The Burj Tower Presentation C t ti th W ldhi h t R Constructing the Worlds highest Tower TOWER BURJ T THE B

The Burj Tower

Embed Size (px)

DESCRIPTION

Constructing the World’s highest Tower in downtown Dubai...

Citation preview

Page 1: The Burj Tower

The Burj Tower

Presentation –C t ti th W ld’ hi h t

R

Constructing the World’s highest Tower

TOW

ERBU

RJ

TTH

E B

Page 2: The Burj Tower

ContentsContents

1. Models2. Project Brief3. Figures & Quantities

R

5. Sequence of Work

g Q

4. Structural Overview

TOW

ER 6. Cranage & Hoisting

7. Concrete Placement

BUR

J T

9. Spire Erection

8. Survey & Monitoring

THE

B 10. Photographs

Page 3: The Burj Tower

ModelModel

The Burj is a landmark high rise structure part of a very important development scheme in downtown Dubai

RTO

WER

BUR

J T

THE

B

Page 4: The Burj Tower

ModelModel

Some artistical impressions…

RTO

WER

BUR

J T

THE

B

Page 5: The Burj Tower

ModelModelR

TOW

ERBU

RJ

TTH

E B

Page 6: The Burj Tower

ModelModelR

TOW

ERBU

RJ

TTH

E B

Page 7: The Burj Tower

ModelModelR

TOW

ERBU

RJ

TTH

E B

Page 8: The Burj Tower

ModelModelR

TOW

ERBU

RJ

TTH

E B

Page 9: The Burj Tower

Project BriefProject BriefPinnacle

Project Name The Burj Tower

Spire

Communication (L160)

Duration 47Months (Feb. ’05 ~ Dec. ’08)

Cost 876,000,000 USD

Communication (L160)

Office (L153)

R

Owner EMAAR Properties

Floors Above 160 floors Residence (L108)

Observatory (L123)

TOW

ER

Floors Above 160 floors

Height Above 800m

Usage Hotel Residence Office

BUR

J T Usage Hotel, Residence, Office

Hotel (L39)

THE

B

Page 10: The Burj Tower

Project BriefProject Brief

.Client Emaar Properties PJSC

.Consultants

Project Manager Turner Construction Int’l

R

Project Manager Turner Construction Int’l.

Design Skidmore, Owings & Merill (SOM)

TOW

ER Supervision Hyder Consulting

Quantity Surveyor DG Jones Int’l

BUR

J T Quantity Surveyor DG Jones Int l.

Construction Period 01 Feb 2005 30 Dec 2008

THE

B .Construction Period 01 Feb 2005 – 30 Dec 2008

Page 11: The Burj Tower

Figures & QuantitiesFigures & Quantities

Some salient figures and quantities:g q

•Total height of the tower : More than 800 M

R

•Gross area tower : 279,000 sq. M

•Gross area podium : 186,000 sq. M

•Total concrete quantity tower : 145 000 cubic M

TOW

ER

•Total concrete quantity tower : 145,000 cubic M

•Total concrete quantity podium : 115,000 cubic M

•Overall concrete quantity : 260,000 cubic M

BUR

J T

•Overall rebar quantity : 34,000 tons

THE

B

Page 12: The Burj Tower

Structural Overview

• Y-shaped floor plan is ideal for residential program – Maximizes window perimeter to floor plate area– Is inherently stable

• Buttressed core

R

– Three wings arranged around central core– Each wing supports other two

• Setbacks occur at each wing in a spiraling pattern

TOW

ER

Setbacks occur at each wing in a spiraling pattern – Reduces vortex shedding by changing building shape 2

4 times

BUR

J T

THE

B

© 2003 All rights reserved.

Page 13: The Burj Tower

Structural OverviewR

TOW

ERBU

RJ

TTH

E B

Analysis Model

Page 14: The Burj Tower

H l R id i l

Structural Overview

Hotel Residential Floor plan

RTO

WER

BUR

J T

THE

B

Typical Floor Plan

Page 15: The Burj Tower

T S i i D i

Structural Overview

• 500 year Event

Tower Seismic Design

y

• Wind Typically Governs

R

• Seismic Only Governs near Top

TOW

ERBU

RJ

TTH

E B

Page 16: The Burj Tower

Structural Overview

• Location Elevation Drift ( ) ( )

Predicted Wind Drift

(m) (mm)

