No 1DECOM NORTH SEA – 29 NOVEMBER 17

THE ABLE GROUP

Page 2: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 2DECOM NORTH SEA – 29 NOVEMBER 17

WELCOME

Neil EtheringtonBusiness Development Director

PREPARATION IS THE QUAY!SHELL BRENT DELTA THE STORY SO FAR….

Page 3: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 3DECOM NORTH SEA – 29 NOVEMBER 17

DECOMMISSIONING PROJECT

SHELL BRENT

Page 4: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 4DECOM NORTH SEA – 29 NOVEMBER 17

SHELL BRENT DELTA MOORED AT ASP QUAY 6

Page 5: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 5DECOM NORTH SEA – 29 NOVEMBER 17

THE GROUP

ABLE INTRODUCTION

Page 6: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 6DECOM NORTH SEA – 29 NOVEMBER 17

THE ABLE GROUP TODAY

• Established 1966

• Privately owned

• Entrepreneurial

• Decisive

• Flexible

• Strong leadership

• Long term view

Ernst & Young Entrepreneur of the Year (Peter Stephenson, Able UK Ltd Executive Chairman) 2010

Long term strategy

Extensive funding ; No borrowings

£120m+ invested in last 5 years

£483M

asset base

Page 7: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 7DECOM NORTH SEA – 29 NOVEMBER 17

ABLE – A DIVERSIFIED GROUP

ABLE Group• Port Development

• Construction – civil and marine

• Demolition

• Marine Recycling / Decommissioning

• Property / Management – UK land bank c. 2,150ha (5,320 acres)

• Land Reclamation

• Landfill

• Waste Management

• Quarrying

Page 8: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 8DECOM NORTH SEA – 29 NOVEMBER 17

ABLE UK LIMITED – HISTORY AND DEVELOPMENT

An evolving process:

From Plant Hire to Demolition

to Waste Management to Construction

and on to Marine Decommissioning and Property Management and Development

Page 9: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 9DECOM NORTH SEA – 29 NOVEMBER 17

THORPE MARSH POWER STATION

• Acquired 1995

• Power Station Demolition Contract

• Site cleared

• Section 36 Approval (to 2021)

• 1,575MW Gas Power Station

• Carlton Power

• Cooling Towers – 2012

• Construction 2018/19

Page 10: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 10DECOM NORTH SEA – 29 NOVEMBER 17

ABLE HAS CONTINUED TO PIONEER NEW TECHNIQUES

AND SET INDUSTRY STANDARDS

DEMOLITION

Page 11: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 11DECOM NORTH SEA – 29 NOVEMBER 17

DEMOLITION TRACK RECORD

Demolished / Dismantled Projects

Power Stations 12

Refineries 11

Tank Farms 13

Bridges 50

Buildings 770 +

Structures using explosives

80 +

Tonnes Equipment 80,000 +

Page 12: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 12DECOM NORTH SEA – 29 NOVEMBER 17

MAJOR DEMOLITION CLIENTS INCLUDE:

• AMOCO

• BASF

• BHP Hamilton

• BP Chemicals

• BP Oil & Gas

• British Gas

• British Nuclear Fuels

• British Steel

• ConocoPhillips

• Ensco• EON• ICI• Innogy plc• Mobil /Exxon• NAM-Holland

• Newfield Petroleum• Nuclear Electric plc• Petrofac

• Phillips Petroleum - UK

• Phillips Petroleum - Norway

• Powergen

• RWE

• Sembcorp

• Shell UK

• Shell Exploration & Production

• Thames Water

• TotalFinaElf Norway

• TotalFinaElf UK

• UECC

• UK Atomic Energy Authority

Page 13: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 13DECOM NORTH SEA – 29 NOVEMBER 17

OIL RIG DECOMMISSIONING

From onshore......to Offshore, onshore...........Oil Platform Decommissioning............

