Thank you to our sponsors!
“CMAA has met the standards and requirements of the
Registered Continuing Education Program. Credit earned
on completion of this program will be reported to RCEP at
RCEP.net. A certificate of completion will be issued to each
participant. As such, it does not include content that may
be deemed or construed to be an approval or endorsement
by the RCEP.”
The Small Business Committee Welcomes
The Montgomery County Department of Transportation –
Update on Infrastructural Projects •Quick Facts about Montgomery County
• County Agencies with construction projects
• Current and upcoming projects
• Project delivery and financing
• Construction contracting
• Professional Services (CM) Contracting
• County Set Aside Programs
• Resources
• Questions
MONTGOMERY COUNTY MARYLAND
Update on Infrastructure
Projects
Girum Awoke – Section Chief, Construction
MCDOT, Division of Transportation Engineering
Washington D.C
March 31, 2017
• Quick Facts about Montgomery County
• County Agencies with construction
projects
• Current and upcoming projects
• Project delivery and financing
• Construction contracting
• Professional Services (CM) Contracting
• Resources
• Questions
Outline of Presentation
Quick Facts about
Montgomery County
Established in 1779
Maryland's most populous
County (~1 Million)
Maryland's most affluent
jurisdiction
Budget (FY 17-22): ~$5.5
Billion in Operating & ~$13.8
Billion in Capital budget
(includes $6.6 Billion for
MCPS, WSSC, and MNCPPC)
• Transportation (~$3.0
Billion)
• General Government ($1.2
Billion)
• Environmental
Conservation ($0.5 Billion)
• Dept. of Transportation
• Roads
• Bridges
• Pedestrian Facilities
• Drainage Facilities
• Parking Facilities
County Agencies with major construction
projects (Executive Branch)
• Dept. of Environmental Protection
• Stream Valley Improvements
• SWM Facility Structural Repairs
• Watershed Restoration
• SWM Retrofit (Roads, Schools,
Countywide)
• Dept. of General Services
• County Offices and
Other Improvements
• Special Projects
• Energy Systems
Modernization
• Project delivery methods
• Design-Bid-Build
• Design-Build
• CMAR (first project in progress)
• Work Order Contract (on-call Task
Orders)
• Project Financing
• Bonds (GO Bonds etc.)
• State and Federal Aid/Grants
• Intergovernmental Financing
• Impact Tax
• Land Sale
• Public Private Partnerships
Project Delivery and Financing
DEPARTMENT OF TRANSPORTATION
Division of Transportation Engineering
Recently completed Construction projects
(Sampled from the Past Three Years) Project Project
Type/Category
Master Plan
Location
Construction
Cost
Construction
Duration
Completi
on Date
Dale Drive Sidewalk Pedestrian Facility Silver Spring $4.0 M 450CD 2013
Whites Ferry Rd Bridges Bridge Poolesville $2.0 M Calendar Date of
8/25/2014
2014
Greentree Rd Sidewalk Pedestrian Facility Bethesda $2.5 M 365 CD 2014
Century Blvd Road Germantown $7.5 M 450CD Winter 2014
MacArthur Boulevard Bicycle Facility Glen Echo $6 M 540CD Spring 2015
Chapman Avenue
Extended
Road North Bethesda $3.2 M 300 CD Spring 2016
Valley Road Bridge Bridge Bethesda $0.6 M 120 CD Calendar
Date
08/25/15
Bridge Joint Rehab Bridge Countywide $0.6 M 180 CD Fall 2015
Division of Transportation Engineering
Division of Transportation Engineering Active Construction projects
(Under Contract or construction) Project Project
Type/Category
Master Plan
Location
Construction
Cost
Constructio
n
Duration
(Per original
schedule)
Completion
Date
(Anticipated)
White Flint West
Workaround – Phase 1
(DB w UP)
Road/Pedestrian Facility White Flint $8 M 365 CD fall 2017
MD 355 Crossing (D/B) Pedestrian /Bicycle
Facility
Bethesda $85 M 950 CD Fall 2020
Elmhirst Parkway Bridge Bridge Bethesda $2.0 M 120 CD Spring 2017
Snouffer School Road Road Gaithersburg $13 M 900 CD Spring 2016
Wapakoneta Road
Improvements
Drainage Improvement Glen Echo $1.5 M 300 CD Spring 2015
Germantown Culvert Slip
Lining Bridge Germantown $1.6 M 120 CD Spring 2017
Needwood Road
Buikepath Phase 1
Pedestrian /Bicycle
Facility
Derwood $2.6 M 330 CD Spring 2017
Stringtown Road
Widening
Road
Clarksburg $7 M 450 CD
Summer 2017
Division of Transportation Engineering Projects to be Advertised in the next 1-2 years
(Selected)
Project Project
Type/Category
Master Plan
Location
Project Budget
Construction
Duration (est.)
