The Approach and Current Situation of The Geothermal Development in Beppu City
20 Nov, 2017
Beppu City Office, Oita Pref.
1 The Volcanic Front of the Japanese Archipelago
:Quaternary Volcanos
:The Volcanic Front
Source:JAEA
Kyushu Region
The Volcanic Distribution Mapof the Japanese Archipelago
4-5cm/year
8-9cm/year
2 About Beppu City
Ave. Temperature in City・・・Approx. 16℃
Ave. Rainfall in City・・・Approx.1800mm
Beppu City
RegionWorkers(Companies)
Ratio of the tertiary Industry
Beppu City 89.9%
Oita Pref. 75.1%
Ave. in Japan 73.5%
Population Aging Rate:31.3%(2015)
Source:METI, etc..
Area:125.34km2
Population:118,673
(61,993 Households)
As of Aug, 2017
Populations and Households
1975-2015
Populations
Households
【source:Yusa(2008)】
3 Features of Beppu Hot Spring Villages ①
Source:Japan SPA Association 2012
Operating wellheads in Beppu City
Years
Wellheads
Wellheads
Pumped Up Wellheads
Artesian Wellheads
3230034081
3690444486
83058
0 20000 40000 60000 80000 100000
Total yields(ℓ/min)
Beppu HS Vil. Yufuin Okuhida HS Vil.
Ito Kusatsu
452522
649879
2217
0 500 1000 1500 2000 2500
The number of wellheads
Beppu HS Vil. Yufuin Ito Atami HS Vil. Ibusuki
Beppu Onsen temperature distribution map in 100m below seal evel. (℃)
●:Former Yield Spot →:Hot water movement direction―:Isotherm in 100m below sea levelN :Buried Fault(estimated)
Source:Yusa(2003)
*Formation of Beppu hot spring:50K years*History of Beppu Onsen:Back to 8 Century*Source of Onsen is rain water.*Subsurface rain water turn over every 50 years.* The resources of the onsen is hot water type of the chloride spring places under the Tsurumi volcanic group. (Temp.: 250~300℃、Cl:1400~1600ppm)
3 Features of Beppu Hot Spring(Onsen) Villages ②
■The place of the hot spring origin in Japan!
-In 1919, drilling for the geothermal(113℃) utilization succeeded in Beppu City.
-In 1925, First geothermal generation(1.3kW) started in Japan.
■Local people opposed to the geothermal development in the past!
-In 1981, the opposition movement by Beppu local people let Idemitsu withdrew the application which had applied drilling plans for the geothermal power plant to Oita Pref..
4 Beppu City relations to the Geothermal Development
Source: Oita News in1981
5 The approach to The New Energy(Geothermal Energy)
• Feb: Completed the “Beppu City Hot Spring Energy Project Possibility Investigation Study Project”.
2017
• Mar: Enacted the “Ordinance for coexistence with the community of Beppu city hot spring power generation”.
2016
• Jan: The price cuts for water supply to the geothermal plants.
• Mar: Established the “BeppuCity Local New Energy Vision”.
2015
• Feb: Completed the FS for the “Beppu City Local New Energy Vision”.
• Sep: Enacted the “Act Regarding Preliminary Procedures of Local New Energy Installation of Beppu City”.
2014
地熱発
電, 631,307
温度差利用, 2,452,025
太陽光発電・
熱利用, 447,683
風力発電, 304,641
バイオマス発電・熱
利用,21,640
利用可能量(GJ/年)
Type of Energy
Available amount
Heat Conversion(GJ/year)
Geothermal binary power 631,307
Hot spring (66,257)
Geothermal heat utilization
Hot Spring 922,861
Heat pump 1,529,164
Solar power 447,683
Solar heat (488,011)
Wind power 304,641Hydropower(Small and Mid.) -
BiomassPower 21,640
Heat Utilization (76,727)Total(except Hot spring power, Solar heat, Biomass heat utilization)
3,857,295
<Characteristic in Beppu City for the new energy>
▶Geothermal related: 80%
▶Solar : 12%
Wind : 8%
6 The FS for “the Beppu City Local New Energy Vision”(2014)
Geothermal binary power, etc.
Geothermal heat utilization, etc.
Solar power, etc.
Wind powerBiomass
Available amount(GJ/year)
Setting “Geothermal power water supply” as purpose of water
supply (Corporate with the Waterworks Bureau of Beppu City)
・Utilizing the tap water to the geothermal binary power: As cooling water
・Lead to the benefit of waterworks.
・The above mentioned benefits applies to the price of water in the area:
Return to the local.
Purpose of water supply
Basic charge Excessive charge
Amount Charge Excessed Amount Charge/t
Normal ~8t 997yen
8t~20t 156yen
20t~100t 194yen
100t~ 244yen
Vessel 488yen/t
Geothermal 152円yen/t
7 New supports for the geothermal development(2015)
Basic Objective 1: Installation of new energy attuned with the environment⇒ The approaches focused on harmonizing with the environment.