Former Northern Offshore Federation Company of the Year

Page 14: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 14DECOM NORTH SEA – 29 NOVEMBER 17

Oil Platforms Year

Phillips Albusk Jell 1985

Shell Bravo 1994

Shell Dunlin 1994

Shell Cormorant A 1995

Shell Charlie 1996

Shell Leman Topsides 1996

BHP Esmond 1996

Shell Delta 1997

Shell Leman Jacket 1997

NAM K11 1998/9

TFE Frigg/Frǿy 2000/1

NAM K14 2001/2

Mobil Camelot CB 2002/3

Grove Platform 2004

BP North West Hutton 2008/9

ConocoPhillips Phoenix Module 2016

Shell Brent Delta Topside 2017

Shell Brent Bravo Topside 2019

Shell Brent Alpha Topside 2020

Shell Brent Alpha Jacket 2021

Shell Brent Charlie Topside 2022

TRACK RECORD….THE MARKET LEADER

• Over 80 structures received

• Undertaken at Able Seaton Port (initially) at Able Billingham Reach

Page 15: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 15DECOM NORTH SEA – 29 NOVEMBER 17

BP NORTH WEST HUTTON – TOPSIDE AND JACKET REMOVAL

Page 16: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 16DECOM NORTH SEA – 29 NOVEMBER 17

BP NORTH WEST HUTTON

• One of the largest projects to date

• 20,000t Topside

• 10,000t Jacket

• Reverse engineering

Page 17: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 17DECOM NORTH SEA – 29 NOVEMBER 17

BP NORTH WEST HUTTON – REVERSE ENGINEERING

• Heerema

• Multiple barge movements - 22

• Two summer campaigns 2008/9

• Innovative re-use

Page 18: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 18DECOM NORTH SEA – 29 NOVEMBER 17

MODULE SUPPORT FRAME (1,500T)

ADAPTED AND USED IN SEA TRIALS – PIONEERING SPIRIT

Page 19: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 19DECOM NORTH SEA – 29 NOVEMBER 17

MOBILE ACCOMODATION UNIT (MAU)

• 3,116m2 of office and welfare accommodation• Top 2 floors available for office or overnight

accommodation

Green Apple

Award Winner

2013

Page 20: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 20DECOM NORTH SEA – 29 NOVEMBER 17

MAU – ACCOMMODATION

3,116m2 of Office and Welfare Accommodation Kitchen for 120 staff

Page 21: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 21DECOM NORTH SEA – 29 NOVEMBER 17

THE DEMOLITION PROCESS

• Survey (compare to plans)• Remove Hazardous Material• Soft Strip• Re-use; Re-furbish; Re-sale; Recycle

(the Best Practicable Environmental Option)• Sectioned Pull-down• Transfer to Scrap Handling Area• Scrap Steel Processing• Furnace Ready (sized)• Despatch – Road; Rail; Sea

Page 22: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 22DECOM NORTH SEA – 29 NOVEMBER 17

THE RESULT

• BP NWH - Largest Oil Rig Re-cycling Project at the time

• On-Time

• On Budget

• LSA Removal

• Asbestos Removal

• 98.2% re-used/re-cycled

• No Lost Time Accidents

• A Satisfied Client

Page 23: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 23DECOM NORTH SEA – 29 NOVEMBER 17

UK’s LARGEST OFFSHORE DECOMMISSIONING PROJECT

SHELL BRENT

Page 24: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 24DECOM NORTH SEA – 29 NOVEMBER 17

SHELL BRENT

• 1976

• 4 billion barrels of oil

• 10% of all North Sea output

• 70% of all revenues paid as TAX

Source: SHELL UK

Page 25: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 25DECOM NORTH SEA – 29 NOVEMBER 17

A COMPLEX MAJOR ENGINEERING PROJECT

Cessation of Production

• Delta 2011

• Alpha, Bravo 2014

• Charlie TBC

Alpha, Bravo & Charlie have multiple interconnections & interdependencies

• 140 wells• 4 topsides (106kT)• 1 steel jacket• 3 GBS• 2 subsea locations

Page 26: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 26DECOM NORTH SEA – 29 NOVEMBER 17

THE SCALE OF THE BRENT FACILITIES

400 m

300 m

200 m

100 m

Nelson’s ColumnLondon

Sydney Opera House

Sydney

Taj MahalAgra

Seoul TowerSeoul

Eiffel TowerParis

BrentDelta

London EyeLondon

Page 27: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 27DECOM NORTH SEA – 29 NOVEMBER 17