Advertisement Date
White Flint District - West -
Phase 2 Road/Ped Access North Bethesda $30 M ~2 yrs (est) Spring 2016
Frederick Road Bike Path Pedestrian Facility Germantown $7.5 M 1 year Spring 2016
Gold Mine Rd Bridge Bridge White Oak $4.5 M 1 year Fall 2016
Piney Meetinghouse Road
Bridge Bridge Rockville $3 M 180 CD Summer 2015
Park Valley Road Bridge
(MPK-03) Bridge Silver Spring $4 M 200 CD Fall 2015
Platt Ridge Drive Extended Road Bethesda $3 M 300 CD Summer 2015
Metropolitan Branch Trail Pedestrian/ Silver Spring $4 M 420 CD Spring 2016
Snouffer School Road North Road Gaithersburg $10 M 450 CD Spring 2016
Division of Transportation Engineering
Projects on the Horizon (3-5) years
Project Project
Type/Category
Master Plan
Location
Project
BUdget
Construction
Duration (est.)
Advertisement
Date
Goshen Road Road Gaithersburg $130 M ~1100 CD Summer 2019
Montrose Parkway
East
Road North
Bethesda
$145 M ~1100 CD Summer 2018
Dorsey Mill Bridge
over I-270
Road, Bridge Germantown $25 M 450 CD Summer 2018
Needwood Road Bike
Path
Pedestrian/
Bicycle Facility
Glenmont $4 M ~450 CD Spring 2018
Goldsboro rd Bike
Path
Pedestrian/
Bicycle Facility
Potomac $16 M ~450 CD Spring 2019
White Flint District -
East - Transportation
Road/Ped
Access
North
Bethesda
$30 M
N/A N/A
DEPARTMENT OF TRANSPORTATION
Wheaton Redevelopment Project
DEPARTMENT OF GENERAL SERVICES
Division of
Building Design & Construction
(from a 2015 presentation)
Completed Construction Projects (past 5 years)
Project Total Project Cost
($1,000’s)
Completion Date
Takoma Park Fire Station No. 2 $11,107 2010
Vehicle Recovery Facility (Police) $3,300 2010
MAC Diving Tower
Refurbishment (REC) $1,668 2010
Red Brick Courthouse Structural
Repair $354 2010
Mid County Comm. Rec. Center $12,150 2011
White Oak Comm. Rec. Center $24,330 2012
Brookville Service Park (PH II) $17,913 2012
Silver Spring Civic Building $19,100 2010
East Germantown (Milestone)
Fire Station No. 34 $17,062 2011
Division of Building Design & Construction
Division of Building Design & Construction
Recently Completed Construction Projects Project Total Project Cost
($1,000’s)
Completion Date (est.)
Animal Shelter $26,018 Nov 2013
Plum Gar Neighborhood
Recreation $8,460 May 2013
Travilah Fire Station No. 32 $16,814 Feb 2014
3rd District Police Station $25,757 May 2014
Wheaton Rescue Squad
Relocation $7,338 Oct 2013
Gaithersburg Library $23,041 Dec 2013
Olney Library $12,909 Dec 2013
Scotland Neighborhood Rec
Center
$7,998
Oct 2014
Division of Building Design & Construction
Active Construction Projects
Project Total Project Cost
($1,000’s)
Bid Date
Silver Spring Transit Center $108,000* Delay
Silver Spring Library $69,529 Nov 2012
Dennis Avenue Health Center $38,383 Mar 2014
North Potomac Community
Rec. Center $37,462 Apr 2014
Colesville Depot $10,414 May 2014
Ross Boddy Neighborhood Rec
Center $15,760 August 2014
Division of Building Design & Construction
Future Construction Projects
Project Total Project Cost
($1,000’s)
Bid Date (est.)