Basic Objective 2: Contribution to the tourism industry⇒ Revitalizing onsen / tourism industry.
Basic Objective 3: Installation of local reduction type new energy⇒ Revitalizing community by returning the merits.
Basic Objective 4: Secure energy in times of disaster⇒ Striving for a community with strong resistance against disasters.
■ Policy for the geothermal power
-Promote only exist wellheads and projects with no effects to the surroundingenvironment not aggressive promoting for large size geothermal (binary) powerplants necessary for new wells.
-Promote mainly for the small size geothermal binary power plants with utilizingexisting wellheads.
8 The “Beppu City Local New Energy Vision”(2015)
Basic Guidelines Regarding the Installation of New Energy
Target Numbers Measures Answer ratio
Citizens 2,000Choose random from over 20 years old living in Beppu city
30.4%
Companies 200Choose from different industrial type based on ration of the number of offices.
46.7%
Onsen and hotelowners
20 Onsen and hotel owners who have wellheads. 55.0%
1 Research purpose
Grasping the concern in the new energy, intension, opinion to the City’s approaches and etc.
through the survey.
【⇒ Study resource for the New Energy Vision(2015)】
2 Survey period
8th ~ 29th Aug, 2014
3 Target
9 Citizens' awareness survey on the new energy
10 The result of citizens' awareness survey on thenew energy ①
9.1
27.3
54.5
63.6
72.7
37.6
20.4
59.1
51.6
46.2
28.4
29.6
58.1
57.2
57.9
0 10 20 30 40 50 60 70 80
設置を抑制する地域を設ける
設置工事中や稼働中に職員に立ち入り検査をさせ
る
新エネルギーの設備設置に関する条件を設ける
設備設置事業者に対して、事前に周辺住民等へ
の説明会の開催を要請する
騒音や地下水位の低下などの環境負荷が懸念さ
れる場合には事業者に状況把握及び結果公表…
市民 事業者 温泉旅館
Q1) What approaches city shall be taken in order to solve environmental burden with installing new energy?
%
10 The result of citizens‘ awareness survey on thenew energy ②
45.5
45.5
36.4
63.6
31.2
34.4
47.3
48.4
23
39.5
54.7
30
0 10 20 30 40 50 60 70
温泉エネルギー利用に関する市の相談窓口を設
ける
温泉エネルギー設備を実際に体験できる場を設
け、観光スポットとして活用する
市営温泉施設に設備を導入し効果や課題等を情
報発信する
温泉エネルギーに対する補助制度を創設する
市民 事業者 温泉旅館
Q2) What approaches citizens require to the city for the utilizing onsen energy?
%
【The reason for enacting】1)The requests increased for development of new energy system from in/outside of the City Office.
2)Arising the geothermal developers with slight awareness to the regulations and laws.3)More importance of mutual understanding between new energy developers and local peoples.
11 Act Regarding Preliminary Procedures of Local New Energy Installation of Beppu City(2014) and Ordinance
【Occur another issues】1)Rushing large size equity entry2)Affect to the environment3)Worsen the local emotion
4)Over utilization of hot water?5)Over yielding of springs?
Act Regarding Preliminary Procedures of Local New Energy Installation
Some limitations for guidance.
【View of City Office】-In regard to the installing the geothermal facilities, it is necessary for utilizing sustainably and orderly with proper guidance and supervision by administration sector in terms of hot spring and living environment protection, promoting local understanding, and local contribution.
Establishing the strict ordinance in order to promote installation of geothermal power orderly.
12 Ordinance for coexistence with the community ofBeppu city hot spring power generation(2016)
1.PurposeCo-existance with communities and proper
utilization of hot spring resource.
2.DefinitionOver 7500kW is objected.
3.Obligation of the city and developersSpecify owner of the facility.
4.Prior consultationBriefing to the local peoples, etc..
5.Regulations for the environmentHot spring monitoring, etc..
6.OtherNotification of the counter measure to the
accident, etc..
9.Avoidance area Area limitation and set development
conditions etc..
8.Establishing the councilEvaluate the result of survey and
discuss the issue.
10.Individual deliberationOpinion for hot spring drilling
etc..
2017~
■ Essential of the ordinance
7.Recommend improvement, PublicationPublication to internet and notice to relevant agencies.
13 Procedure based on the Ordinance
Briefing to the locals
Prior consultation
ConstructionReport of
prior consultation
Indicate prior
consultation
Notification of
construction
Completion acceptance of
prior consultation
Monitoring
Report of monitoring and
survey
Complete all procedure based
on regulations
Environment assessment
Notification of
completion
Local confirmation
Completion report of
regulations
Check the completion
Jurisdiction agencies
14 Prior survey for the environment
■Impact study for environment・ Noise, pollutions, and etc..