Top Communications +604.9 1450

R

• Top Office +569.7 1250

• Observatory +442.1 750

TOW

ER • Top Residential +375.3 540

BUR

J T • 50 year wind event

THE

B

Page 17: The Burj Tower

Structural OverviewR

TOW

ERBU

RJ

TTH

E B

3D View Under Construction

Page 18: The Burj Tower

Typical Work Sequence

Sequence of WorkSequence of WorkTypical Work Sequence

wing-A

A

wing-Cwing

C-1 C-3

C-2

A

[Section A-A]

R

Level 0Le el 1

wing-B

A

[Work Sequence]

TOW

ER

2 levels below

Level -1Level -2Level -3Level -4Level 5

3 to 5 levels below 2 levels below

BUR

J T 2 levels below

3levels belowLevel -5Level -6Level -7Level -8Level 9

Corner Slab

Center Lobby Slab

Wing Corridor Slab

Wing Slab

6 to 8 levels below

THE

B Level -9 Center Lobby Slab

Center Corewall Corner SlabWing CorewallNose Slab

Page 19: The Burj Tower

Work Sequence & Shoring Plan

Sequence of WorkSequence of Work

Work Sequence & Shoring Plan

Day 0

: Con’c Pouring

Day 1

: Slab formwork

Day 2

: Slab formwork

Day 3

: Con’c Pouring

: Rebar Installation

: MEP N+1

R

FormForm

N-1

N+0

Additional Raking Shore

Form

TOW

ER

1/2 of Raking Shore

1/2 of Raking Shore

N-2

N 31/2 of Raking Shore

Form

BUR

J T

2/3 of 1/3 of Prop

2/3 of Prop

2/3 of Prop

N-3

N-4

Shore

THE

B

PropProp

N-5

Tower Slab FormworkTower Slab Formwork

Page 20: The Burj Tower

Cranage & HoistingCranage & HoistingOverall Equipments LayoutOverall Equipments Layout. Tower Crane - 3 nos.

T/C#M1 : Favco M440D (25ton)T/C#M2 : Favco M380D (25ton)

Pump#1~#3

( )T/C#M3 : Favco M220D (11ton)

. Hoist - 14 cagesPh 1 (G d L100) H/C#1 #4 (8 )

R

T/C#M3T/C#M2

H/C#3 4

Phase 1 (Ground ~ L100) : H/C#1~#4 (8cages)Phase 2 (L100 ~ L142) : H/C#5~#6 (4 cages)Phase 3 (L142 ~ SL2) : H/C#7 (2 cages)Jump Hoist : Jump#1, Jump#2 (2 cages)

TOW

ER

H/C#3~4

H/C#5~6

H/C#7

p p , p ( g )

. Concrete Pump - 4 nos.Pump#1~#3 (Ground Level) : High PressureP #4 (L124) f S d P i