PIONEERING SPIRIT

• 382m x 124m

• Single Lifts

• Up to 48,000t

• £2.5b

• World’s Largest Vessel

6x747 Jumbo Jets

LENGTH: 382m

Page 28: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 28DECOM NORTH SEA – 29 NOVEMBER 17

IRON LADY

• BARGE

• 2014

• 200m x 57m

Page 29: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 29DECOM NORTH SEA – 29 NOVEMBER 17

PIONEERING SPIRIT LIFT AND TRANSFER TO BARGE

Page 30: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 30DECOM NORTH SEA – 29 NOVEMBER 17

RIVER TEES, NORTH EAST COAST, UK

ABLE SEATON PORT (ASP)

Page 31: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 31DECOM NORTH SEA – 29 NOVEMBER 17

THE IDEAL EAST COAST LOCATION

NORTHERN NORTH SEA

CENTRAL NORTH SEA

SOUTHERN NORTH SEA

ABLE Seaton Port

100nm 200nm 400nm

Page 32: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 32DECOM NORTH SEA – 29 NOVEMBER 17

ABLE SEATON PORT - SHELL BRENT FIELD

• Shell Brent Field c. 400 Nautical Miles from ASP

Page 33: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 33DECOM NORTH SEA – 29 NOVEMBER 17

HISTORY – SINCE ABLE OWNERSHIP

1996 2004 2008 2009 2017

Site and QuaysDock Basin

c. £70m+ invested

Page 34: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 34DECOM NORTH SEA – 29 NOVEMBER 17

ASP BASE PLAN

• Multi-user Facility

• 51 hectares (126 acres)

• 11 Quays

• Up to 20.5m of water @ MHWS

• Offices

• Workshops

• Fabrication Hall

• Stores

• Shot blast building

• Paint shop

• Extensive range of capital plant

• New Quays

• Quay 1

• Quay 6

• Potential Dry Dock

Dock Ramp

200m - 1:15

(6.6%)

Security Office

216m

386m

172m

150m

E5

E3

E2

E1

W1

E6

E8

2.83ha

Holding Basin -6.0m CD

(-9.5m CD Design Depth)

Dredge Box -11.0m CD

(-15.0m CD Design Depth)

Quay 11

Quay 10

E7

Carparking (3x 20No. bays)

Contractors compound

Quay 11b

E5

E4

E3

E2

E6

E8

Dredge Box -11.0m CD

(-15.0m CD Design Depth)

Quay 11

Dock Basin

(Dock Floor 9.5ha

-6.65m CD) Quay 10

Seaton Channel -6.0m CD

(-9.5m CD Design Depth)

East A

ccess R

oad

Car Park

E1

2.83ha

Proposed East Access Road

Proposed East Access Road

W1

Pro

posed W

est A

cce

ss R

oad

Proposed West A

ccess Road

Import Q

uay (Q

uay 1

)

Quay 9

Quay 6

Quay 7

Quay 8

Dock Basin

(Dock Floor 2.54ha

-8.50m CD)

Project:

Client:

Drawing Title:

Scale:

Drawing No: Revision:

Drawn By Checked By Approved By

Date:

PRELIMINARY

Comments Drn Chk AppDateRev.

A 29/06/16 Preliminary Issue KJH NE PMS

Key & Notes

ABLE Seaton Port

ABLE UK Limited

Base Plan

K Horn

29/06/2016

NTS@A3

ASP-001-00002 B

N Etherington

29/06/2016

P Stevenson

29/06/2016

N

Estate Boundary - 51ha

Heavy Load out Pad

Quay 10 - 65t/m²

Concrete Quay 6 - 60t/m²

Concrete Quay Pad

Quays 10 & 11 - 40t/m²

Concrete Pad

Concrete Quay

Quays 1 - 16t/m²

Hard Standing

10t/m² (50t/m² Patch Loading)

Dry/wet Dock

10t/m² (50t/m² Patch Loading)

Building Details:

E1 - Workshop: 14m x 34m 6m 476m²

E2 - Workshop: 76m x 26m x 11m 1,976m²

E3 - Workshop/Stores:

76m x 26m x 11m 1,976m²

E4 - Fabrication Shop

2 x 30t Overhead Cranes:

