DRAFT MINUTES OF THE 18 th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. IN THE CONFERENCE HALL OF COMMISSIONERATE OF INDUSTRIES, 1 st FLOOR, GOVERNMENT OF PRINTING PRESS BUILDINGS, MUTYALAMPADU, VIJAYAWADA. The list of the Members who attended the Meeting. Sl. No. Members Name & Designation of Member / Representative Sri / Smt. 1. Chairman, State Level Committee. Siddharth Jain, IAS., Chairman of SLC & Commissioner of Industries. 2. The Commissioner, Commercial Taxes, AP. M. Pampapathi, Addl. Commissioner (CT). 3. The Chief Commissioner, Land Administration. SVSS Lakshmi, Asst. Secretary. 4. The Chairman, Tribal Welfare Department. V. Sasikala, DGM 5. The President, FAPSIA EP Purnachandra Rao, Vice President 6. The Commissioner, Transport Department K. Sankara Rao, Asst. Secretary 7. The Commissioner & Inspector General, Registration Stamps Department. K. Suseela, Asst. Inspector General. 8. The Chief Engineer (Commercial) APTRANSCO Ch.V. Ramana, ADE 9. The Chairman, C.I.I Y. V. Krishna Mohan, Convenor APMSME 10. The Chairman, AP Spinning Mill Assosiation. D. Prasad, Chairman. 11. The Managing Director, APIIC M. Murali Mohan, OSD 12. The Conviner, SLBC, Andhra Bank. N. Venugopal, AGM 13. The President, FSME APK Reddy, President. 14. Member-Convenor, State Level Committee. K. Vijaya Ratnam, Convenor of SLC / Joint Director (II). The Chairperson of the SLC welcomed the participated members and the special invitees of the Committee. The SLC reviewed and discussed the proposals of Large and Mega projects placed in the SLC on case to case basis. The Chairman requested the representatives of Industrial units to furnish the details of their employees and activities taken up under Corporate Social Responsibility along with photos as the Government intends to showcase it in the departmental website. The chairperson requested the unit holders to speak out if they have any grievances relating to their industries. The promoter of M/s. Ramabhadra Industries Pvt, Ltd, Talacheruvu (V), Tadipathi (M), Anathapruam District has informed that their proposal for sanction of investment subsidy for their ‘wind power’ project is pending in CoI as they couldn’t produce the registered land sale / lease deed as it is allotted by the Government on tri-party mode between NREDCAP, the developer M/s. Gamesa Wind Turbines Pvt Ltd., (Developer) and them. The Commissioner of Industries directed the JD(II) to send a reminder to the Government for resolving the issue. He has also requested the representative of Registration and Stamps

th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

  • Upload
    others

  • View
    0

  • Download
    0

Embed Size (px)

Citation preview

Page 1: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

DRAFT MINUTES OF THE 18th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M.IN THE CONFERENCE HALL OF COMMISSIONERATE OF INDUSTRIES, 1st FLOOR,GOVERNMENT OF PRINTING PRESS BUILDINGS, MUTYALAMPADU, VIJAYAWADA.

The list of the Members who attended the Meeting.

Sl. No. MembersName & Designation of Member /RepresentativeSri / Smt.

1. Chairman, State Level Committee.Siddharth Jain, IAS.,Chairman of SLC & Commissioner ofIndustries.

2. The Commissioner, Commercial Taxes, AP. M. Pampapathi, Addl. Commissioner(CT).

3. The Chief Commissioner,Land Administration. SVSS Lakshmi, Asst. Secretary.

4. The Chairman,Tribal Welfare Department. V. Sasikala, DGM

5. The President, FAPSIA EP Purnachandra Rao, Vice President6. The Commissioner, Transport Department K. Sankara Rao, Asst. Secretary

7. The Commissioner & Inspector General,Registration Stamps Department. K. Suseela, Asst. Inspector General.

8. The Chief Engineer (Commercial)APTRANSCO Ch.V. Ramana, ADE

9. The Chairman, C.I.I Y. V. Krishna Mohan, ConvenorAPMSME

10. The Chairman, AP Spinning MillAssosiation. D. Prasad, Chairman.

11. The Managing Director, APIIC M. Murali Mohan, OSD12. The Conviner, SLBC, Andhra Bank. N. Venugopal, AGM13. The President, FSME APK Reddy, President.

14. Member-Convenor, State LevelCommittee.

K. Vijaya Ratnam, Convenor ofSLC / Joint Director (II).

The Chairperson of the SLC welcomed the participated members and the special inviteesof the Committee. The SLC reviewed and discussed the proposals of Large and Megaprojects placed in the SLC on case to case basis. The Chairman requested therepresentatives of Industrial units to furnish the details of their employees and activitiestaken up under Corporate Social Responsibility along with photos as the Governmentintends to showcase it in the departmental website. The chairperson requested the unitholders to speak out if they have any grievances relating to their industries.

The promoter of M/s. Ramabhadra Industries Pvt, Ltd, Talacheruvu (V), Tadipathi (M),Anathapruam District has informed that their proposal for sanction of investment subsidyfor their ‘wind power’ project is pending in CoI as they couldn’t produce the registeredland sale / lease deed as it is allotted by the Government on tri-party mode betweenNREDCAP, the developer M/s. Gamesa Wind Turbines Pvt Ltd., (Developer) and them. TheCommissioner of Industries directed the JD(II) to send a reminder to the Government forresolving the issue. He has also requested the representative of Registration and Stamps

Page 2: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

ItemNo. Brief Description of the issue Decision of the Committee

1Follow up action on the minutes of the previous Meeting held on 25/01/2018.

Noted.

Brief Description of the issue SVC Opinion Decision of the Committee

4

Clarification on release of Incentives to M/s.Jaypee Balaji Cement Plant, Budawada (V), Jaggaiahpeta (M), Krishna Dist.

SVC examined the issue in detailed and opined that as M/s . Ultra Tech Cement Ltd. has given NOC , incentives may be released toM/s.Jaypee Balaji Cement Plant.

SLC examined the issue in detail along with board resolutions submitted by both company representatives and decided to release the sanctioned incentives to M/s.Jaypee Balaji Cement Plant, since the representative of M/s UltraTech Cement Ltd. has submitted NOC for release of sanctioned incentives to M/s.Jaypee Balaji Cement Plant.

2 Claim applications for sanction / rejection of Reimbursement of Interest Subsidy, Reimbursement of Power Cost, Reimbursement of sales tax, Mortgage duty & Stmp duty under IIPP – 2005-10, IIPP 2010-15 & IDP 2015-20 scrutinised & recommended by the SVC to the SLC in its Meeting held on 14/09/2017, 14/11/2017 & 04/01/2018, the details are as follows:

ABSTRACT

Type of Incentives

No. of claims

No. of Industries

Amount Recommended by SVC

in Rs.

Amount sanctioned by SLC

Interest Subsidy 12 12 68876125 144930566Inv. Subsidy 2 2 46843820 46843820Mortgage Duty 1 1 50000 50000Power cost 159 44 962506934 1202544043

department who attended the meeting to look into the matter and comply in the nextmeeting.

The President of M/s. A.P. Spinning Mills Association has stated that their association isvery happy because the SLC could able to sanction an amount of Rs.801.61 Crores to thelong pending (771) claims, pertaining to (372) Large and Mega projects in the last (5)meetings under the guidance and dynamic leadership of the Commissioner of Industries.He has appreciated the Commissioner of Industries and other Staff for performingfantastic job in achieving this with hard work and dedication. He expressed his pleasurefor creating Investor friendly environment through EoDB as it is very encouraging to setup new Enterprises. He also told that a new era has been embarked with the initiatives ofthe Government.

Item wise decision of the State Level Committee is as follows:

Page 3: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

Sales Tax 7 11 436168997 436168997Stamp Duty 1 2 449718 449718Total 182 72 1514895594 1830987144

Rs. in Crores 151.49 183.10

(Variation between SVC recommendation and SLC sanctions due to the case of M/s.Mohan Spintex India Limited, Krishna District was directly considered by the SLC.)

LIST OF UNIT WISE PROPOSALS DISCUSSED BY SLC & DECISION OF SLC

Sl. No.

Dateof receiptof claim

Name & Address of the industry

District

Line of activ

ity

Date of Commencement of commercial production

Nature of incentiv

es

Policy

SCV recommened amount

Quarter / half year

YearDecision of SLC

1 15/06/15

Paramesu Biotech Pvt Ltd., 972, Devarapalli (V&M), Wg Dist

West Godav

ari

Maize Starc

h

05/01/15

Powercost

IIPP 2010-15

Rs. 34,42,125/- (Rupees thirty four lakhs forty two thousand one hundred and twenty five only)

2nd half year

2016-17

Agreed

2 15/06/15

Paramesu Biotech Pvt Ltd., 972, Devarapalli (V&M), Wg Dist

West Godav

ari

Maize Starc

h

05/01/15

StampDuty

IIPP 2010-15

Rs. 4,49,718/- (Rupees Four lakhs forty nine thousand seven hundred and eighteen only)

2016-17

Agreed

3 15/06/15

Paramesu Biotech Pvt Ltd., 972, Devarapalli (V&M), Wg Dist

West Godav

ari

Maize Starc

h

05/01/15

Mortgage Duty

IIPP 2010-15

Rs. 50,000/- (RupeesFifty thousand only)

2016-17

Agreed

Page 4: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

4 02/09/16

Ushaspincoatpvtltd , Rs-341,Chikkavaram,Vijayawada,,521101

Krishna

Cotton Yarn

04/04/11

Powercost

IIPP 2010-15

Rs. 91,87,390/- (Rupees Ninetyone lakhs eighty seven thousand three hundred and ninety only)

1st Quarter

2016-17

Agreed

5 03/09/16

Nagasindhu Spinning& Ginning Mills Private Limited , 1079/2,Krishnarao Palem,Vijayawada,,521227

Krishna

Yarn 16/03/09

Powercost

IIPP 2005-10

Rs. 55,03,104/- (Rupees Fifty five lakhs three thousand one hundred and four only)