BUR

J T

T/C#M1

H/C#1~2Pump#4 (L124) for Secondary Pumping

. Concrete Placing Boom - 4 nos.CPB#1. for Center core : 32m Boom

THE

B T/C#M1CPB#2~#4. for Wing core : 28m Boom

Page 21: The Burj Tower

Tower Crane – Installation Method

Cranage & HoistingCranage & HoistingTower Crane Installation Method

Con’c Placing T/C#M3 M220D

T/C#M2 M380D

gBoom

Core wall formClimbing

R

3rd Bracket Installation

TOW

ER

Top collar

Installation Height : 48m

BUR

J T collar

Clamping Height

: 15.5 ~ 17m

T/C#M1 : M440D

THE

B

Bottom collar

Page 22: The Burj Tower

Tower Crane Dismantling Method

Cranage & HoistingCranage & Hoisting

Tower Crane - Dismantling Method

Multi Step Method

T/ STEEL EL: +704. 9TOP OF SPI RE

T/ STEEL EL: +691. 3SPI RE LEVEL 8 BASE

SPI RE LEVEL 7 BASET/ STEEL EL: +681. 7

T/ STEEL EL: +668. 9SPI RE LEVEL 6 BASE

SPI RE LEVEL 5 - MEZZA

T/ STEEL EL: +652. 9

T/ STEEL EL: +656. 1SPI RE LEVEL 5

T/ STEEL EL: +659. 3

T/ STEEL EL: +665. 7

SPI RE LEVEL 4 - MEZZA

SPI RE LEVEL 5 - MEZZA

T/ STEEL EL: +646. 4SPI RE LEVEL 4

22

23

1st Stationp

- 1st Station : L161

- 2nd Station: L99

3nos. Recovery Crane

W

LEVEL 160

LEVEL 159

LEVEL 158

T/ STEEL EL: +640. 0SPI RE LEVEL 3 - MEZZA

T/ STEEL EL: +627. 2

T/ STEEL EL: +633. 6

SPI RE LEVEL 2 - MEZZA

SPI RE LEVEL 2 - MEZZA

SPI RE LEVEL 2T/ STEEL EL: +617. 6

T/ STEEL EL: +620. 8

T/ STEEL EL: +614. 4

T/ SLAB EL: +608. 0

SPI RE LEVEL 1 - MEZZA

LEVEL 162 / SPI RE LEV

LEVEL 161T/ SLAB EL: +601. 9

SPI RE LEVEL 3

6

7

8

10

11

12

13

14

15

16

17

18

19

20

211st Station

R

y- Favco 242R, Ogawa OT4520, Favco SDD3/10

LEVEL 145

LEVEL 147

LEVEL 148

LEVEL 149

LEVEL 150

LEVEL 151

LEVEL 152

LEVEL 153

LEVEL 154

LEVEL 155

LEVEL 156

LEVEL 157

1

2

3

4

5

1

TOW

ER

LEVEL 130

LEVEL 135

LEVEL 143

LEVEL 145

LEVEL 140

LEVEL 141

LEVEL 142

BUR

J T

LEVEL 115

LEVEL 120

LEVEL 125

THE

B

LEVEL 99LEVEL 100

LEVEL 105

LEVEL 110

S6

4500

S5

4500

S4

4500

S3

4500

S2

4500

S1

2nd Station

Page 23: The Burj Tower

Cranage & HoistingCranage & Hoisting

SPI RE LEVEL 5 - MEZZANI NE1

T/ STEEL EL: +646. 4SPI RE LEVEL 4

T/ STEEL EL: +704. 9TOP OF SPI RE

T/ STEEL EL: +691. 3SPI RE LEVEL 8 BASE

SPI RE LEVEL 7 BASET/ STEEL EL: +681. 7

T/ STEEL EL: +668. 9SPI RE LEVEL 6 BASE

SPI RE LEVEL 5 - MEZZANI NE2

T/ STEEL EL: +652. 9

T/ STEEL EL: +656. 1SPI RE LEVEL 5

T/ STEEL EL: +659. 3

T/ STEEL EL: +665. 7

SPI RE LEVEL 4 - MEZZANI NE

T/ STEEL EL: +704.TOP OF SPI RE

W

LEVEL 159

LEVEL 158

LEVEL 160

T/ STEEL EL: +640. 0SPI RE LEVEL 3 - MEZZANI NE

T/ STEEL EL: +627. 2

T/ STEEL EL: +633. 6

SPI RE LEVEL 2 - MEZZANI NE1

SPI RE LEVEL 2 - MEZZANI NE2

SPI RE LEVEL 2T/ STEEL EL: +617. 6

T/ STEEL EL: +620. 8

T/ STEEL EL: +614. 4

T/ SLAB EL: +608. 0

SPI RE LEVEL 1 - MEZZANI NE

LEVEL 162 / SPI RE LEVEL 1

LEVEL 161T/ SLAB EL: +601. 9

SPI RE LEVEL 3

5

6

7

8

10Step 1 : Main T/C Dismantling

1) Main T/C Descending to L161

T/ STEEL EL: +691.SPI RE LEVEL 8 BAS

SPI RE LEVEL 7 BAST/ STEEL EL: +681.

T/ STEEL EL: +668.SPI RE LEVEL 6 BAS

SPI RE LEVEL 5 - MT/ STEEL EL: +665.

R

LEVEL 155

LEVEL 156

LEVEL 157

LEVEL 145

LEVEL 147

LEVEL 148

LEVEL 149

LEVEL 150

LEVEL 151

LEVEL 152

LEVEL 153

LEVEL 154

1

2

3

4

1

1) Main T/C Descending to L161

2) Main T/C Dismantled to L99 by Favco 242R

3) Dismantled Components moved to Ground by Ogawa OT4520

SPI RE LEVEL 5 - M

T/ STEEL EL: +640.

T/ STEEL EL: +646.SPI RE LEVEL 4

SPI RE LEVEL 3 - M

T/ STEEL EL: +633.SPI RE LEVEL 3

T/ STEEL EL: +652.