64m x 28m x 21.4m 1,792m²

E5 - Workshop: 40m x 25m x 11m 1,000m²

E6 - Workshop: 40m x 25m x 11m 1,000m²

E7 - Mobile Accommodation Unit 3,136m²

E8 - Waste Storage 575m²

W1 - Workshop: 41.5m x 20m x 6m 830m²

Quay 6 Pad 122m x 60m (101t/m

Line Loading)

Stone Blanket

Quays 10 & 11 - 40t/m²

Heavy Load out Pad

Quay 1 - 40t/m²

ABLE UK Limited

ABLE House

Billingham Reach Industrial Estate

Teesside, TS23 1PX

United Kingdom

Tel: +44(0)1642 806080

Fax: +44(0)1642 655655

DRAFT

Concrete Quay

Quay 9 5t/m²

Quay Details:

Q1 80m long to -9.50mCD

Q6 130m long to -6.65mCD

Q7 156m long to -6.65mCD

Q8 156m long to -6.65mCD

Q9 50m long to -6.65mCD

Q10 146m long to -15.00mCD

Q11 146m long to -15.00mCD

B Dock basin and quay lengths amended KJH

11/01/2017 11:46:49

Quay6

Page 35: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 35DECOM NORTH SEA – 29 NOVEMBER 17

QUAY 6 CONSTRUCTION

• 1,242 Piles (10,500t)

• 7,000m3 Concrete

• 7,500m2

• Load Capacity 45t/m2

• Line Load 100t/m2

• 120m Quay

• Start – Jan 14

• Finish – Dec 16

• Able Designed

Page 36: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 36DECOM NORTH SEA – 29 NOVEMBER 17

QUAY 6 CONSTRUCTION

Page 37: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 37DECOM NORTH SEA – 29 NOVEMBER 17

QUAY 6

123.97

17.21

105

105

17.21

30.36 30.36

1515

1515

1515

15

17.7130.3630.3622.7722.77

+

4.39mAOD

(7.24CD)

4.83mAOD

(7.68CD)

+

5.0mAOD

(7.85CD) +

5.0mAOD

(7.85CD)

+

4.83mAOD

(7.68CD)

+1:200

1:200

1:200

+

4.39mAOD

(7.24CD)

1:200

1:200

60.72

45.54

ABLE UK Limited

ABLE House

Billingham Reach Industrial Estate

Teesside, TS23 1PX

United Kingdom

Tel: +44(0)1642 806080

Fax: +44(0)1642 655655

Project:

Client:

Drawing Title:

Scale:

Drawing No: Revision:

Drawn By Checked By Approved By

Date:

PRELIMINARY

Comments Drn Chk AppDateRev.

A 31/07/13 Preliminary Issue JMH

Key & Notes

ABLE Seaton Port Quay 6

ABLE UK Limited

Quay 6 Masterplan Without Levels

J Horsman

31/07/13

1:500 UNO @A3

ASP-001-00071 A

1. All levels are in metres above

Ordnance Datum (mAOD) unless

noted otherwise.

2. All dimensions are in metres

(m)unless noted otherwise.

Quay 6

Front row piles. 1270mm OD at

2.53m centres

• Available Q1 2017

• 125m

• c60m @ 45t/m2

• c60m @ 16t/m2

Page 38: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 38DECOM NORTH SEA – 29 NOVEMBER 17

QUAY 6 GROUNDING BED CONSTRUCTION

• Area - 13,860m2 (70 tennis courts)

• 16,150t of stone

• 3,000t of gravel

Page 39: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 39DECOM NORTH SEA – 29 NOVEMBER 17

ASP: DECEMBER 2016

Page 40: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 40DECOM NORTH SEA – 29 NOVEMBER 17

ASP COFFERDAM REMOVAL

• 226 sheet piles average 20m long (4,500 linear metres combined)

• 84 tubular piles average 27.1 metres long (2,250 linear metres combined)

• 14,197m3 material (sand) extracted from cofferdam centre

Page 41: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 41DECOM NORTH SEA – 29 NOVEMBER 17

QUAY 6 COMPLETION

Page 42: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 42DECOM NORTH SEA – 29 NOVEMBER 17