・ Water intake, drainage, etc..
・ Fumaroles pollutions, hot spring and resources.・ Counter measures to natural disasters.
Procedure based on the laws and regulations
Submit papers to relevant agencies.
Briefing to the local people about scenic landscape measures.
■Safety investigation for pressured tankfor hot water and separator
・ Confirm warrant・ Local confirmation
■Hot spring monitoring survey・ Drilling new well.・ Existing wellheads within 150m.
15 Reasons of expansion of hot spring power generationin Beppu
Environment condition
*High temp. hot spring
in shallow area.
*A number of private own wells.
*Large number of untouched hot spring.
*Located out of national park.
* Accumulated knowledge for utilizing hot springs.
Trend in the society
*Focus on renewable energy(Baseload power, CO2 emission)
*Large income by FIT(Feed in Tariff)
*Shift from solar power
*Shift to utilizing idle land
Policy changes
*Deregulations of relevant regulations
*Expanding subsidized projects(METI, MOE)
*Power liberalization
16 Changing in the equipment accreditation
Source: Asahi News 2016.07.23
7861491
4321
5741
6
17
36
47
0
5
10
15
20
25
30
35
40
45
50
0
1000
2000
3000
4000
5000
6000
7000
2014.3 2015.3 2016.3 2017.3
件KWThe equipment accreditation in
Beppu
Equipment capacity Approved equipment
Beppu city
▲Tsurumi dake 1,375m
▲Garan dake1,045m
Asamigawafault
Hotta fault
Kannawa fault
17 Installed situation of hot spring power generationetc. As of March, 2017
:Under operation(15) :Planned(46)
大分合同新聞記事(2015.9.16)抜粋
18 Assertion of the effect to the living environment
●Issue caused by the geothermal development.・Lack of procedure based on the laws andregulations.
・Lack of briefing to local people・Lack of well maintenance
(Fumaroles pollutions, Noise, Drainage, etc.)・Lack of ownership sense
Local opposition
Definitions Contents Measures
Activefumaroles
boiling spring
Situation of heat source
Depth and Caliber
Temperature Main wellheads
Calorific value Calculate from steam table
pH Main wellheads
Chloride Ion Main wellheads(Cl-)
1) Survey target
2)Survey contents
Survey 103 active fumaroles boiling spring where is over 200m from sea level and close to two heat source(Garan-dake, Tsurumi-dake) in Beppu city.
3)Survey Result Publication the survey result through City office HP
19 Beppu City Hot Spring Energy Project PossibilityInvestigation Study Project(2017)
20 Beppu hot spring power generation, such as measuresCouncil (2017)
Council members Affiliation
会長 由佐 悠紀 京都大学名誉教授
副会長 渡邊 秀一別府商工会議所専務理事
竹村 恵二京都大学大学院地球熱学研究施設教授
阿部 博光別府大学国際経営学部教授
李 燕APU大学院アジア太平洋研究科教授
徳田 宣子 徳田法律事務所
西田 陽一別府市旅館ホテル組合連合会会長
石原 正統大分県産業科学技術センター参事監兼次長
Beppu City Local New Energy Vision
Promotion Committee for Beppu City Local New Energy Vision
Act Regarding Preliminary Procedures of Local New Energy Installation of BeppuCity
Beppu hot spring power generation, such as measures Council
Ordinance for coexistence with the community of Beppu city hot spring power generation
03,2015
05,2016~
04,2017~
10, 2013~
09, 2014~
21 Result of the survey by Beppu hot spring powergeneration, such as measures Council
◇Decreased calorific valuein 62%, 28 over 45, of hot spring sources.
◇Decline chloride ion concentration of hot spring sources might be caused by weaken of heat and material supply or stronger ground water supply during the process of heat supply.
Stabilization of hot spring
resource
Decay of hot spring resource
◇Comparison of the survey data (30 years ago)(Temperature and drilling depth)
Drilling Depth
Temperature
22 Schedule of the geothermal energy
2014FY 2015FY 2016FY 2017FY 2018FY 2019FY 2020FY
Planning
Promotion
Regulationdesignig
BeppuCity Local
New Energy Vision
Revising Environmental
Basic Plan
Revising Global
warming measures
execution plan
Global warming measures execution plan【Contain New Energy Vison】・Introduction Plan for the NewEnergy Plan
・Approach to promote the NewEnergy Plan
New energy introduction project①Hot spring pow generation
introduction project→Introduction Feasibility Map
New energy introduction project②Hot spring heat utilization
introduction project→Install to city owned hot spring
facilities
FS for hot spring power generation
Ordinance for coexistence with the community of Beppu city hot spring power generation
Revising Ordinance for coexistence with the community of Beppu city hot spring power generation
Thank you for your attention