1st Quarter

2016-17

Agreed

6 23/09/16

Swarnalatha SpintexPvt Ltd , RS No 1/4,Veluru Ad,Serinarasannapalem,,521105

Krishna

Cotton Spinning

12/02/12

Powercost

IIPP 2010-15

Rs. 81,02,854/-(Rupees Eightyone lakhs two thousand eight hundred and fifty four only)

1st half year

2016-17

Agreed

7 24/09/16

Mohan Spintex IndiaLimited, (Unit-II) , 289/2b3, Remalle Village, Remalle Village, Krishna,521110

Krishna

Yarn 07/03/11

Powercost

IIPP 2005-10

Rs. 3,16,65,859/-(Rupees Three crores sixteen lakhs sixty fivethousand eight hundred and fifty nine only)

1st Quarter

2016-17

Agreed

8 27/09/16

Mohan Spintex IndiaLimited (Expansion) , R.S.No.29/2,Vattigudipadu Village,VattigudipaduVillage,,521211

Krishna

Yarn 28/04/08

Powercost

IIPP 2005-10

Rs. 20,42,505/- (Rupee twentylakhs fortytwo thousand five hundred and five only)

1st Quarter

2016-17

Agreed

Page 5: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

9 28/09/16

Idupulapadu CottonMills Pvt Ltd Unit-Ii , 22etc,Jonnathali,Jonnathali,,523301

Prakasam

Cotton Yarn

09/08/11

Powercost

IIPP 2010-15

Rs. 3,18,16,030/- (Rupees Three crores eighteen lakhs sixteen thousand and thirty only)

1st Quarter

2016-17

Agreed

10 28/09/16

Nsl Textiles Limited , 253,Budampadu,Guntur,,522017

Guntur

Garmenting

30/06/10

Powercost

IIPP 2005-10

Rs. 5,99,676/- (Rupees Five lakhs ninety nine thousand six hundred and seventy six only)

1st Quarter

2016-17

Agreed

11 29/09/16

Sandhya Spinning Mill Limited , 66,67,Gopinenipalem,Jaggaiahpet,,521190

Krishna

Cotton Yarn

01/05/09

Powercost

IIPP 2005-10

Rs. 49,78,055/-(Rupees forty nine lakhs seventy eight thousand fifty five rupees only)

1st Quarter

2016-17

Agreed

12 29/09/16

Sri Harini Textiles Limited , 47,48 And 49,Tirumalagiri,Jaggayyapeta,,521175

Krishna

Cotton Yarn

12/06/08

Powercost

IIPP 2005-10

Rs. 38,77,130/-(Rupees thirty eight lakhsseventy seven thousand one hundred and thirty only)

1st Quarter

2016-17

Agreed

13 29/09/16

Sri Vishnu Shankar Mill Limited , 65/3, 65/4,Gopinenipalem, Jaggaiahpet,,521190

Krishna

Cotton Yarn

12/03/09

Powercost

IIPP 2005-10

Rs. 52,22,823/- (Rupees Fifty two lakhs twenty twothousand eight hundred and twenty threeonly )

1st Quarter

2016-17

Agreed

14 30/09/16

Rajapalayam Mills Limited , 16,65,Gopinenipalem,Gopinenipalem,,521190

Krishna

Cotton Yarn

07/12/08

Powercost

IIPP 2005-10

Rs. 51,58,225/- (Rupees Fifty one lakhs fifty eight thousand two hundred and twenty five only)

1st Quarter

2016-17

Agreed

Page 6: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

15 04/10/16

Vantagespinners Private Limited , 50,53/2,Gollapalli,Gollapalli,,521111

Krishna

Cotton Yarn

12/02/10

Powercost

IIPP 2005-10

Rs. 1,19,06,387/- (Rupees Onecrores nineteen lakhs six thousand three hundred and eighty seven only)

1st quarter

2016-17

Agreed

16 21/10/16

Bmr Industries(P) Limited , 230/2,B-1,C-1,P-1,,Damavaram,Nellore,,524152

SPSR Nellor

e

ManufactureOf Shrimp Fe

ed

18/05/16

Powercost

IDP 2015-20

Rs. 11,53,112/- (Rupees Elevenlakhs fifty three thousand one hundred and twelve)

1st half year

2016-17

Agreed

17 22/10/16

Ravali Spinners Pvt Ltd - 1st Expansion , F-19,INDUSTRIAL ESTATE,TANUKU,,534218

West Godav

ari

Cotton Yarn

01/01/09

Powercost

IIPP 2005-10

Rs. 49,13,892/- ( Rupees fortynine lakhs thirteen thousand eight hundredand ninetytwo only )

2nd Quarter

2016-17

Agreed

18 24/10/16

Svr Spinning Mills Pvt Ltd , 366,Malleswaram,Khandavalli,,534330

West Godav

ari

Cotton Yarn

20/11/11

Powercost

IIPP 2010-15

Rs. 27,23,140/- (Rupees Twenty seven lakhs twenty three thousand one hundred and forty only)

1st half year

2016-17

Agreed

19 24/10/16

Swarnalatha SpintexPvt Ltd , Rs No 1/4,Veluru Road,Serinarasannapalem,,521105

Krishna

Cotton Spinning

12/02/12

Interest Subsidy

IIPP 2010-15

Rs. 74,86,356/- (Rupees Seventy four lakhs eighty six thousand three hundred and fifty six only)

1st half year

2016-17

Agreed

20 24/10/16

Kallam Spinning MillsLimited , 116b, Nh5,Chowdavaram, Guntur,,522019

Guntur

Cotton Yarn, Open End

18/03/10

Powercost

IIPP 2005-10

Rs. 45,10,950/-(Rupees Forty five lakhs ten thousand nine hundred and fifty only)

1st Quarter

2016-17

Agreed

Page 7: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

21 28/10/16

Til Healthcare (P) Ltd., Plot No.100, West, R5, South, Sri City Sez, Cherivi (V), Iruguluam (Po), Satyavedu (M), Chittoor District

Chittoor

Allopathy Pharmaceutica

ls

03/04/12

Powercost

IIPP 2010-15

Rs. 9,00,570/- (Rupees Nine lakhs Five hundred and seventy only)

1st half year

2016-17

Agreed

22 28/10/16

Patchala Spintex Private Limited , 229/25.1,Rajupalem Village,Guntur,,522412

Guntur

Manufacturer Of Cotton Yarn

01/05/15

Powercost

IDP 2015-20

Rs. 67,61,940/- (Rupees Sixty seven lakhs sixty onethousand nine hundred and forty only)

1st half year

2016-17

Agreed

23 28/10/16

Patchala Spintex Private Limited , 229/25.1,Rajupalem Village,Guntur,,522412

Guntur

MANUFACTURER OF Cotton Y

arn

13/04/12

Powercost

IIPP 2010-15

Rs. 60,69,402/- (Rupees Sixty lakhs sixty nine thousand four hundred and two only)

1st half year

2016-17

Agreed

24 30/10/16

Kallam Spinning MillsLimited , 116b, Nh5,Chowdavaram, Guntur,,522019

Guntur

Cotton Yarn, Open End

18/03/10

Powercost

IIPP 2005-10

Rs. 45,63,320/- (Rupees Forty five lakhs sixty threethousand three hundred and twenty only )

2nd Quarter

2016-17

Agreed

25 31/10/16

Sandhya Spinning Mill Limited , 66,67,Gopinenipalem,Jaggaiahpet,,521190

Krishna

Cotton Yarn

01/05/09

Powercost

IIPP 2005-10

Rs. 55,45,586/- (Rupees Fifty five lakhs forty five thousand five hundred and eightysix only)

2nd Quarter

2016-17

Agreed

Page 8: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

26 11/11/16

Anjani Tiles Limited , 522-527,Eaguva Raja Palem,Gudur,,524410

SPSR Nellor

e

ManufactureOf Tile

s

01/04/16

Powercost

IDP 2015-20

Rs. 78,86,525/- (Rupees Seventy eight lakhs eightysix thousand five hundred and twenty five only)

1st half year

2016-17

Agreed

27 12/11/16

Rayani Spintex Private Limited , 82-1b,Dhullipalla,Satenapalle,,522412

Guntur

Cotton Yarn

16/11/11

Powercost

IIPP 2010-15

Rs. 44,47,010/- (Rupees Forty four lakhs forty seven thousand and ten only)

1st half year

2016-17

Agreed

28 12/11/16

Sakku Spinning Mills Ltd. (Expansion, Chinakondrupadu, Pathipadu Mandal, Guntur District

Guntur

Cotton Yarn

06/10/11

Powercost

IIPP 2010-15

Rs. 95,77,400/- (Rupees ninetyfive lakhs seventy seven thousand four hundred only)

1st half year

2016-17

Agreed

29 12/11/16

Nagasindhu Spinning& Ginning Mills Private Limited , 1079/2,Krishnarao Palem,Vijayawada,,521227

Krishna

Yarn 16/03/09

Powercost

IIPP 2005-10

Rs. 50,99,396/- (Rupees Fifty lakhs ninety nine thousand three hundred and ninetysix only)

2nd Quarter

2016-17

Agreed

30 13/11/16

Sriven Spincot Private Limited , 8-87,Karuchola Road,Edlapadu,,522233

Guntur

Cotton Yarn

09/06/14

Powercost

IIPP 2010-15

Rs. 46,90,280/- (Rupees Forty six lakhs ninety thousand two hundred and eighty only)

1st half year

2016-17

Agreed

Page 9: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

31 17/11/16

The Gowthami Solvent Oils Limited , Spinning Unit 2, Plot No 323,Mortha, Tanuku,,534227

West Godav

ari

Cotton Yarn

18/10/11

Powercost

IIPP 2010-15

Rs. 57,06,300/- (Rupees Fifty seven lakhssix thousand three hundred only)

1st half year

2016-17

Agreed

32 17/11/16

Vennar Ceramics Limited , 593/1,596/1,3,597/5,Perikigudem,Kaikaluru,,521345

Krishna

Ceramic WallTiles

01/07/12

Powercost

IIPP 2010-15

Rs. 32,17,200/- (Rupees thirty two lakhs seventeenthousand two hundred only)

1st half year

2016-17

Agreed

33 18/11/16

Uma Spintex India Pvt Ltd , 523 To 526,Tamirisa,Tamirisa,,521327

Krishna

Cotton

06/10/11

Powercost

IIPP 2010-15

Rs. 60,71,135/- (Rupees Sixty lakhs seventy one thousand one hundred and thirty five only)