T/ STEEL EL: +656.SPI RE LEVEL 5

T/ STEEL EL: +659.

SPI RE LEVEL 4 - M

Favco

TOW

ER LEVEL 140

LEVEL 141

LEVEL 142

LEVEL 143

LEVEL 130

LEVEL 135

y g

W

LEVEL 160

T/ STEEL EL: +627.

SPI RE LEVEL 2 - M

SPI RE LEVEL 2 - M

SPI RE LEVEL 2T/ STEEL EL: +617.

T/ STEEL EL: +620.

T/ STEEL EL: +614.

T/ SLAB EL: +608. 0

SPI RE LEVEL 1 - M

LEVEL 162 / SPI RE

LEVEL 161T/ SLAB EL: +601. 9

10

Favco 242R

L161

BUR

J T

LEVEL 110

LEVEL 115

LEVEL 120

LEVEL 125

LEVEL 155

LEVEL 156

LEVEL 157

LEVEL 159

LEVEL 158

1

2

3

4

5

6

7

8

1

Main T/C

THE

B

LEVEL 99LEVEL 100

LEVEL 105

S6

4500

S5

4500

S4

4500

S3

4500

S2

4500

S1

LEVEL 154

Page 24: The Burj Tower

Cranage & HoistingCranage & HoistingT/ STEEL EL: +704. 9TOP OF SPI RE

T/ STEEL EL: +691. 3SPI RE LEVEL 8 BASE

SPI RE LEVEL 7 BASET/ STEEL EL: +681. 7

T/ STEEL EL: +668. 9SPI RE LEVEL 6 BASE

SPI RE LEVEL 5 - MEZZANI NE2

T/ STEEL EL: +652. 9

T/ STEEL EL: +656. 1SPI RE LEVEL 5

T/ STEEL EL: +659. 3

T/ STEEL EL: +665. 7

SPI RE LEVEL 4 - MEZZANI NE

SPI RE LEVEL 5 - MEZZANI NE1

T/ STEEL EL: +646. 4SPI RE LEVEL 4

1st Station T/ STEEL EL: +704. 9TOP OF SPI RE

LEVEL 159

LEVEL 158

LEVEL 160

T/ STEEL EL: +640. 0SPI RE LEVEL 3 - MEZZANI NE

T/ STEEL EL: +627. 2

T/ STEEL EL: +633. 6

SPI RE LEVEL 2 - MEZZANI NE1

SPI RE LEVEL 2 - MEZZANI NE2

SPI RE LEVEL 2T/ STEEL EL: +617. 6

T/ STEEL EL: +620. 8

T/ STEEL EL: +614. 4

T/ SLAB EL: +608. 0

SPI RE LEVEL 1 - MEZZANI NE

LEVEL 162 / SPI RE LEVEL 1

LEVEL 161T/ SLAB EL: +601. 9

SPI RE LEVEL 3

W

Step 2 : Favco 242R Dismantling

1) Favco SDD 3/10 Installed on L161

T/ STEEL EL: +691. 3SPI RE LEVEL 8 BASE

SPI RE LEVEL 7 BASET/ STEEL EL: +681. 7

T/ STEEL EL: +668. 9SPI RE LEVEL 6 BASE

SPI RE LEVEL 5 - MEZT/ STEEL EL: +665. 7

R

LEVEL 151

LEVEL 152

LEVEL 153

LEVEL 154

LEVEL 155

LEVEL 156

LEVEL 157

LEVEL 145

LEVEL 147

LEVEL 148

LEVEL 149

LEVEL 150

1) Favco SDD 3/10 Installed on L161

2) Favco 242R Dismantled to L99 by Favco SDD3/10

3) Dismantled Components moved to Ground

by Ogawa OT4520

T/ STEEL EL: +652. 9

T/ STEEL EL: +656. 1SPI RE LEVEL 5

T/ STEEL EL: +659. 3

SPI RE LEVEL 4 - MEZ

SPI RE LEVEL 5 - MEZ

T/ STEEL EL: +640. 0

T/ STEEL EL: +646. 4SPI RE LEVEL 4

SPI RE LEVEL 3 - MEZ

T/ STEEL EL: +633. 6SPI RE LEVEL 3

TOW

ER LEVEL 140

LEVEL 141

LEVEL 142

LEVEL 143

LEVEL 130

LEVEL 135

by Ogawa OT4520. T/ STEEL EL: +627. 2

SPI RE LEVEL 2 - MEZ

