The 2012 Revision of the Common Twinning Manual Institution Building Days Institution Building Days DG Enlargement – DG DEVCO EuropeAid DG Enlargement – DG DEVCO EuropeAid Brussels,7 June 2012 Brussels,7 June 2012

The 2012 Revision of the Common Twinning Manual

  • Upload
    huong

  • View
    24

  • Download
    1

Embed Size (px)

DESCRIPTION

The 2012 Revision of the Common Twinning Manual. Institution Building Days DG Enlargement – DG DEVCO EuropeAid Brussels,7 June 2012. Introduction. Why? Periodical revision of the Twinning rules Evaluation TA vs. Twinning (2010) ELARG - PowerPoint PPT Presentation

Citation preview

Page 1: The 2012 Revision of the Common Twinning Manual

The 2012 Revision of theCommon Twinning Manual

Institution Building DaysInstitution Building DaysDG Enlargement – DG DEVCO EuropeAidDG Enlargement – DG DEVCO EuropeAid

Brussels,7 June 2012Brussels,7 June 2012

Page 2: The 2012 Revision of the Common Twinning Manual

Introduction

• Why?• Periodical revision of the Twinning rules• Evaluation TA vs. Twinning (2010) ELARG• First Evaluation of the Institutional Twinning Instrument

with the ENP countries (2011) DEVCO

• How?• Shorter gap between programming and implementation• More flexibility = more responsibility for twinners

• NB: Some of the changes only for IPA projects

Page 3: The 2012 Revision of the Common Twinning Manual

Applicability

The Twinning Manual 2012 is applicable to all projects for which the notification of selection has been sent on or after 2 April 2012

Page 4: The 2012 Revision of the Common Twinning Manual

Shortening the gap - I

• Selection meeting 2 weeks after the deadline for submission of proposals.

• Tight deadlines for Beneficiaries and EUD to decide on proposals and inform MS: selection within 3 weeks of selection meeting, communication with no delay.

• If deadline not met, MS can notify that it is no longer bound by its proposal and Twinning Fiche may be re-circulated.

Page 5: The 2012 Revision of the Common Twinning Manual

Shortening the gap - II

• "Selection under ENPI" – Notification of Results: The CA specify in the letter possible dates for the first preparatory mission in the BC within the next two weeks.

• Reduction from 6 months to 4 (IPA) or 5 (ENPI) for the negotiation of the contract (but same reimbursable preparation costs).

Page 6: The 2012 Revision of the Common Twinning Manual

Increasing flexibility

• Side letters for budgetary changes also after the “15% addendum”

• No addenda for suspension or termination• No request for first pre-financing

• Under IPA, Operative Side Letters detail the work plan and the budget, which in the contract are in an abridged form

Page 7: The 2012 Revision of the Common Twinning Manual

Increasing public character

• Project Leader more involved in the steering of the project

• Junior Project Leader attends Project Steering Committees

• Clarification of RTA role and assignments• Clarification of competences of ad hoc mandated

bodies

Page 8: The 2012 Revision of the Common Twinning Manual

Other significant changes

• Support to visibility events • Consolidation of official notes and guidelines• Alignement to the PRAG 2012• Text consistency

Page 9: The 2012 Revision of the Common Twinning Manual

Project Leaders responsibility

• Under IPA: Operative Side Letters require deeper involvement of the Lead Project Leader

• Junior Project Leader can attend Project Steering Committees – growing number of consortia

Page 10: The 2012 Revision of the Common Twinning Manual

Resident Twinning Adviser

• Twinning project cannot run without RTA.• Avoid professionalization of RTA – secure link with

the MS Public Administration – mark a difference with consultants

• Limit to assignments (max 4):• Not more that 3 years in same Beneficiary• Not more than 2 projects in same region• For 3rd project at least 6 uninterrupted months in MS• For 4th project at least 3 uninterrupted years in MS

Page 11: The 2012 Revision of the Common Twinning Manual

Mandated Bodies

• Mandated bodies are semi-public bodies that must satisfy the following criteria:1. Proven competence in a field of the EU Acquis2. Non-profit structure, non-commercial purpose3. Public ownership4. Under the permanent and structural supervision of a

government authority5. A sufficient and proportionate level of permanent staff

• In case criteria 2 and 3 are partially fulfilled, restricted mandated body status can be granted.

Page 12: The 2012 Revision of the Common Twinning Manual

Special case: ad hoc mandated body

• Ad hoc mandated bodies (do not fulfil one or more criteria other than 2 or 3) can provide only a "small, very specialised contribution to a Twinning project".

• Therefore staff of ad hoc mandated bodies cannot perform any key role in the project (Project Leader or RTA).

Page 13: The 2012 Revision of the Common Twinning Manual

Increased importance of visibility

• Opening and closure events are seen as visibility events

• In exceptional cases up to 500 € can be foreseen for small catering during those events

• Visibility important not only for the success of a project, also for its sustainability

Page 14: The 2012 Revision of the Common Twinning Manual

Consolidation of official notes and guidelines

• Update of Twinning Review Missions procedures• Inclusion of Fact Finding Missions guidelines• Universities and academic institutions are not

seen as practitioners of Public Administrations, therefore can apply only for ad hoc (letter EC to NCP of 2006).

Page 15: The 2012 Revision of the Common Twinning Manual

Main change under IPA

• Details of WP and Budget outside of contract• Operative Side Letters – First one with contract,

following every 6 months (Project Steering Committee)

• PL cannot delegate signature OSL• CA must have at least five days to evaluate a draft

OSL• No comment allows for implementation as of sixth

working day

Page 16: The 2012 Revision of the Common Twinning Manual

Thank you for your attention

Twinning Coordination Team – DG ELARGPaolo Gozzi (Team leader)Jordi Rodríguez RuizMarc PatuzzoBirgit Persson

Elarg Twinning Mail: [email protected]

Twinning Coordination Team – DG DEVCOChristophe Ingels (Team leader)Joanna Jablonska (Eastern Partnership)Lucia Santuccione (Middle East)María del Mar Roca (Northern Africa)

Devco Twinning Mail: [email protected]