1st half year

2016-17

Agreed

34 21/11/16

Sri Venkata Lakshmi NarasimhaSpinning Mill Private Limited , 176/4,Gbc Road, Chebrolu Village,Chebrolu,,522212

Guntur

Cotton Yarn

20/11/14

Powercost

IIPP 2010-15

Rs. 22,07,150/- (Rupees twenty two lakhs seven thousand one hundred and fifty only)_

1st half year

2016-17

Agreed

35 22/11/16

Mohan Spintex IndiaLimited (Unit-II Diversification), 289/2b3, Remalle Village, Remalle Village,Krishna, 521211

Krishna

Spinning & Weavi

ng

30/04/15

Powercost

IDP 2015-20

Rs. 3,18,79,830/-(Rupees Three crores eighteen lakhs seventy nine thousand eight hundred and thirty only)

1st half year

2016-17

Agreed

Page 10: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

36 22/11/16

Mohan Spintex IndiaLimited, (Unit-II) , 289/2b3, Remalle Village, Remalle Village, Krishna,521110

Krishna

Yarn 07/03/11

Powercost

IIPP 2005-10

Rs. 3,18,25,948/- (Rupees Three crores eighteen lakhs twenty five thousand ninehundred and forty eight only)

2nd quarter

2016-17

Agreed

37 23/11/16

Sri Lakshmi Godavari Spinning Mills Ltd , (2nd Expansion) 113,CHEBROLU,GUNTUR,,522212

Guntur

Cotton Yarn

22/03/13

Powercost

IIPP 2010-15

Rs. 1,10,77,170/- (Rupees Onecrores tenlakhs seventy seven thousand one hundred and seventy only)

1st half year

2016-17

Agreed

38 23/11/16

Uma Spintex India Private Limited ( Expansion ) , 523 To 526,Tamirisa,Tamirisa,,521327

Krishna

Cotton Yarn

27/05/15

Powercost

IDP 2015-20

Rs. 62,81,270/- (Rupees Sixty two lakhs eight one thousand two hundred and seventy only)

1st half year

2016-17

Agreed

39 24/11/16

Jyotirmaye Textiles Private Limited , 41/1 And 41/3,Ramireddypet,Narasaraopet,,522601

Guntur

Cotton Yarn

18/06/15

Powercost

IDP 2015-20

Rs. 65,83,300/- (Rupees Sixty five lakhs eighty three thousand three hundred only)

1st half year

2016-17

Agreed

40 24/11/16

Kallam Brothers Cottons Private Limited , 160-B,Dhulipalla,Sattenapalli,,522412

Guntur

Cotton Yarn

29/09/13

Powercost

IIPP 2010-15

Rs. 69,12,340/- (Rupees Sixty nine lakhs twelve thousand three hundred and forty only)

1st half year

2016-17

Agreed

Page 11: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

41 24/11/16

Amaravathi TextilesPrivate Limited , Nh16,Martur,Martur,,523301

Prakasam

Cotton Yarn

27/03/09

Powercost

IIPP 2005-10

Rs. 3,26,37,255/- (Rupees Three crores twenty sixlakhs thirty seven thousand two hundred and fifty five only)

1st Quarter

2016-17

Agreed

42 25/11/16

Vantagespinners Private Limited , 50,53/2,Gollapalli,Gollapalli,,521111

Krishna

Cotton Yarn

12/02/10

Powercost

IIPP 2005-10

Rs. 1,19,06,387/- (Rupees Onecrores nineteen lakhs six thousand three hundred and eighty seven only)

2nd Quarter

2016-17

Agreed

43 26/11/16

Girnar Packaging , 11,12,13,Konetirajupalem, Manakuru Village,Naidupeta,,524421

SPSR Nellor

e

Corrugated Boxes & Boar

d

16/05/13

Powercost

IIPP 2010-15

Rs. 5,46,741/- (Rupees Five lakhs forty six thousand seven hundred and forty one only)

1st half year

2016-17

Agreed

44 26/11/16

Hindusthan NationalGlass And Industries Limited , 12-299,Menakuru,Naidupeta,,524421

SPSR Nellor

e

Container Glass

28/09/12

Powercost

IIPP 2010-15

Rs. 4,17,95,000/- (Rupees Four crores seventeen lakhs ninetyfive thousand only)

2nd Quarter

2016-17

Agreed

45 01/12/16

Uma Spintex India Pvt Ltd , 523 To 526,Tamirisa,Tamirisa,,521327

Krishna

Cotton

06/10/11

Interest Subsidy

IIPP 2010-15

Rs. 38,07,958/- (Rupees Thirty eight lakhsseven thousand ninehundred and fifty eight only)

1st half year

2016-17

Agreed

Page 12: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

46 05/12/16

Guntur Spinning MillsPrivate Limited , 491,492/2,Etukuru,Guntur,,522005

Guntur

Cotton Yarn

06/07/15

Interest Subsidy

IDP 2015-20

Rs. 1,12,26,746/- (Rupees Onecrore twelve lakhs twenty six thousand seven hundred forty six only)

1st half year

2016-17

Agreed

47 08/12/16

Rajapalayam Mills Limited , 16,65,Gopinenipalem,Gopinenipalem,,521190

Krishna

Cotton Yarn

07/12/08

Powercost

IIPP 2005-10

Rs. 61,72,409/- (Rupees Sixty one lakhs seventy two thousand four hundred and nine only)

2nd Quarter

2016-17

Agreed

48 08/12/16

Sri Vishnu Shankar Mill Limited , 65/3, 65/4,Gopinenipalem, Jaggaiahpet,,521190

Krishna

Cotton Yarn

12/03/09

Powercost

IIPP 2005-10

Rs. 55,76,127/- (Rupees Fifty five lakhs seventy sixthousand one hundred and twenty seven only)

2nd Quarter

2016-17

Agreed

49 14/12/16

Supriya Spinning Mills Private Limited , 4,6,Boyapalem, Vunnava Road,Boyapalem,,522233

Guntur

Spinning And Weaving

22/02/12

Powercost

IIPP 2010-15

Rs. 56,07,173/- (Rupees Fifty six lakhs seven thousand one hundred seventy three only)

1st half year

2016-17

Agreed

50 15/12/16

Ravali Spinners Private Limited (2nd Expansion Unit) , F-19,INDUSTRIAL ESTATE,TANUKU,,534218

West Godav

ari

Cotton Yarn

20/11/10

Powercost

IIPP 2010-15

Rs. 2,44,91,880/- (Rupees Twocrores forty four lakhs ninety one thousand eight hundred and eighty only)

1st half year

2016-17

Agreed

Page 13: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

51 20/12/16

Ushaspincoatpvtltd , Rs-341,Chikkavaram,Vijayawada,,521101

Krishna

Cotton Yarn

04/04/11

Powercost

IIPP 2010-15

Rs. 81,79,257/- (Rupees Eightyone lakhs seventy nine thousand two hundred and fifty sevenonly)

2nd Quarter

2016-17

Agreed

52 22/12/16

Paramesu Biotech Pvt Ltd., 972, Devarapalli (V&M), Wg Dist

West Godav

ari

Maize Starc

h

05/01/15

Powercost

IIPP 2010-15

Rs. 35,43,750/- (Rupees thirty five lakhs forty three thousand seven hundred and fifty only)

1st half year

2016-17

Agreed

53 22/12/16

Nagasindhu Spinning& Ginning Mills Private Limited , S.No. 1079/2,Krishnarao Palem,Vijayawada,,521227

Krishna

Yarn 01/09/14

Powercost

IIPP 2010-15

Rs. 10.71.156/- (Rupees Ten lakhs seventy one thousand one hundred and fifty sixOnly)

1st half year

2016-17

Agreed

54 22/12/16

Nsl Textiles Limited , 253,Budampadu,Guntur,,522017

Guntur

Garmenting

30/06/10

Powercost

IIPP 2005-10

Rs. 6,52,960/- (Rupees Six lakhs fifty twothousand nine hundred and sixty only)

2nd Quarter

2016-17

Agreed

55 24/12/16

BMM Cements Limited , 578,Gudipadu,Anantapuram,,515408

Anantapura

m

Cement

01/04/12

Powercost

IIPP 2010-15

Rs. 6,32,654/- (Rupees Six lakhs thirty two thousand six hundred and fifty four only)

1st half year

2016-17

Agreed

56 24/12/16

Sri Vaishnavi Spintex(India) Private Limited , 269, 304,Kolanapalli Village,KALLA,,534237

West Godav

ari

Cotton Yarn

18/03/12

Powercost

IIPP 2010-15

Rs. 44,44,300/- (Rupees Forty four lakhs forty four thousand three hundred only)

1st half year

2016-17

Agreed

Page 14: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

57 26/12/16

South India Krishna Oil And Fats Private Limited , 275,279,280, 281, Epuru Bit-1b,Nellore,,524344

SPSR Nellor

e

Refined Vegetable

Oil

28/09/11

Powercost

IIPP 2010-15

Rs. 19,95,700/- (Rupees Nineteen lakhs ninety five thousand seven hundred only)

1st Quarter

2016-17

Agreed

58 28/12/16

Segno Ceramics Private Limited , 175,Main Road,Vemavaram,,523111

Prakasam

Ceramic Tile

s

02/09/13

Powercost

IIPP 2010-15

Rs. 31,28,700/- (Rupees Thirty one lakhs twenty eight thousand seven hundred only)

1st half year

2016-17

Agreed

59 28/12/16

Ravali Spinners Private Limited , F-19,Industrial Estate,Tanuku,,534218

West Godav

ari

Cotton Yarn

10/01/07

Powercost

IIPP 2005-10

Rs. 18,32,845/- (Rupees Eighteen lakhs thirty two thousand eight hundred and forty five only)

1st Quarter

2016-17

Agreed

60 28/12/16

Ravali Spinners Private Limited , F-19,Industrial Estate,Tanuku,,534218

West Godav

ari

Cotton Yarn

10/01/07

Powercost

IIPP 2005-10

Rs. 18,37,265/- (Rupees Eighteen lakhs thirty seven thousand two hundred and sixty five only)