• ABLE construction complete

• ASP capacity to process c. 300,000t steel per year

• The market is set to increase significantly

ASP QUAY 6 DOCK – WET DOCK BASIN

Page 43: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 43DECOM NORTH SEA – 29 NOVEMBER 17

BRENT DELTA (24,200t) TOPSIDE ARRIVAL PLAN

Page 44: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 44DECOM NORTH SEA – 29 NOVEMBER 17

TIMELAPSE OF SHELL BRENT DELTA DELIVERY TO ASP

Page 45: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 45DECOM NORTH SEA – 29 NOVEMBER 17

TIMELAPSE OF SHELL BRENT DELTA SKID-IN TO ASP QUAY 6

Page 46: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 46DECOM NORTH SEA – 29 NOVEMBER 17

UK’s LARGEST OFFSHORE DECOMMISSIONING PROJECT

SHELL BRENT DISPOSAL

Page 47: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 47DECOM NORTH SEA – 29 NOVEMBER 17

BRENT DELTA (24,200t) LOAD-IN DISPOSAL PLAN

• Survey

• Soft Strip

• Asbestos Removal

• Demolition

Completion within 12 months

Page 48: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 48DECOM NORTH SEA – 29 NOVEMBER 17

BRENT DELTA (24,200t) TOPSIDE DISPOSAL PLAN

Page 49: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 49DECOM NORTH SEA – 29 NOVEMBER 17

BRENT DELTA DISMANTLING PROCESS

Page 50: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 50DECOM NORTH SEA – 29 NOVEMBER 17

SHELL BRENT DELTA RE-CYCLING

• Contract target > 97.0% re-used/re-cycled

• Steel

• Non-ferrous

• Opportunities for re-use/re-furbishment

• Examples:• Flare Towers: Signage

• Re-used tubes as piles

• Helidecks: RoRo pontoon and ramp; bridges (drainage)

• Switchgear; valves

• Drill Derrick (training company)

• Charitable: 1.5t of food: mattresses etc

Page 51: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 51DECOM NORTH SEA – 29 NOVEMBER 17

WASTE MANAGEMENT

• c. 1.7%

• Comprises:– 1.5% Non-hazardous

– 0.2% Hazardous• Chemical (production & drilling) 0.016%

• LSA 0.057%

• Diesel 0.031%

• Hydraulic Oil 0.011%

• Crude Oil 0.050%

• Water (biocide) 0.013%

• PCB 0.001%

• Mercury 0.001%

Page 52: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 52DECOM NORTH SEA – 29 NOVEMBER 17

SEATON MEADOWS LANDFILL

• 600m by road

• Specialist Waste Facility

• Fully licensed

• Estimated life to 2030

Page 53: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 53DECOM NORTH SEA – 29 NOVEMBER 17

CONTRACT CONTRIBUTION (JOBS)

• 50 jobs new/safeguarded

• 3 New Apprenticeships (Hartlepool College):– Engineering Maintenance (Level 3 Diploma)

– Engineering Technical Support (CAD) (Level 3 Diploma)

– Welding (Level 3 Diploma)

Page 54: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 54DECOM NORTH SEA – 29 NOVEMBER 17

CONTRACT CONTRIBUTION

• SEATON CAREW MASTERPLAN £100,000– Outdoor Play area

• SHELL BRENT DELTA EVENTS– VIP EVENT (Tuesday) 90+ (MPs; Mayor; OGA; LEP etc)

– BRENT STAFF & PENSIONERS 150 + (Wednesday)

– EDUCATION 150 + students (Thursday)

• English Martyrs; High Tunstall; St Hilds; Manor Community Academy: Dyke House

– COMMUNITY 350 + residents (Saturday)

• 3 Sessions: 104; 114; 125 registered to date

Page 55: THE ABLE GROUP€¦ · • Reverse engineering. DECOM NORTH SEA –29 NOVEMBER 17 No 17 BP NORTH WEST HUTTON ... Taj Mahal Agra Seoul Tower Seoul Eiffel Tower Paris Brent Delta London

No 55DECOM NORTH SEA – 29 NOVEMBER 17

CONTRACT

• Investment - £28m

• Period: 2015-2025

• c. 50 jobs safeguarded/created

• Up to 100,000t – c. 97% + to be

re-cycled

• Unique facility

• Re-affirms ABLE as Market

Leader