SPI RE LEVEL 2 - MEZ

SPI RE LEVEL 2T/ STEEL EL: +617. 6

T/ STEEL EL: +620. 8

T/ STEEL EL: +614. 4

T/ SLAB EL: +608. 0

SPI RE LEVEL 1 - MEZ

LEVEL 162 / SPI RE L

LEVEL 161T/ SLAB EL: +601. 9

WFavco 242R

Favco

L161

BUR

J T

LEVEL 110

LEVEL 115

LEVEL 120

LEVEL 125

Favco SDD3/10

THE

B

LEVEL 99LEVEL 100

LEVEL 105

S6

4500

S5

4500

S4

4500

S3

4500

S2

4500

S1

2nd Station

Page 25: The Burj Tower

Cranage & HoistingCranage & HoistingT/ STEEL EL: +704. 9TOP OF SPI RE

T/ STEEL EL: +691. 3SPI RE LEVEL 8 BASE

SPI RE LEVEL 7 BASET/ STEEL EL: +681. 7

T/ STEEL EL: +668. 9SPI RE LEVEL 6 BASE

SPI RE LEVEL 5 - MEZZANI NE2

T/ STEEL EL: +652. 9

T/ STEEL EL: +656. 1SPI RE LEVEL 5

T/ STEEL EL: +659. 3

T/ STEEL EL: +665. 7

SPI RE LEVEL 4 - MEZZANI NE

SPI RE LEVEL 5 - MEZZANI NE1

T/ STEEL EL: +646. 4SPI RE LEVEL 4

LEVEL 159

LEVEL 158

LEVEL 160

T/ STEEL EL: +640. 0SPI RE LEVEL 3 - MEZZANI NE

T/ STEEL EL: +627. 2

T/ STEEL EL: +633. 6

SPI RE LEVEL 2 - MEZZANI NE1

SPI RE LEVEL 2 - MEZZANI NE2

SPI RE LEVEL 2T/ STEEL EL: +617. 6

T/ STEEL EL: +620. 8

T/ STEEL EL: +614. 4

T/ SLAB EL: +608. 0

SPI RE LEVEL 1 - MEZZANI NE

LEVEL 162 / SPI RE LEVEL 1

LEVEL 161T/ SLAB EL: +601. 9

SPI RE LEVEL 3

W

Step 3 : Ogawa OT4520 Dismantling

1) Favco SDD 3/10 Re-installed on L99

R

LEVEL 151

LEVEL 152

LEVEL 153

LEVEL 154

LEVEL 155

LEVEL 156

LEVEL 157

LEVEL 145

LEVEL 147

LEVEL 148

LEVEL 149

LEVEL 150

1) Favco SDD 3/10 Re-installed on L99

2) Ogawa OT4520 Dismantled to Ground by Favco SDD3/10

TOW

ER

LEVEL 130

LEVEL 135

LEVEL 140

LEVEL 141

LEVEL 142

LEVEL 143

Step 4 : Favco SDD3/10 Dismantling

1) Favco SDD 3/10 Dismantled ManuallyVEL 105

Ogawa OT4520

BUR

J T

LEVEL 110

LEVEL 115

LEVEL 120

LEVEL 125

1) Favco SDD 3/10 Dismantled Manually

VEL 99VEL 100

S6

4500

S5

4500

S4

4500

S3

4500

S2

4500

S1

Favco

L99

THE

B

LEVEL 99LEVEL 100

LEVEL 105

S6

4500

S5

4500

S4

4500

S3

4500

S2

4500

S1

2nd StationSDD3/10

Page 26: The Burj Tower

Concrete PlacementConcrete PlacementConcrete Placement MethodConcrete Placement Method

Level Height Pouring Method Remarks

Ground ~ L145 531 m Direct Pumping Target Height (RC Structure)(RC Structure)

L146 ~ L160M 624 m Re-pumping Secondary Pump on L124 (East wing 442m)

L160M ~ Spire1 681.7 m Hopper by T/C From Ground Level

R

Level Pressure Output Engine Remarks

2 nos of Main

Pumping Area (Ground Level)