2nd Quarter

2016-17

Agreed

61 29/12/16

The Ramco CementsLimited , 27-30,Gobburupalem, Anakapally,,531055

Visakhapatn

am

Cement

24/04/15

Powercost

IDP 2015-20

Rs. 81,96,600/- (Rupees Eightyone lakhs ninety six thousand six hundred only)

1st half year

2016-17

Agreed

62 31/12/16

3f Industries Ltd , 1604,EPURU 1B, PANTAPALEM ,NELLORE,,524003

SPSR Nellor

e

Edible Oil Refinery

27/09/12

Powercost

IIPP 2010-15

Rs. 67,86,865/- (Rupees Sixty seven lakhs eighty six thousand eight hundred and sixty five only)

1st half year

2016-17

Agreed

Page 15: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

63 31/12/16

Sri Venkata Sivaparvathi Spinning Mills Pvt. Ltd. , 192/1,2,3,4,Gbc Road,Chebrolu,,522212

Guntur

Cotton Yarn

07/07/08

Powercost

IIPP 2005-10

Rs. 38,84,770/- (Rupees Thirty eight lakhseighty fourthousand seven hundred and seventy only)

1st Quarter

2016-17

Agreed

64 31/12/16

Gajavelli Spinning Mills Pvt Ltd , 126/1,2,Chebrolu,Guntur,,522212

Guntur

Cotton Yarn

21/04/08

Powercost

IIPP 2005-10

Rs. 12,64,124/- (Rupees Twelve lakhs sixty four thousand onehundred and twentyfour only)

1st Quarter (20 days)

2016-17

Agreed

65 02/01/17

Super Spinning MillsLtd , Survey No-387,388,389,390,M.Beerepalli,Hindupur,,515212

Anantapura

m

Cotton Yarn

12/03/07

Powercost

IIPP 2005-10

Rs. 56,26,107/- (Rupees Fifty six lakhs twenty six thousand one hundred and sevenonly)

1st half year

2016-17

Agreed

66 04/01/17

Sri Naga Malleswara Spintex (India) Pvt Ltd , 229/28 26,Rajupalem Village,Rajupalem,,522412

Guntur

Cotton Yarn

03/04/12

Powercost

IIPP 2010-15

Rs. 32,52,110/- (Rupees Thirty two lakhs fifty two thousand one hundred and ten only)

1st half year

2016-17

Agreed

67 08/01/17

Gajavelli Spinning Mills Pvt Ltd , 126/1,2,Chebrolu,Guntur,,522212

Guntur

Cotton Yarn

21/04/08

Powercost

IIPP 2005-10

Rs. 14,36,500/- (Rupees Fourteen lakhs thirty six thousand five hundred only)

1st Quarter (extended 2years)

2016-17

Agreed

68 08/01/17

Gajavelli Spinning Mills Pvt Ltd , 126/1,2,Chebrolu,Guntur,,522212

Guntur

Cotton Yarn

21/04/08

Powercost

IIPP 2005-10

Rs. 18,46,932/- (Rupees Eighteen lakhs forty six thousand ninehundred and thirty two only)

2nd Quarter

2016-17

Agreed

Page 16: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

69 10/01/17

Sai Global Yarn Tex India (P) Ltd., Beside N.H.5, Vellampalli (V), Maddipadu (M), Prakasam District

Prakasam

Cotton Yarn

01/04/11

Powercost

IIPP 2010-15

Rs. 47,96,308/- (Rupees Forty seven lakhs ninety six thousand three hundred and eight only )

1st half year

2016-17

Agreed

70 10/01/17

Supriya Spinning Mills Private Limited , 4,6,Boyapalem, Vunnava Road, Boyapalem, 522233

Guntur

Spinning And Weaving

22/02/12

Interest Subsidy

IIPP 2010-15

Rs. 48,65,210/- (Rupees Forty eight lakhssixty five thousand two hundred and ten only)

1st half year

2016-17

Agreed

71 11/01/17

Sri Manjunatha Spinning Mills Limited , 201/B1a,Thimmapuram,Guntur,,522233

Guntur

Cotton Yarn

14/02/11

Powercost

IIPP 2010-15

Rs. 75,42,240/- (Rupees Seventy five lakhs forty Two thousand two hundred and forty only)

1st half year

2016-17

Agreed

72 13/01/17

Sai Global Yarntex (India) Pvt Ltd , 103/1, 133,Vellampalli Village,Ongole,,523211

Prakasam

Cotton Yarn

01/04/07

Powercost

IIPP 2005-10

Rs. 16,84,640/- (Rupees Sixteen lakhs eighty four thousand sixhundred and forty only)

1st Quarter

2016-17

Agreed

73 13/01/17

Sai Global Yarntex (India) Pvt Ltd , 103/1, 133,Vellampalli Village,Ongole,,523211

Prakasam

Cotton Yarn

01/04/07

Powercost

IIPP 2005-10

Rs. 16,84,640/-( Rupees Sixteen lakhs eighty four thousand sixhundred and forty only)

2nd Quarter

2016-17

Agreed

74 13/01/17

The Gowthami Solvent Oils Ltd SpinningUnit Tetali, 7,Tetali,Tanuku,,534211

West Godav

ari

Cotton Yarn

04/07/07

Powercost

IIPP 2005-10

Rs. 1,71,98,700/- (Rupees Onecrores seventy one lakhs ninety eight thousand seven hundred only)

3rd quarter

2016-17

Agreed

Page 17: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

75 15/01/17

Gajavalli Spinning Mills (P) Ltd.(Expansion), Narakoduru, Renali Road, Chbrolu (V&M), Guntur District

Guntur

Cotton Yarn

19/09/11

Powercost

IIPP 2010-15

Rs. 64,58,319/- (Rupees Sixty four lakhs fifty eight thousand three hundred and nineteen only)

1st half year

2016-17

Agreed

76 16/01/17

Mohan Spintex IndiaLimited , R.S.No.29/2,Vattigudipadu Village,Vattigudipadu Village,,521211

Krishna

Cotton Yarn

02/10/06

Powercost

IIPP 2005-10

Rs. 1,47,27,503/- (Rupees Onecrores forty seven lakhs twenty seven thousand five hundred and three only)

3rd Quarter of 2014-15 to 2nd quarter 2016-17

2016-17

Agreed

77 17/01/17

Mohan Spintex IndiaLimited (Unit-II Diversification), 289/2b3, Remalle Village, Remalle Village,Krishna, 521211

Krishna

Spinning & Weavi

ng

30/04/15

Interest Subsidy

IDP 2015-20

Rs. 3,89,17,860/- (Rupees Three crores eighty nine lakhs seventeen thousand eight hundred and sixty only)

1st half year

2016-17

Agreed

78 17/01/17

Sri Harini Textiles Limited , 47,48 And 49,Tirumalagiri,Jaggayyapeta,,521175

Krishna

Cotton Yarn

12/06/08

Powercost

IIPP 2005-10

Rs. 14,96,379/- (Rupees Fourteen lakhs ninety six thousand three hundred and seventy nine only)

2nd quarter

2016-17

Agreed

79 18/01/17

Ramabhadra Industries Pvt Ltd(Spinning Division - Unit-Iii) , 5/2,9/1,9/3,Tetali,Tetali,,534218

West Godav

ari

Yarn 18/09/10

Powercost

IIPP 2010-15

Rs. 1,65,63,968/- (Rupees Onecrores sixty five lakhs sixty three thousand nine hundred and sixty eightonly)

2nd half year2015-16 & 1st half yearof 2016-17

2016-17

Agreed

Page 18: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

80 18/01/17

Nandivardhana Textile Mills Limited , 257/C, 256/D,Thimmapuram,Thimmapuram,,522233

Guntur

Cotton Yarn

15/11/06

Powercost

IIPP 2005-10

Rs. 7,85,157/- (Rupees Seven lakhs eighty five thousand one hundred and fifty seven only)

2nd quarter

2016-17

Agreed

81 19/01/17

Nandivardhana Textile Mills Limited , 257/C, 256/D,Thimmapuram,Thimmapuram,,522233

Guntur

Cotton Yarn

15/11/06

Powercost

IIPP 2005-10

Rs. 13,89,990/- (Rupees Thirteen lakhs eighty nine thousand nine hundred and ninety only)

1st Quarter

2016-17

Agreed

82 19/01/17

Nandivardhana Textile Mills Limited , 257/C, 256/D,Thimmapuram,Thimmapuram,,522233

Guntur

Cotton Yarn

15/11/06

Powercost

IIPP 2005-10

Rs. 3,92,731/- (Rupees Three lakhs ninety two thousand seven hundred and thirty one only)

3rd quarter

2016-17

Agreed

83 19/01/17

Nandivardhana Textile Mills Limited , 257/C, 256/D,Thimmapuram,Thimmapuram,,522233

Guntur

Cotton Yarn

15/11/06

Powercost

IIPP 2005-10

Rs. 13,89,990/- (Rupees Thirteen lakhs eighty nine thousand nine hundred and ninety only)

4th Quarter

2016-17

Agreed

84 21/01/17

Pvr Spinning And Weaving Limited , 110/2, 108/2,108/3, 108/4,Kondayaplem Road,Tetali Village,,534218

West Godav

ari

Yarn 26/05/07

Powercost

IIPP 2005-10

Rs. 1,25,59,824/- (Rupees Onecrores twenty five lakhs fifty nine thousand eight hundred and twenty four only)

2nd Quarter of 2015-16 to 3rd Quarter of 2016-17

2016-17

Agreed

Page 19: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

85 22/01/17

Pvr Spinning And Weaving Limited , 110/2, 108/2,108/3, 108/4,Kondayapalem Road,TetaliVillage,,534218

West Godav

ari

Yarn 27/08/10

Powercost

IIPP 2010-15

Rs. 1,33,66,422/- (Rupees Onecrores thirty three lakhs sixty six thousand four hundred and twenty twoonly)

2nd half yearof 2015-16 and 2nd half year of 2016-17

2016-17

Agreed

86 24/01/17

Sri Srinivasa SpintexIndia Ltd – Expansion - Ii , 8-104,Pedatadepalli,Tadepalligudem,,534101

