  • The case of Poseidon Med, LNG Bunkering Challenges at Port

    Panayiotis Mitrou

    Technology & Innovation ManagerMarine & Offshore, Business Development

    Gasnam Congress8th March 2017

  • 2

    Med LNG Projects

    3 projects 100 Partners125 million

    Euro

  • 3

    Med LNG Projects

    Planning Analysis Implementation Study Detailed Pilot Studies Regulatory Gap Analysis Proposal

    Detailed Safety Assessments Detailed Technical Studies Works Regulatory action follow up

  • Poseidon Med II Overview

    Objectives, partners etc3 EU Countries

    Sustainable LNG

    pricing patters

    Executive Design

    and Construction

    17 Project

    Activities

    Complete Ports

    and LNG

    infrastructure

    study

    Regulatory

    Framework

    Adaptation

    Complete

    network of

    ports

    Sustainable

    Financing

    Schemes

    10+ Vessels

    Retrofits

    7 diverse types of

    studies on vessels

    and bunkering

    operations

  • Activity 1 Project Management

    Activity 2 Dissemination

    Activity 3 Social & public consultation - awareness

    Activity 4 Installation Financial assessment

    Activity 5 Financial Instrument for Global Project Inv

    Activity 6 Environmental, Safety, & Detailed Site Planning studies

    Activity 7 Updating of the Ports Master Plans

    Activity 8 Supporting (Baseline) Engineering Studies

    Activity 9 Preliminary Eng. design additional harbour infrastr

    Activity 10 Environmental and Safety Studies

    Activity 11 Final Construction eng design additional port infrastr.

    Activity 12 Tender Documents

    Activity 13 Adaptation and implementation regulatory framework on LNG bunkering

    Activity 14 Vessel Installations

    Activity 15 Pilot Case: Executive Design and Construction of an Innovative LNG Vessel

    Activity 16 Efficient Supply Chain (Logistics) Activities

    Activity 17 Sustainable LNG pricing patterns

    POSEIDON MED Activities: 17 in total

  • 6

    POSEIDON MED Aspects

    Regulatory Framework

    Engineering Studies

    Environmental Assessment

    Statutory Permissions

    Financial Assessment

    Infrastructure

    Vessels Consumers

    Ports Layout Assessment

  • Poseidon Med II Key Activities

    LNG Small Scale Carrier

    Basic Particulars:

    L max = 120 m

    B = 19.4 m

    D= 10.9 m

    T= 5.8 m

    Cargo tank capacity :

    6,000-6,500 m3

  • Poseidon Med II Key Activities

    Shipyard Preparedness

    Diagnosis on the practical aspects of the shipyard fabrication, welding and NDE

    operations

    Assess the shipyards design and construction capability, quality and

    management systems, and competence of production and inspection personnel

    for successful delivery of a gas carrier.

    During the process of the assessment, the shipbuilder will:

    gain knowledge on those challenges for the design and construction of gas

    carriers

    identify which aspects shall be addressed during design and construction

    identify shortages on manning, knowledge and skills

    implement an action plan to close whatever shortages have been identified

  • Poseidon Med II Key Activities

    Regulatory Framework Follow up From theory to Legislative Action

    Training, Human factors, developing the competencies library, assessing the roles on scene POAC

    Bunkering and Procedures Manuals (for Ports): Look at bottom up (local, national) and top down (international approaches and studies) input from PosMed I and combine with E.I.A. studies to be submitted

    Gas Market: Dynamics and Stakeholders that play a role revisions of certain laws and legislation to incorporate bunkering and the shipping aspect Big Gas Players to contribute

    Synergies and lessons learnt engagement of Authorities at all levels contact/workshops/meetings/understanding

  • Issues identified SIMOPS Exclusion Zones ,Risk acceptance Criteria , Methodology Quantity and Quality Shipowners contribution Training Ship & Shore, STS , Bunkering Installations Bunker barge conversion Technical feasibility IGC compliance with

    Hellenic Authorities Gas Engines leasing , Re- engining packages Engines kits warranties, implications Key Technical issues

    Tank Connection Space arrangements ( Categorisation of spaces) Vent location Bunkering rates and operations Tank arrangements in relation with IGF provisions Standardising connections and manifolds Shiptype influences decisions (double hull or high speed , small size)