Glenmont Fire Station No. 18 $14,307 Feb 2014
Good Hope Neighborhood Rec Center $10,029 Pre-qualified
Wheaton Library & Community Rec. Ctr. $58,355 Dec 2015
Western County outdoor Pool Renovation
& ADA $4,470 June 2015
Avery Road Treatment Center – PPP RFP $4,800* Jan 2015
White Flint Fire Station $27,829 TBD
Kensington Fire Stn. No. 25 Additions $16,167 TBD
Criminal Justice Complex $4,207 TBD
DOCR staff Training Center $5,270 TBD
DEPARTMENT OF ENVIRONMENTAL
PROTECTION
(from a 2015 presentation)
Completed Construction Projects (past 3 years)
Project Project Type Construction Cost Construction
Duration
Completion
Date
Forest Estates Low Impact Development
Facilities (LID)
$470,000 150 CD 2012
Kensington & Aspen Hill
Libraries
LID $470,000 300 CD 2012
Ridgeview Middle School LID $260,000 90 CD 2012
Booze Creek I Stream Restoration $1,180,000 530C CD 2012
Dennis Avenue LID IA LID $230,000 170 CD 2012
White Oak LID LID $1,370,000 400 CD 2012
Dickerson Water Ponds SWM Ponds $720,000 120 CD 2013
NIH SWM Ponds SWM Ponds $3,450,000 880 CD 2013
Dennis Avenue LID IB LID $530,000 200 CD 2013
Montgomery Auto Park Pond SWM Ponds $1,200,000 280 CD 2014
Brookville Depot SWM Ponds and LID $1,060,000 270 CD 2014
Dennis Avenue LID II LID $720,000 360 CD 2014
Layhill Area Ponds (3) SWM Ponds $970,000 400 CD 2014
Dennis Avenue LID III LID $1,570,000 270 CD 2014
Fallsberry SWM Pond SWM Ponds $270,000 160 CD 2014
Sligo Park Hills LID $2,640,000 520 CD 2014
Franklin Knolls I & II LID $760,000 220 CD 2014
Tenbrook / Amherst LID $530,000 180 CD 2014
Active Construction Projects
Project Project Type Construction Cost Construction
Duration
Completion
Date
Donnybrook LID and Stream
Restoration
$1,920,000 550 CD Spring 2015
Whetstone Run Ponds (3) SWM Ponds $1,470,000 250 CD Summer 2015
Breewood Stream Stream Restoration $800,000 200 CD Summer 2015
Clagett Farm Ponds (2) SWM Ponds $570,000 220 CD Summer 2015
Hollywood Branch Stream Restoration $2,140,000 520 CD Summer 2015
Chadswood Pond SWM Ponds $800,000 240 CD Summer 2015
Project Project Type Estimated
Construction Cost
Construction
Duration
Completion Date
(Anticipated)
15-20 SWM Ponds SWM Ponds $15M to $20M 180 to 360 CD each --
2-4 Streams Stream Restoration $2M to $6M 200 to 400 CD each --
4-6 LID Projects LID $4M to $6M 200 to 300 CD --
Upcoming Projects
Types of Contracts Administered
• Low Bid (DBB) Contracts
• Best Value Contracts (one or two-
step)
• Work Order (On-call) Contracts
• QBS Contracts (Professional
Services including CMCI)
Contractor Selection Evaluation Criteria:
• Past Performance
• Previous Experience
• Equipment and Experience Certifications
• Price (Low Bid)
• Customer/Client Recommendations
• Responsiveness
Professional Services
Selection Evaluation Criteria:
• Written Proposal
• Presentation/Interview
• Meeting MFD Requirements
• Past Performance
Contract Management Issues:
• Completing MFD plan in a timely manner
• Completion of Insurance Documentation
• Completing Schedule of Values
• Completing Initial Critical Path Schedule
• Disputes for Time Extension and/or
Compensation
• Specification Interpretations
• MBE Sub-contractor Replacement
• Contractual Authority
• Permits Acquisition/Renewal
• Management of subs
Resources
• County home page:
http://www.montgomerycountymd.gov/inde
x.aspx
• DOT:http://www.montgomerycountymd.go
v/dot/index.html
• Procurement
http://www.montgomerycountymd.gov/proc
urement
• DGS
(http://www.montgomerycountymd.gov/dgs
• DEP:
http://www.montgomerycountymd.gov/dep/
@MCDOTNow
@M0Co_DTE
Questions?
Girum Awoke, PhD, P.E., Chief Transportation Construction, MCDOT