West Godav

ari

Cotton Yarn

14/06/12

Powercost

IIPP 2010-15

Rs. 68,49,878/- (Rupees Sixty eight lakhsforty nine thousand eight hundred and seventy eight only)

1st half year

2016-17

Agreed

87 24/01/17

Gowthami Spintex (India) Ltd , 398/399,Duvva,Tanuku,,534156

West Godav

ari

Cotton Yarn

08/09/11

Interest Subsidy

IIPP 2010-15

Rs. 32,01,895/- (Rupees Thirty two lakhs one thousand eight hundred and ninety five only)

1st half year

2016-17

Agreed

88 24/01/17

Sri Vaishnavi Spintex(India) Private Limited , 269, 304,Kolanapalli Village,KALLA,,534237

Krishna

Cotton Yarn

18/03/12

Interest Subsidy

IIPP 2010-15

Rs. 38,96,712/- (Rupees Thirty eight lakhsninety six thousand seven hundred and twelve only)

1st half year

2016-17

Agreed

89 24/01/17

Sri Srinivasa SpintexIndia Ltd – Existing , 8-104,Pedatadepalli,Tadepalligudem,,534101

West Godav

ari

Cotton Yarn

08/08/08

Powercost

IIPP 2005-10

Rs. 46,21,311/- (Rupees Forty six lakhs twenty onethousand three hundred and eleven only)

2nd Quarter

2016-17

Agreed

Page 20: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

90 27/01/17

Nandivardhana Textile Mills Limited , 257/C, 256/D,Thimmapuram,Thimmapuram,,522233

Guntur

Cotton Yarn

25/09/10

Powercost

IIPP 2010-15

Rs. 14,39,690/- (Rupees Fourteen lakhs thirty nine thousand six hundred and ninety only)

1st half year

2016-17

Agreed

91 02/02/17

Viswateja Spinning Mills Private Limited , 219,Boyapalem,Guntur,,522233

Guntur

Cotton Yarn

16/06/06

Powercost

IIPP 2005-10

Rs. 7,08,680/- (Rupees Seven lakhs eightthousand six hundred and eighty only)

1st quarter

2016-17

Agreed

92 02/02/17

Gajavelli Spinning Mills Pvt Ltd , 126/1,2,Chebrolu,Guntur,,522212

Guntur

Cotton Yarn

21/04/08

Powercost

IIPP 2005-10

Rs. 18,46,930/- (Rupees Eighteen lakhs forty six thousand nine hundred and thirty only)

3rd Quarter

2016-17

Agreed

93 03/02/17

Ravali Spinners Pvt Ltd - 1st Expansion , F-19,INDUSTRIAL ESTATE,TANUKU,,534218

West Godav

ari

Cotton Yarn

01/01/09

Powercost

IIPP 2005-10

Rs. 49,13,892/- (Rupees forty nine lakhs thirteen thousand eight hundredand ninetytwo only)

3rd Quarter

2016-17

Agreed

94 04/02/17

Sai Global Yarntex (India) Pvt Ltd , 103/1, 133,Vellampalli Village,Ongole,,523211

Prakasam

Cotton Yarn

01/04/07

Powercost

IIPP 2005-10

Rs. 16,32,240/- (Rupees Sixteen lakhs thirty two thousand two hundred and forty only)

3rd Quarter

2016-17

Agreed

95 10/02/17

Ushaspincoatpvtltd , Rs-341,Chikkavaram,Vijayawada,,521101

Krishna

Cotton Yarn

04/04/11

Powercost

IIPP 2010-15

Rs. 74,16,665/- (Rupees Seventy four lakhs sixteen thousand six hundred and sixty five only)

3rd Quarter

2016-17

Agreed

Page 21: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

96 13/02/17

Jsw Cement Limited , 206,Bilakalagudur,Nandyal,,518508

Kurnool

25/06/12

Powercost

IIPP 2010-15

Rs. 5,64,84,770/- (Rupees Fivecrores sixty four lakhs eighty four thousand seven hundred and seventy only)

1st half year

2016-17

Agreed

97 14/02/17

Avanti Feeds Limited Unit Iii , 544/2, 544/1b,545/3b,746/3a,Kovvur,Kovvur,,534350

West Godav

ari

Shrimp Fee

d

07/04/14

Powercost

IIPP 2010-15

Rs. 42,37,076/- (Rupees Forty two lakhs thirty seven thousand seventy six only)

1st half year

2016-17

Agreed

98 14/02/17

Patchala Spintex Private Limited , 229/25.1,Rajupalem Village,Guntur,,522412

Guntur

Manufacturer Of Cotton Yarn

01/05/15

Interest Subsidy

IDP 2015-20

Rs. 1,35,54,303/- (Rupees Onecrores thirty five lakhs fifty four thousand three hundred and three only)

1st half year

2016-17

Agreed

99 14/02/17

Bala Balajee Textiles Ltd , 492,493,NH-16, NEAR OLD TOLL PLAZA,Tanuku,,534211

West Godav

ari

Cotton Yarn

27/03/08

Powercost

IIPP 2005-10

Rs. 64,21,348/- (Rupees Sixty four lakhs twenty onethousand three hundred and forty eight only)

1st Quarter to 3rd Quarter

2016-17

Agreed

100 15/02/17

Guntur Spinning MillsPrivate Limited , 491, 492/2,Nh-5,Obulanaidupalem,Guntur,,522005

Guntur

Cotton Yarn

12/04/07

Powercost

IIPP 2005-10

Rs. 21,93,720/- (Rupees Twenty one lakhs ninety three thousand seven hundred and twentyonly)

1st Quarter

2016-17

Agreed

Page 22: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

101 15/02/17

Guntur Spinning MillsPrivate Limited , 491, 492/2,Nh-5,Obulanaidupalem,Guntur,,522005

Guntur

Cotton Yarn

12/04/07

Powercost

IIPP 2005-10

Rs. 21,93,720/- (Rupees Twenty one lakhs ninety three thousand seven hundred and twentyonly)

2nd Quarter

2016-17

Agreed

102 15/02/17

Guntur Spinning MillsPrivate Limited , 491, 492/2,Nh-5,Obulanaidupalem,Guntur,,522005

Guntur

Cotton Yarn

12/04/07

Powercost

IIPP 2005-10

Rs. 21,93,720/- (Rupees Twenty one lakhs ninety three thousand seven hundred and twentyonly)

3rd Quarter

2016-17

Agreed

103 17/02/17

Thatavarthi Appareles Ltd (Spinning Division) Kavur (V) Chilakaluripeta Guntur Dist.

Guntur

Cotton Yarn

20/05/11

Powercost

IIPP 2010-15

Rs. 91,13,850/- (Rupees Ninetyone lakhs thirteen thousand eight hundredand fifty only)

1st Quarter

2016-17

Agreed

104 18/02/17

Heritage Foods Limited, Sy No: 40, Tatrakallu(V), Vajrakaruru (M), Ananthapuram Dis T

Anantapura

m

Wind PowerGeneration

27/09/16

Investment subsid

y

IDP 2015-20

Rs. 3,12,35,165/- (Rupees Three crores twelve lakhs thirty five thousand one hundred and sixty five only)

2016-17

Agreed

105 23/02/17

Sri Lakshmi Narasimha SpinningMills (India) Pvt Ltd , 1722/3,Vipparalavaripalem,Vipparalavaripalem,,523212

Prakasam

Cotton Yarn

05/07/08

Powercost

IIPP 2005-10

Rs. 19,79,890/- (Rupees Nineteen lakhs seventy nine thousand eight hundred and ninety only)

2nd Quarter

2016-17

Agreed

Page 23: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

106 23/02/17

Hindusthan NationalGlass And Industries Limited , 12-299,Menakuru,Naidupeta,,524421

SPSR Nellor

e

Container Glass Manfact

ure

28/09/12

Powercost

IIPP 2010-15

Rs. 4,15,97,400/- (Rupees Four crores fifteen lakhsninety seven thousand four hundred only)

3rd Quarter

2016-17

Agreed

107 25/02/17

Idupulapadu CottonMills Pvt Ltd Unit-Ii , 22etc,Jonnathali,Jonnathali,,523301

Prakasam

Cotton Yarn

09/08/11

Powercost

IIPP 2010-15

Rs. 2,93,78,480/- (Rupees Twocrores ninety three lakhs seventy eight thousand four hundred and eighty only)

3rd Quarter

2016-17

Agreed

108 25/02/17

Nsl Textiles Limited , 253,Budampadu,Guntur,,522017

Guntur

Garmenting

30/06/10

Powercost

IIPP 2005-10

Rs. 5,25,140/- (Rupees Five lakhs twenty five thousand one hundred and forty only)

3rd Quarter

2016-17

Agreed

109 25/02/17

Mohan Spintex IndiaLimited, (Unit-II) , 289/2b3, Remalle Village, Remalle Village, Krishna,521110

Krishna

Cotton Yarn

07/03/11

Powercost

IIPP 2005-10

Rs. 3,19,78,602/- (Rupees Three Crores nineteen lakhs seventy eight thousand six hundred and two only)

3rd Quarter

2016-17

Agreed

110 27/02/17

Mohan Spintex IndiaLimited (Expansion) , R.S.No.29/2,Vattigudipadu Village,VattigudipaduVillage,,521211

Krishna

Yarn 28/04/08

Powercost

IIPP 2005-10

Rs. 27,84,308/- (Rupees Twenty seven lakhs eighty four thousand three hundred and eight only)

2nd Quarter

2016-17

Agreed

Page 24: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

111 27/02/17

Mohan Spintex IndiaLimited (Expansion) , R.S.No.29/2,Vattigudipadu Village,VattigudipaduVillage,,521211

Krishna

Yarn 28/04/08

Powercost

IIPP 2005-10

Rs. 27,13,683/- (Rupees Twenty seven lakhs thirteen thousand six hundred and eighty three only)

3rd Quarter

2016-17

Agreed

112 27/02/17

Sri Venkata Sivaparvathi Spinning Mills Pvt. Ltd. , 192/1,2,3,4,Gbc Road,Chebrolu,,522212

Guntur

Cotton Yarn

07/07/08

Powercost

IIPP 2005-10

Rs. 12,43,849/- (Rupees Twelve lakhs forty three thousand eight hundred and forty nine only)