Pipe Lines

. Concrete Pump

TOW

ER

CPB#4

Pump#1~#3 185 / 320 bar 71 / 36 m3/hr 470 kw 2 nos. of Main1 no. of Stand by

Pump#4 220 / 260 bar 110 m3/hr 200 kw SecondaryPumping

C t Pl i B

BUR

J T

CPB#1 CPB#3

Pipe Lines

. Concrete Placing Boom

- 32m boom for Center Core- 3nos. of 28m boom for Wing Core

THE

B

CPB#2. Pipe Lines

- D150mm, THK 11mm- 5 Lines (1 for back up)

Page 27: The Burj Tower

Concrete PlacementConcrete PlacementPipe Line SchedulePipe Line Schedule

Line#1. (L160) for Center Core

Line#5 (L160) L160Mezzanine : Steel Structure

Top of Finial : Spire

Pinnacle

P #4

Line#5. (L160) for Back up

L154 : RC Structure

R

Line#4. (L112)for West Wing Line#2. (L139)

for South Wing

Line#3. (L124)for East Wing

Pump#4.(Secondary Pump on L124)

TOW

ERBU

RJ

T

Pumping Area

THE

B p gPump#1~#3

Page 28: The Burj Tower

Concrete PlacementConcrete PlacementRe-pumpingRe-pumping

Line#5 : Back up (~L154)Spire1

4500

W1

4500

E1

E2

4500

S1

S2

Line#5 : Back up ( L154)

Line#1 (~L154)

(682m)

Concrete HopperL160 S i 1 (58 )

R

4500

0

45004

CPB#1CPB#2

WS2WS1WWN1

L160 Mezzanine (624m)

: L160 ~ Spire1 (58m)

TOW

ER

L124Secondary

L160 Mezzanine (624m)

Secondary Pumping : L142 ~ L160M (182m)

Direct pumping Target Height : Ground ~ L145 (531m)

BUR

J T Secondary

Pumping Location

V ti l Li P iti

Line#2 (~L139)

L124 (442m)

THE

B : Vertical Line PositionSecondary Pump

Page 29: The Burj Tower

Survey & Monitoring

•Low Level Tower Control Classical Control Method

XYZ

R

XYZ

XYZ

TOW

ER

XYZ

BUR

J T

THE

B

Page 30: The Burj Tower

High Level Tower Control XYZ

Survey & Monitoring

XYZ

High Level Tower ControlGPS RTK

XYZ

XYZ

ANTENNAANTENNA

ANTENNA

RTO

WER

REFERENCE

BUR

J T STATION

THE

B

Page 31: The Burj Tower

Survey & MonitoringSurvey & MonitoringMonitoring Program Level 146Monitoring Program

. Main Control Room- Location ; B2 Level

Level 138

- Plan for Integrating Raft and Survey Monitoring

. Strain Gauge & Extensometer Level 92

Level 112Level 108

R

g- Total number ; 211EA (except Raft)- Location : Outrigger Floor Level

Middl Fl L l b t O t i Fl

Level 76Level 72

TOW

ER

: Middle Floor Level between Outrigger Floors: Level 5, 16, 19, 26, 39, 43, 58, 72, 76, 92,108, 112, 138, 146 (14 Floors)

Wi d S d/Di ti T t H iditLevel 43Level 39

Level 58

BUR

J T. Wind Speed/Direction, Temperature, Humidity

- Location ; Level 5, 43, 76, 112, 146(Tower Outside)

Level 19Level 16

Level 26

Level 39

THE

B

. Communication Control Module (CCM)- LAN/Network Interface

Level 5

Page 32: The Burj Tower

Spire ErectionR

TOW

ERBU

RJ

TTH

E B

Page 33: The Burj Tower

Spire ErectionSpire ErectionSpire Erection MethodSpire Erection Method

Support Beam & Lifting Equipment Installation

Lifting Block Installation & Assembling

R

Spire Assembly Lifting & Connection Block Erection

TOW

ER Temporary Spire Bottom Block Engaging

BUR

J T Completion of Lifting

Dismantling of Temporary Spire Bottom Block

THE

B

Page 34: The Burj Tower

Spire ErectionSpire ErectionR

TOW

ERBU

RJ

TTH

E B

Page 35: The Burj Tower

RTO

WER

BUR

J T

THE

B

Page 36: The Burj Tower

Th k !Th k !

R

Thank you !Thank you !

TOW

ERBU

RJ

TTH

E B

Page 37: The Burj Tower

RTO

WER

BUR

J T

THE

B

Page 38: The Burj Tower

RTO

WER

BUR

J T

THE

B

Page 39: The Burj Tower

Th k !Th k !