  • Completion of all HAZID workshop Completion of Exclusion Zone Assessment

    for all ports Completion of all Navigational Simulation

    workshops Shipyard Preparedness Assessment HAZID for vessel (Festos Palace) retrofit

    designs Submission and under preliminary review

    of new buildings designs for LNG barge and LNG Feeder vessels

    11

    Work so far

  • Port Layout Assessment

    HAZIDs

    Visits and two-day workshops

    Scenario Interactions with vessels

    Routes , discussions, master plans

    Multi-criteria Site Evaluation

    Infrastructure, Terminals ,

    Synergies

    12

    Port Studies Layout and Solutions

  • 13

    Infrastructure and permitting case of Patras

    Poseidon Med Evaluation & Study process

    Confrontation of negative perceptions

    - Effective addressing of concerns

    from Member of Parliament

    Public Consultation, robust

    argumentation and presentation of

    solutions

  • 14

    Safety studies

    Risk assessment

    Navigational simulation

    Exclusion zones

    Vessel Track

    Vessel: Amaltheia 7 (L)Harbour: WorldCreated: 30/11/2016 10:03

    Wind: 35.00 kts 215 (Gusting)Current: 0.00 kts 0 Depth: Chart Datum

  • 15

    Port Studies Risk Assessment

    Site Survey

    Feasible types of bunkering operations

    Bunkering fuel capacity requirements

    Impact of LNG bunker barge operations onto marine traffic operations

    Address traffic control, quay operations, port support operations and emergency response.

    ship-to-ship (STS) alongside at jetty and LNG truck-to-ship (TTS) operations.

    Specific Recommendations and actions.

  • 16

    Port Studies Navigational Simulation

    Verify the safe passage of LNG barge and feeder vessels

    Verify the safe manoeuvre of feeder vessel and barge for berthing alongside

    Verify the number and size of tugs required

    Identify appropriate abort/emergency procedures.

    Vessel Track

    Vessel: LNG Carrier 005 (L)Harbour: PatrasCreated: 29/11/2016 08:42

    Wind: 18.00 kts 245 (Gusting)Current: 1.00 kts 45 Depth: Variable

  • 18

    Bunkering Operations from A to Z solutions offered

    ASSOCIATED STUDIES

    Hazard Identification (HAZID) Study Bunkering Hazard Operability (HAZOP) Study Navigation Simulation Study Consequence Modelling (For Bunkering Safety Zone

    Determination) Port LNG Bunkering Operating Procedures Development of a step-by-step methodology encompassing all

    phases of bunkering operations to establish Financial Analysis and LNG Demand Forecasting

  • Prescriptive Requirements of limited application

    More robust techniques required One transparent and common solution

    in terms of a :

    Unified Risk Assessment Methodology

    19

    Common Methodology in assessing risk differences in operations e.g. Cruiseships vs Tugs

  • 20

    LNG Port Operations Safety of Infrastructure Basic idea of LNG bunkering ship

    Small scale LNG carrier + Special equipment on board

    Technical Issues Design issues

    LNG storage Use of LNG on LNG bunkering ship Way to handle BOG from own LNG

    tank and from LNG receiving ship Way to transfer LNG to LNG receiving

    ship

    LNG tank Propulsion system and LNG fuel supply

    system LNG bunkering interface with LNG

    receiving ships Special equipment on board

    Requirement for LNG tanks:

    Flexibility in partial cargo loading Easy boil-of gas management (To cope with unfixed bunkering

    schedule) Low boil-off rate (To avoid loss of quality and amount of cargo) Low cost and low weight

  • 21

    LNG Port Operations Safety of Infrastructure

    Portfolio of Solutions Assessedfrom safety, technical and economic aspects

  • 22

    Port Operations Safety of Infrastructure

    Solutions :

    Port Market Questionnaire - Ship Types

    / Service Routes

    LNG Fuel Calculating Tool

    Site Evaluation Study (HAZID) Best

    Option

    Storage /Offloading Evaluation - Best

    Option

    Finalise GA bunkering jetty facilities /

    Specific Studies

    Update Port Master Plan

    Bunkering Operations HAZOP STS,

    TTS

    Challenges:

    LNG Service Requirements

    Port lay-out feasibility

    LNG Supply/Storage Options

    Type of Bunkering (STS, TTS,

    PTS)

    Ship operations / turnaround

    time

    Ensure Safety of Service

    Ensure Port/Public Safety

  • LNG Supply Infrastructure LNG Supply Scenarios to Port of

    Vancouver LNG Bunkering Operations LNG Bunkering Assets LNG Bunkering System LNG Bunker Quantity Measurement Port Control Operations STS Bunkering Operations at Location

    23

    Other Studies - Vancouver