3rd Quarter

2016-17

Agreed

113 01/03/17

Balarama Krishna Spinning MillsPrivate Limited , Nh-5,Chowdavaram,Andhra Pradesh,,522019

guntur

Cotton Yarn

14/04/07

Powercost

IIPP 2005-10

Rs. 22,57,130/- (Rupees Twenty two lakhs fifty seven thousand one hundred and thirty only)

1st Quarter

2016-17

Agreed

114 01/03/17

Balarama Krishna Spinning MillsPrivate Limited , Nh-5,Chowdavaram,Andhra Pradesh,,522019

guntur

Cotton Yarn

14/04/07

Powercost

IIPP 2005-10

Rs. 18,67,850/- (Rupees Eighteen lakhs sixty seven thousand eight hundred and fifty only)

2nd Quarter

2016-17

Agreed

115 01/03/17

Balarama Krishna Spinning MillsPrivate Limited , Nh-5,Chowdavaram,Andhra Pradesh,,522019

guntur

Cotton Yarn

14/04/07

Powercost

IIPP 2005-10

Rs. 6,451/- (Rupees Six thousand four hundred and fifty one only)

3rd Quarter

2016-17

Agreed

Page 25: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

116 03/03/17

Vantagespinners Private Limited , 50,53/2,Gollapalli,Gollapalli,,521111

Krishna

Cotton Yarn

12/02/10

Powercost

IIPP 2005-10

Rs. 1,19,06,387/- (Rupees Onecrores nineteen lakhs six thousand threehundred and eighty seven only)

3rd Quarter

2016-17

Agreed

117 08/03/17

Sri Venkata Lakshmi NarasimhaSpinning Mills Private Limited , 176/4,Gbc Road, Chebrolu Village,Chebrolu,,522212

Guntur

Cotton Yarn

30/12/06

Powercost

IIPP 2005-10

Rs. 13,21,016/- (Rupees Thirteen lakhs twenty onethousand sixteen only)

1st quarter

2016-17

Agreed

118 08/03/17

Sri Venkata Lakshmi NarasimhaSpinning Mills Private Limited , 176/4,Gbc Road, Chebrolu Village,Chebrolu,,522212

Guntur

Cotton Yarn

30/12/06

Powercost

IIPP 2005-10

Rs. 13,21,016/- (Rupees Thirteen lakhs twenty onethousand sixteen only)

2nd Quarter

2016-17

Agreed

119 10/03/17

Sri Venkata Lakshmi NarasimhaSpinning Mills Private Limited , 176/4,Gbc Road, Chebrolu Village,Chebrolu,,522212

Guntur

Cotton Yarn

30/12/06

Powercost

IIPP 2005-10

Rs. 13,21,016/- (Rupees Thirteen lakhs twenty onethousand sixteen only)

3rd Quarter

2016-17

Agreed

120 11/03/17

Emami Agrotech Limited , 501-510,Pantapalem Village,Nellore,,524323

SPSR Nellor

e

Manufacturer Of Edible Oil & F

ats

19/02/12

Powercost

IIPP 2010-15

Rs. 68,75,176/- (Rupees Sixty eight lakhsseventy five thousand one hundred and seventy six only)

2nd Quarter

2016-17

Agreed

Page 26: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

121 11/03/17

Emami Agrotech Limited , 501-510,Pantapalem Village,Nellore,,524323

SPSR Nellor

e

Manufacturer Of Edible Oil & F

ats

19/02/12

Powercost

IIPP 2010-15

Rs. 83,67,744/- (Rupees Eightythree lakhs sixty seven thousand seven hundred and forty four only)

3rd Quarter

2016-17

Agreed

122 13/03/17

Kallam Spinning MillsLimited , 116b, Nh5,Chowdavaram, Guntur,,522019

Guntur

Cotton Yarn, Open End

18/03/10

Powercost

IIPP 2005-10

Rs. 52,14,060/- (Rupees Fifty two lakhs fourteen thousand sixty only)

3rd Quarter

2016-17

Agreed

123 13/03/17

Mittapalli Spinners Limited, Chinaturakapalem (V), Narasaraopet (M), Guntur District

Guntur

Cotton Yarn

29/12/11

Powercost

IIPP 2010-15

Rs. 33,49,260/- (Rupees Thirty three lakhs forty nine thousand two hundred and sixty only)

3rd Quarter

2016-17

Agreed

124 18/03/17

Sri Srinivasa SpintexIndia Ltd – Existing , 8-104,Pedatadepalli,Tadepalligudem,,534101

West Godav

ari

Cotton Yarn

08/08/08

Powercost

IIPP 2005-10

Rs. 20,66,709/- (Rupees Twenty lakhs sixty six thousand seven hundred and nine only)

3rd Quarter

2016-17

Agreed

125 20/03/17

BhavanamSpinning Mills Private Limited , 211,Siripuram Road,Bhiminenivaripalem Village,,522438

Guntur

Cotton Yarn

25/03/08

Powercost

IIPP 2005-10

Rs. 11,07,350/- (Rupees Elevenlakhs seven thousand three hundred and fifty only)

2nd Quarter

2016-17

Agreed

126 20/03/17

BhavanamSpinning Mills Private Limited , 211,Siripuram Road,Bhiminenivaripalem Village,,522438

Guntur

Cotton Yarn

25/03/08

Powercost

IIPP 2005-10

Rs. 11,07,350/- (Rupees Elevenlakhs seven thousand three hundred and fifty only)

3rd Quarter

2016-17

Agreed

Page 27: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

127 30/03/17

Vasant Chemicals Pvt Ltd , 10,10a,Apsez,Atchutapuram,Atchutapuram,,531011

Visakhapatn

am

Pharma Intermediates And SpecialityChemicals

27/12/12

Powercost

IIPP 2010-15

Rs. 15,77,195/- (Rupees Fifteen lakhs seventy seven thousand one hundred and ninety fiveonly)

1st half year

2016-17

Agreed

128 01/04/17

Emami Agrotech Limited , 501-510,Pantapalem Village,Nellore,,524323

SPSR Nellor

e

Manufacturer Of Edible Oil & F

ats

19/02/12

Powercost

IIPP 2010-15

Rs. 45,05,944/- (Rupees Forty five lakhs five thousand nine hundred and forty four only)

4th Quarter

2016-17

Agreed

129 02/04/17

Tirumala Cotton & Agro Products Pvt Ltd , Nh-5,Survey No-240-C,Nh-5,SurveyNo-240-C,Thimmapuram,,522223

Guntur

Cotton Spinning

16/11/06

Powercost

IIPP 2005-10

Rs. 28,60,170/- (Rupees Twenty eight lakhs sixty thousand one hundred and seventy only)

1st Quarter

2016-17

Agreed

130 02/04/17

Tirumala Cotton & Agro Products Pvt Ltd , Nh-5,Survey No-240-C,Nh-5,SurveyNo-240-C,Thimmapuram,,522223

Guntur

Cotton Spinning

16/11/06

Powercost

IIPP 2005-10

Rs. 28,60,170/- (Rupees Twenty eight lakhs sixty thousand one hundred and seventy only)

2nd Quarter

2016-17

Agreed

131 02/04/17

Tirumala Cotton & Agro Products Pvt Ltd , Nh-5,Survey No-240-C,Nh-5,SurveyNo-240-C,Thimmapuram,,522223

Guntur

Cotton Spinning

16/11/06

Powercost

IIPP 2005-10

Rs. 17,68,391/- (Rupees Seventeen lakhssixty eightthousand three hundred and ninety one only)

3rd quarter

2016-17

Agreed

Page 28: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

132 04/04/17

Sree Lalitha Parameswari Spinning Mills Pvt Ltd , DNo,Narakoduru To Tenali Road,Guntur,,522212

Guntur

Cotton Yarn

05/08/06

Powercost

IIPP 2005-10

Rs. 14,79,050/- (Rupees Fourteen lakhs seventy nine thousand fifty only)

1st Quarter

2016-17

Agreed

133 04/04/17

Sree Lalitha Parameswari Spinning Mills Pvt Ltd , DNo,Narakoduru To Tenali Road,Guntur,,522212

Guntur

Cotton Yarn

05/08/06

Powercost

IIPP 2005-10

Rs. 5,56,630/- (Rupees Five lakhs fifty sixthousand six hundred and thirty only)

2nd Quarter

2016-17

Agreed

134 09/04/17

Amaravathi TextilesPrivate Limited , Nh16,Martur,Martur,,523301

Prakasam

Cotton Yarn

27/03/09

Powercost

IIPP 2005-10

Rs. 3,01,32,326/- (Rupees Three crores one lakhs thirty two thousand three hundred and twenty six only)

3rd Quarter

2016-17

Agreed

135 12/04/17

Emami Agrotech Limited , 501-510,PANTAPALEM,Nellore,,524003

SPSR Nellor

e

Manufacturer Of Edible Oil & F

ats

19/02/12

Sales Tax

IIPP 2010-15

Rs. 19,88,67,941/-(Rupees Nineteen crores eighty eight lakhs sixty seventhousand nine hundred and forty four only)

2016-17

Agreed

136 14/04/17

3f Industries Ltd , 1604,EPURU 1B, PANTAPALEM ,NELLORE,,524003

SPSR Nellor

e

Edible Oil Refinery

27/09/12

Powercost

IIPP 2010-15

Rs. 30,58,052/- (Rupees Thirty lakhs fifty eight thousand fifty two only)

3rd Quarter

2016-17

Agreed

Page 29: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

137 14/04/17

Bala Balajee Textiles Ltd , 492,493,NH-16, NEAR OLD TOLL PLAZA,Tanuku,,534211

West Godav

ari

Cotton Yarn

27/03/08

Powercost

IIPP 2005-10

Rs. 17,14,153/- (Rupees Seventeen lakhsfourteen thousand one hundred and fiftythree only)

4th Quarter

2016-17

Agreed

138 14/04/17

3f Industries Ltd , 1604,EPURU 1B, PANTAPALEM ,NELLORE,,524003

SPSR Nellor

e

Edible Oil Refinery

27/09/12

Sales Tax

IIPP 2010-15

Rs. 12,99,42,454/- (Rupees Twelve crores ninety nine lakhs forty two thousand four hundredand fifty four only)

