Upload
sanjiv
View
24
Download
0
Tags:
Embed Size (px)
DESCRIPTION
Introducing America’s First UV Cured Fiberglass CIPP. The Best Solution for CIPP American Made, American Support. Strength. Test Results 4MM 8” StreamlinerUV ™ Liner Flexural strength: 52,000 PSI 50 year flexural strength: 33,840 PSI (65% retention) Flexural modulus: 1,700,000 PSI - PowerPoint PPT Presentation
Citation preview
The Best Solution for CIPP
American Made, American Support
Introducing America’s FirstUV Cured Fiberglass CIPP
Test Results4MM 8” StreamlinerUV™ LinerFlexural strength: 52,000 PSI50 year flexural strength: 33,840 PSI (65% retention)
Flexural modulus: 1,700,000 PSI50 year flexural modulus: 1,160,240 PSI (68% retention)
3MM 8” StreamlinerUV™ LinerFlexural strength: 47,000 PSIFlexural modulus: 1,350,000 PSI
Water Tight: 100% leak proof*No Shrinkage: 0.0% loss*
Thin Wall: From 3mmCured: Ultra Violet Light
Curing Speed: 7.5ft per minute (8” )Laterals: No seals or grouting required
Flow: Hazen-Williams C=150
*2009 IKT Liner Report, (Institute for Underground Infrastructure)
Polyester outer containment and protection foil.
Chemical and temperature resistant 7 layer polyethylene/polyamine inner containment foil.
Multiple layers of high quality E-CR fiberglass. The fiberglass layers are saturated with polyester or vinyl ester resins during manufacturing.
Translucent UV resistant outer foil.
Clear inner foil is removed.
Outer foil remains in the pipe after curing.
Proprietary resin “jelling” maintains consistent wall thickness during storage, shipping and installation.
Line is bypassedLine is bypassed Upstream manhole is pluggedUpstream manhole is plugged
Line is cleaned and pre-videoedLine is cleaned and pre-videoed Rope pulled in during pre-videoRope pulled in during pre-video
Pre-liner pulled through the pipe Pre-liner pulled through the pipe with rope inserted from pre-videowith rope inserted from pre-video
Second rope is pulled through pipe Second rope is pulled through pipe with pre-liner.with pre-liner.
Liner is delivered to the job siteLiner is delivered to the job site Liner is pulled in place by a winchLiner is pulled in place by a winch
Safety sleeves are inserted on liner Safety sleeves are inserted on liner End caps are installed on each end of End caps are installed on each end of
the linerthe liner
Liner is inflated and calibrated at 8psi Light Train is inserted and pressure is Light Train is inserted and pressure is
restoredrestored
Light Train Camera is activatedLight Train Camera is activated Light Train is manually pulled and Light Train is manually pulled and
uncured liner is video inspecteduncured liner is video inspected
Any installation issues are resolved and video is archived.
Light Train UV lamps are activatedLight Train UV lamps are activated Light Train is pulled via computer control Light Train is pulled via computer control
through the liner.through the liner.
Speed, temperature and pressure are monitored throughout the curing process.
* D2990 test results StreamLiner UV* *Insituform
*2009 IKT Liner Report, (Institute for Underground Infrastructure)
100% water tight* 63% water tight *
0.0% ≤5%
8” 3MM Liner0% Shrinkage
Loss of I.D.
5.8%
8” 6MM Liner3% Shrinkage
Loss of I.D.
15.8%
Flexural Mod 448K PSIFlexural Strength of 9300 PSINo pre-cure videosThicker wall and reduced flow
Liner shown to shrinkLiner shown to leakMust seal lateral connectionsMust deal with odor and styrene
No ShrinkageNo leakingNo Lateral Seals neededNo odor or curing by-products
Flexural Mod of 1.7M PSIFlexural Strength 52K PSIMultiple curing videosThinner liner and greater flow
Review the Streamliner UV specification doc
Recommend UV fiberglass as an approved material