Sen
Mangane
se 21.356
Katasahi
Keonjhar
NA
However LoI
issued on
08.01.2004
State
Forest
MP appvd on
25.9.2005. PH
conducted on
26.12.3012, and EC
pending for FC. FC
applied in 2008, but
FRA pending with
DFO. The State
Forest may be
asked to expedite
by Sep, 2016
2
Sri
Jagdish
Mishra
Mangane
se 19.6
Sarkunda,
Sundergarh
NA
However LoI
issued on
07.09.93
-
State
Forest
Mining Plan
approved
25.9.1994.No
precondition of EC.
Forest Clearance
applied on
04.06.2016,
pending with State
Govt.
3
M/s.
Pradhan
Associat
es
Iron &
Mangane
se
484.75
Rengalbeda
& Segasahi
Keonjhar
NA
However, LoI
issued on
13.11.1991
-
State
Forest
Diversion proposal
received from user
agency during
28.03.2016 has
been forwarded to
DFO, Bonai for
compilation of part-
II.
As reported by
DFO, Bonai
division, DDM,
Koira, Tahsildar,
Koira & RO, Koira
have been
requested to submit
authenticated land
schedule of applied
ML area vide his
memo no. 2252
dated-16.03.2016.
which is awaited.
MP approved. EC
applied online on
12.08.2015, but
TOR not given in
want of NEERI
report. FC initiated
but pending with
the DFO for
inspection from
March, 2016. The
inspection date has
been fixed on
17.9.2016.FC not
obtained but
applied U/s 2(iii) of
FC Act, 1980 on
12.02.2016.
4
M/s.
OMC
Ltd.
Iron &
Mangane
se
416.835
Kundrupani
&
Chormalda,
Keonjhar
06.11.2007 -
State
Forest
Survey plan to be
finalised after
completion of
DGPS plan by
ORSAC and
Mining plan to be
filed by 15 Oct,16.
The FC under 2(iii)
is to applied by end
of Sep, 2016
5
M/s.
Pradhan
Industri
es
Graphite 58.704 Bainibasa,
Koraput -
LoI
issued
vide
letter
No.
6325/S
M dt.
20.06.0
5
State
Forest
Survey &
Demarcation of the
area is not
completed so far.
Due to district
change and Hal
settlement maps not
available with the
revenue
department. DGPS
to be completed by
Sep, 2016 by the
applicant. MP, EC
& FC not applied,
to be expedited by
the applicant.
6
M/s.
Pradhan
Associat
es
Mangane
se 39.678
Sirilijor,Kora
pt
NA
However, LoI
issued on
18.11.04
-
State
Forest
Survey &
Demarcation of the
area is not
completed so far.
Due to district
change and Hal
settlement maps not
available with the
revenue
department. DGPS
to be completed by
Sep, 2016 by the
applicant. MP, EC
& FC not applied,
to be expedited by
the applicant.
7
M/s.
OMC
Ltd.
Bauxite 428.31 Kodingmali
P.F, Koraput 11.01.1999 -
State
Forest
MP & EC
approved. FC not
obtained. The
applicant has
moved application
for approval of FC
U/s 2(iii) of FC
Act, 1980, pending
with MoEF Govt.
of India. As FC
applied in 2000 but
still not got Stage I.
The DGPS survey
issue to be sorted
out by DDM
Koraput to enable
application of
Mining Plan by 31t
Oct, 2016
Rajasthan
Cases pending with MoEF
Nil
Cases Pending with State Forest
1 M/s.
Ojaswi
Marbles
&
Granite
Pvt.
Ltd.
Iron ore 180 Deepas/Sikar 17-12-13 05-12-
14
Applied
in year
2014
No No No State
Govt.
State FAC has
cleared the
proposal on
16.03.2016,
pending with
MoEF for onward
processing.
MoEF may
expedite decision
by 16.08.
2016. Reply from
State forest not
received.
2 M/s.
Steel
Authorit
y of
India
Iron ore 871.386
1
Dhulkhera/B
hilwara
02-09-13 01-07-
15
16-06-
16
No No No State
Govt.
State Forest
department is in
the process of
forwarding the
application to
MoEF for onward
processing.
MoEF may
expedite decision
by 16.08.
2016. Not
Traceable.
Tamil
Nadu
NIL
Telangan
a
NIL