2016-17

Agreed

139 18/04/17

Gowthami Spintex (India) Ltd , 398/399,Duvva,Tanuku,,534156

West Godav

ari

Cotton Yarn

08/09/11

Powercost

IIPP 2010-15

Rs. 90,23,522/- (Rupees Ninetylakhs twenty three thousand five hundred and twenty two only)

2nd Half year

2016-17

Agreed

140 18/04/17

The Gowthami Solvent Oils Limited , Spinning Unit 2, Plot No 323,Mortha, Tanuku,,534227

West Godav

ari

Cotton Yarn

18/10/11

Powercost

IIPP 2010-15

Rs. 99,76,537/- (Rupees Ninetynine lakhs seventy six thousand five hundred and thirty seven only)

2nd half year

2016-17

Agreed

141 18/04/17

The Gowthami Solvent Oils Ltd SpinningUnit Tetali, 7,Tetali,Tanuku,,534211

West Godav

ari

Cotton Yarn

04/07/07

Powercost

IIPP 2005-10

Rs. 29,38,800/- (Rupees Twenty nine lakhs thirty eight thousand eight hundred only)

4th Quarter

2016-17

Agreed

Page 30: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

142 20/04/17

Ramabhadra Industries Pvt Ltd(Spinning Division - Unit-Iii) , 5/2,9/1,9/3,Tetali,Tetali,,534218

West Godav

ari

Yarn 18/09/10

Powercost

IIPP 2010-15

Rs. 82,64,200/-(Rupees Eightytwo lakhs sixty four thousand two hundred only)

2nd half year

2016-17

Agreed

143 20/04/17

Ramabhadra Industries Pvt Ltd(Spinning Division - Unit-I) , 44/2A,44/3A,Tetali,TETALI,,534218

West Godav

ari

Manudacturing Of Yarn

13/04/07

Powercost

IIPP 2005-10

Rs. 13,28,095/- (Rupees Thirteen lakhs twenty eight thousand ninety five only)

4th Quarter

2016-17

Agreed

144 22/04/17

Pvr Spinning And Weaving Limited , 110/2, 108/2,108/3, 108/4,Kondayapalem Road,TetaliVillage,,534218

West Godav

ari

Yarn 27/08/10

Powercost

IIPP 2010-15

Rs. 34,01,976/- (Rupees Thirty four lakhs one thousand nine hundred and seventy six only)

4th Quarter

2016-17

Agreed

145 25/04/17

Swarnalatha SpintexPvt Ltd , Rs No 1/4,Veluru Road,Serinarasannapalem,,521105

Krishna

Cotton Spinning

12/02/12

Powercost

IIPP 2010-15

Rs. 59,46,232/- (Rupees Fifty nine lakhs forty six thousand two hundred and thirty two only)

2nd half year

2016-17

Agreed

146 26/04/17

Ravali Spinners Private Limited (2nd Expansion Unit) , F-19,INDUSTRIAL ESTATE,TANUKU,,534218

West Godav

ari

Cotton Yarn

20/11/10

Powercost

IIPP 2010-15

Rs. 2,44,91,880/- (Rupees Twocrores forty four lakhs ninety one thousand eight hundred and eighty only)

2nd half year

2016-17

Agreed

Page 31: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

147 26/04/17

Sri Manjunatha Spinning Mills Limited , 201/B1a,Thimmapuram,Guntur,,522233

Guntur

Cotton Yarn

14/02/11

Powercost

IIPP 2010-15

Rs. 77,97,300/-(Rupees Seventy seven lakhs ninety seven thousand three hundred only)

2nd half year

2016-17

Agreed

148 26/04/17

Ravali Spinners Pvt Ltd - 1st Expansion , F-19,INDUSTRIAL ESTATE,TANUKU,,534218

West Godav

ari

Cotton Yarn

01/01/09

Powercost

IIPP 2005-10

Rs. 18,54,299/- (Rupees Eighteen lakhs fifty four thousand twohundred and ninety nine only)

4th Quarter

2016-17

Agreed

149 27/04/17

Svr Spinning Mills Pvt Ltd , 366,Malleswaram,Khandavalli,,534330

West Godav

ari

Cotton Yarn

20/11/11

Powercost

IIPP 2010-15

Rs. 51,53,062/- (Rupees Fifty one lakhs fifty three thousand sixty two only)

2nd half year

2016-17

Agreed

150 30/04/17

Anjani Tiles Limited , 522-527,Eaguva Raja Palem,Gudur,,524410

SPSR Nellor

e

ManufactureOf Tile

s

01/04/16

Powercost

IDP 2015-20

Rs. 54,87,970/-(Rupees Fifty four lakhs eighty seven thousand nine hundred and seventy only)

2nd half year

2016-17

Agreed

151 30/04/17

Sriven Spincot Private Limited , 8-87,Karuchola Road,Edlapadu,,522233

Guntur

Cotton Yarn

09/06/14

Powercost

IIPP 2010-15

Rs. 44,96,380/- (Rupees Forty four lakhs ninety six thousand three hundred and eighty only)

2nd half year

2016-17

Agreed

152 30/04/17

Kallam Spinning MillsLimited , 116b, Nh5,Chowdavaram, Guntur,,522019

Guntur

Cotton Yarn, Open End

18/03/10

Powercost

IIPP 2005-10

Rs. 50,50,090/- (Rupees Fifty Lakhs fifty thousand ninety only)

4th Quarter

2016-17

Agreed

Page 32: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

153 01/05/17

Growel Processors Private Limited , 8/5, 8/6,MainRoad,Singarayipalem,,521329

Krishna

Frozen FishAnd Shrimp

09/05/15

Powercost

IDP 2015-20

Rs. 40,50,075/- (Rupees Fortylakhs fifty thousand seventy five only)

2nd half year

2016-17

Agreed

154 03/05/17

Swarnalatha SpintexPvt Ltd , Rs No 1/4,Veluru Road,Serinarasannapalem,,521105

Krishna

Cotton Spinning

12/02/12

Interest Subsidy

IIPP 2010-15

Rs. 49,94,425/- (Rupees Forty nine lakhs ninety fourthousand four hundred and twenty five only)

2nd half year

2016-17

Agreed

155 03/05/17

Vennar Ceramics Limited , 593/1,596/1,3,597/5,Perikigudem,Kaikaluru,,521345

Krishna

Ceramic WallTiles

01/07/12

Powercost

IIPP 2010-15

Rs. 32,99,325/-(Rupees Thirty two lakhs ninety nine thousand three hundred and twenty five only)

2nd half year

2016-17

Agreed

156 04/05/17

Guntur Spinning MillsPrivate Limited , 491,492/2,Etukuru,Guntur,,522005

Guntur

Cotton Yarn

06/07/15

Interest Subsidy

IDP 2015-20

Rs. 1,16,56,956/- (Rupees Onecrores sixteen lakhs fifty six thousand ninehundred and fifty sixonly)

2nd half year

2016-17

Agreed

157 05/05/17

Supriya Spinning Mills Private Limited , 4,6,Boyapalem, Vunnava Road, Boyapalem, 522233

Guntur

Spinning And Weaving

22/02/12

Powercost

IIPP 2010-15

Rs. 43,52,800/- (Rupees Forty three lakhs fifty twothousand eight hundred only)

2nd half year

2016-17

Agreed

158 05/05/17

Supriya Spinning Mills Private Limited , 4,6,Boyapalem, Vunnava Road, Boyapalem, 522233

Guntur

Spinning And Weaving

22/02/12

Interest Subsidy

IIPP 2010-15

Rs. 41,85,564/- (Rupees Forty one lakhs eighty fivethousand five hundred and sixty four only)

2nd half year

2016-17

Agreed

Page 33: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

159 05/05/17

Supriya Spinning Mills Private Limited , 4,6,Boyapalem, Vunnava Road, Boyapalem, 522233

Guntur

Spinning And Weaving

22/02/12

Powercost

IIPP 2010-15

Rs. 12,23,836/- (Rupees Twelve lakhs twenty threethousand eight hundred and thirty six only )

4th Quarter

2016-17

Agreed

160 05/05/17

Godrej Agrovet Limited - Unit-2 , 57,Main Road,Chintampalli,,534460

West Godav

ari

Crude Palm Oil, Crude Palm Kernel Oil, PalmKernalCake

09/07/12

Sales Tax

IIPP 2010-15

Rs. 1,25,31,855/- (Rupees Onecrores twenty five lakhs thirty one thousand eight hundred and fifty five only)

2016-17

Agreed

161 05/05/17

Godrej Agrovet Limited Unit-2 (Expansion) , 57,Main Road,Chintampalli,,534406

West Godav

ari

Crude Palm Oil, Crude Palm Kernel Oil Palm KernalCake

15/06/13

Sales Tax

IIPP 2010-15

Rs. 1,92,43,524/- (Rupees Onecrores ninety two lakhs forty three thousand five hundred and twentyfour only)

2016-17

Agreed

162 09/05/17

Gajavelli Spinning Mills Pvt Ltd , 126/1,2,Chebrolu,Guntur,,522212

Guntur

Cotton Yarn

21/04/08

Powercost

IIPP 2005-10

Rs. 18,46,930/- (Rupees Eighteen lakhs forty six thousand ninehundred and thirty only)

4th Quarter

2016-17

Agreed

163 11/05/17

Mohan Spintex IndiaLimited (Unit-II Diversification), 289/2b3, Remalle Village, Remalle Village,Krishna, 521211

Krishna

Spinning & Weavi

ng

30/04/15

Powercost

IDP 2015-20

Rs. 4,16,17,931/-(Rupees Four crores sixteen lakhs seventeenthousand nine hundred and thirty one only)

2nd half year

2016-17

Agreed

Page 34: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

164 11/05/17

Mohan Spintex IndiaLimited (Expansion) , R.S.No.29/2,Vattigudipadu Village,VattigudipaduVillage,,521211

Krishna

Yarn 28/04/08

Powercost

IIPP 2005-10

Rs. 26,59,063/- (Rupees Twenty six lakhsfifty nine thousand sixty three only)

4th Quarter

2016-17

Agreed

165 11/05/17

Mohan Spintex IndiaLimited, (Unit-II) , 289/2b3, Remalle Village, Remalle Village, Krishna,521110

Krishna

Cotton Yarn

07/03/11

Powercost

IIPP 2005-10

Rs. 3,18,32,348/- (Rupees Three crores eighteen lakhs thirtytwo thousand three hundred and forty eight only)

4th Quarter

2016-17

Agreed

166 15/05/17

Hindusthan NationalGlass And Industries Limited , 12-299,Menakuru,Naidupeta,,524421

SPSR Nellor

e

Container Glass Manfact

ure

28/09/12

Powercost

IIPP 2010-15

Rs. 4,15,09,000/- (Rupees Four crores fifteen lakhsnine thousand only)

4th Quarter

2016-17

Agreed

167 16/05/17

Anjani Tiles Limited , 522-527,Eaguva Raja Palem,Gudur,,524410

SPSR Nellor

e

ManufactureOf Tile

s

01/04/16

Sales Tax

IDP 2015-20

Rs. 3,68,44,434/- (Rupees Three crores sixty eightlakhs fortyfour thousand four hundred and thirty four only)

2016-17

Agreed

168 18/05/17

Growel Feeds Private Limited-Expansion2 , 57 ,Chevuru,Chevuru,,521329

Krishna

AnimalFeed

14/02/14

Powercost

IIPP 2010-15

Rs. 42,16,375/- (Rupees Forty two lakhs sixteen thousand three hundred and seventy five only)

2nd half year

2016-17

Agreed

Page 35: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

169 20/05/17

Sri Srinivasa SpintexIndia Ltd – Existing , 8-104,Pedatadepalli,Tadepalligudem,,534101

West Godav

ari

Cotton Yarn

08/08/08

Powercost

IIPP 2005-10

Rs. 20,66,709/- (Rupees Twenty lakhs sixty six thousand seven hundred and nine only)

4th Quarter

2016-17

Agreed

170 24/05/17

Segno Ceramics Private Limited , 175,Main Road,Vemavaram,,523111

Prakasam

Ceramic Tile

s

02/09/13

Powercost

IIPP 2010-15

Rs. 25,54,217/- (Rupees Twenty five lakhs fifty fourthousand two hundred and seventeen only)

2nd half year

2016-17

Agreed

171 24/05/17

Segno Ceramics Private Limited , 175,Main Road,Vemavaram,,523111

Prakasam

Ceramic Tile

s

02/09/13

Sales Tax

IIPP 2010-15

Rs. 1,17,32,150/-(Rupees One crores seventeen lakhs thirty two thousand one hundred andfifty only)

2016-17

Agreed

172 29/05/17

Super Spinning MillsLtd , Survey No-387,388,389,390,M.Beerepalli,Hindupur,,515212

Anantapura

m

Cotton Yarn

12/03/07

Powercost

IIPP 2005-10

Rs. 52,69,133/- (Rupees Fifty two lakhs sixty nine thousand one hundred and thirty three only)

2nd half year

2016-17

Agreed

173 31/05/17

Sai Global Yarn Tex India (P) Ltd., Beside N.H.5, Vellampalli (V), Maddipadu (M), Prakasam District

Prakasam

Cotton Yarn

01/04/11

Powercost

IIPP 2010-15

Rs. 33,87,410/- (Rupees Thirty three lakhs eighty seven thousand four hundred and ten only)

2nd half year

2016-17

Agreed

Page 36: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

174 31/05/17

Sai Global Yarntex (India) Pvt Ltd , 103/1, 133,Vellampalli Village,Ongole,,523211

Prakasam

Cotton Yarn

01/04/07

Powercost

IIPP 2005-10

Rs. 16,84,640/- (Rupees Sixteen lakhs eighty four thousand sixhundred and forty only)

4th Quarter

2016-17

Agreed

175 05/06/17

Silica Ceramica Private Limited , 97-107,Narayanapuram, Narayanapuram,,534407

West Godav

ari

Vetrified Ceramic Tiles

11/05/11

Sales Tax

IIPP 2010-15

Rs. 2,70,06,639/-(Rupees Two crores seventy lakhssix thousand six hundred and thirty nine only)

2016-17

Agreed

176 14/06/17

3f Industries Ltd , 1604,EPURU 1B, PANTAPALEM ,NELLORE,,524003

SPSR Nellor

e

Edible Oil Refinery

27/09/12

Powercost

IIPP 2010-15

Rs. 15,34,125/- (Rupees Fifteen lakhs thirty four thousand one hundred and twenty five only)

4th Quarter

2016-17

Agreed

177 17/07/17

Mohan Spintex IndiaLimited (Unit-II Diversification), 289/2b3, Remalle Village, Remalle Village,Krishna, 521211

Krishna

Spinning & Weavi

ng

30/04/15

Interest Subsidy

IDP 2015-20

Rs. 3,71,36,581/- (Rupees Three crores seventy one lakhs thirty six thousand five hundred and eightyone only)

2nd half year

2016-17

Agreed

178 24/07/17

Mohan Spintex IndiaLimited (Expansion) , R.S.No.29/2,Vattigudipadu Village,VattigudipaduVillage,,521211

Krishna

Yarn 28/04/08

Powercost

IIPP 2005-10

Rs. 27,46,348/- (Rupees Twenty seven lakhs forty six thousand three hundred and forty eightonly)

1st Quarter

2017-18

Agreed

Page 37: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

179 24/07/17

Mohan Spintex IndiaLimited, (Unit-II) , 289/2b3, Remalle Village, Remalle Village, Krishna,521110

Krishna

Yarn 07/03/11

Powercost

IIPP 2005-10

Rs. 3,38,31,180/- (Rupees Three crores thirty eight lakhs thirty one thousand onehundred and eighty only)

1st Quarter

2017-18

Agreed

180 18/02/17(Belated claim. 50% considered)

Heritage Foods Limited, Sy No: 22, Tatrakallu (V),Vajrakaruru (M), Ananthapuram Dis T

Anantapura

m

Wind PowerGeneration

01/04/16

Investment subsid

y

IDP 2015-20

Rs. 1,56,08,655/-(Rupees One crores fifty six lakhseight thousand six hundred and fifty fiveonly)

2017-18

Agreed

181 22/04/17(Belated claim, 50% considered)

Bogeashavara Polymers Private Limited , 302/B, 305/B,Gadigarevula,Nandyal,,518511

Kurnool

Pp Woven Sacks, Pp Yar

n

07/07/14

Powercost

IIPP 2010-15

Rs. 94,110/- (RupeesNinety four thousand one hundred and ten only)

1st half year

2016-17

Agreed

The SLC observed that all the above claims filed in time as per the

respective policies i.e IIPP 2005-10, IIPP 2010-15, IDP 2015-20 and extendedpolicy vide G.O. Ms. No. 168, Industries &Commerce (Prog-II) Department,dt.30/11/2016.

Further, SLC discussed on the proposals for sanction of financial assistance under IIDFand the decision of SLC is as follows:

Sl.No

Name and addressof the Unit

Total Amount ofExpenditure on

Infrastructure consideredby the committee after

deducting in-eligibleamounts

Observation of theScrutiny /

VerificationCommittee

Decisionof SLC

Infrastructurefacility

Amount (in Rs.)

1 M/S Toyotsu RareEarths India PrivateLimited, plot no.2d &2e APSEZ,Atchyutapuram,Visakhapatnam forsanction of financialassistance for IIDF Scheme under IDP2010-15.

Zero LiquidDischargefacility

4,52,97,678 SVC decided toratify the earlierrelease and agreedfor release ofbalance amount ofRs.30,63,663/-and recommendedto SLC forconsideration ofabove decision.

Agreed.

Page 38: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

2 M/s. SegnoCeramics PvtLimited Sy No. 175-177/5, Vemavaram(V) Ballikurava (M)Prakasam Dist forsanction of financialassistance for IIDF Scheme under IDP2010-15.

Water,Approach Road& Power

84,91,860 SVC agreedi) To recommend forsanction of Rs.26,43,670/-(52,87,340/- X50%) towardspower component .ii) Committeedecided to call RWS& PR Dept. officialsto get their opinion.Then present theopinion to SLC forconsideration

Agreed.

3 M/s. Mulpuri Foodsand Feeds PrivateLimited , RS No.22 &30 Morsapudi (V)Nuzvid MandalKrishna District forsanction of financialassistance for IIDF Scheme under IDP2010-15.

33 KV powerline

30,67,137 SVC discussed andconsidered the costincurred for externalinfrastructure(power component)as Rs.12,48,890/-.The committeedecided torecommend to SLCfor sanction ofRs.6,24,445/-(12,48,890 x 50%)towards IIDF.

Agreed.

The Chairperson requested the SLC members to offer their remarks andsuggestions for framing new Infrastructure policy guidelines for mega projectsalong with safety measures to be taken by the Government in case of nonimplementation of the unit after availing the incentives under IIDF.

The SLC observed that the claims are being received without indicating the date ofcompletion of infrastructure component by industrialists and without propersupporting documents. The line departments are denying for mentioning the dateof completion of the infrastructure component, executed by Units. Power linecomponent completion can be considered by verifying the date of power releasewheres as in case of road, water and other components, there is no evidenceabout date of completion. The SVC expressed its view to ascertain the date ofcompletion from Chartered Accountant by verifying the date of expenditure andalso by obtaining the affidavit from the unit holder. Further it is decided the dateof completion of each infrastructure should be before DCP or within 6 monthsfrom DCP.

The SLC discussed the importance of date of completion of infrastructure componentsand its effect on the eligibility for sanctioning the incentives under IIDF.

The Chairperson instructed the JD (Infra) to prepare simplified guidelines on IIDFand to place it in next SLC for deliberations and suggestions.

The Chairperson also directed to take necessary measures for filing andprocessing of IIDF claims through Information Technology enabled platform withan aim to improve the Ease of Doing Business.

Page 39: th S.L.C. MEETING HELD ON 16/02/2018 AT 10.00 A.M. st · 1079/2,K rishnarao Palem,Vija yawada,,5 21227 Krishn a Yarn 16/03 /09 Power cost IIPP 200 5-10 Rs. 55,03, 104/- (Rup ees Fifty

COMMISSIONER OF INDUSTRIES