13
TREX meeting 27 th of November 2019 VELO vacuum system status On behalf of the VSC Josef Sestak

th of November 2019 VELO vacuum system status · 2019. 12. 1. · Activities motivated by VELO upgrade • Extension of the VELO differential pressure control unit; • Modification

  • Upload
    others

  • View
    2

  • Download
    0

Embed Size (px)

Citation preview

Page 1: th of November 2019 VELO vacuum system status · 2019. 12. 1. · Activities motivated by VELO upgrade • Extension of the VELO differential pressure control unit; • Modification

TREX meeting 27th of November 2019

VELO vacuum system statusOn behalf of the VSC – Josef Sestak

Page 2: th of November 2019 VELO vacuum system status · 2019. 12. 1. · Activities motivated by VELO upgrade • Extension of the VELO differential pressure control unit; • Modification

Overview of the activities

Additional sectorisation of the IP8.X;

Activities motivated by VELO upgrade;

Activities motivated by SMOG 2;

Already presented, discussed and

approved:

o TREX #19;

o LHCb Technical Committee 12/2018;

o IWG (multiple times);

Page 3: th of November 2019 VELO vacuum system status · 2019. 12. 1. · Activities motivated by VELO upgrade • Extension of the VELO differential pressure control unit; • Modification

Additional sectorisation

• Existing sectorisation of IP8.X (RB84 – RB86);

11/27/2019 Document reference 3

Page 4: th of November 2019 VELO vacuum system status · 2019. 12. 1. · Activities motivated by VELO upgrade • Extension of the VELO differential pressure control unit; • Modification

Additional sectorisation

• Existing sectorisation of IP8.X (RB84 – RB86);

11/27/2019 Document reference 4

Page 5: th of November 2019 VELO vacuum system status · 2019. 12. 1. · Activities motivated by VELO upgrade • Extension of the VELO differential pressure control unit; • Modification

Additional sectorisation

• Prepare UX85 space reservation upstream of the VELO;

11/27/2019 Document reference 5

• Removal of the angle valve GV302;

• New sector valve as close to IP8 as possible;

• Aperture issue (valve ID63 – VELO ID80;

Page 6: th of November 2019 VELO vacuum system status · 2019. 12. 1. · Activities motivated by VELO upgrade • Extension of the VELO differential pressure control unit; • Modification

Additional sectorisation

• Aperture – we were lucky; VELO elliptical head has

been modified during the production (Nikhef – Thermo).

11/27/2019 Document reference 6

Page 7: th of November 2019 VELO vacuum system status · 2019. 12. 1. · Activities motivated by VELO upgrade • Extension of the VELO differential pressure control unit; • Modification

Additional sectorisation

11/27/2019 Document reference 7

• Old transition removed and geometry reconstructed

• New transition (VELO 54mm – Sector valve 63mm)

• Produced and available for installation in 2020

54mm 63mm

Page 8: th of November 2019 VELO vacuum system status · 2019. 12. 1. · Activities motivated by VELO upgrade • Extension of the VELO differential pressure control unit; • Modification

Additional sectorisation

11/27/2019 Document reference 8

Gate valve ID150

Sector valve VVGST ID63

HiPace 700 turbo-molecular pump

Standard module

ID80/63 with RF contact

Transition chamber ID63/54

• New configuration increase the available space;

• Smooth aperture transition;

• VELO protection cover needs to be modified;

• Equipment available for installation in 2020.

Page 9: th of November 2019 VELO vacuum system status · 2019. 12. 1. · Activities motivated by VELO upgrade • Extension of the VELO differential pressure control unit; • Modification

Activities motivated by VELO upgrade

• Extension of the VELO differential pressure control unit;

• Modification of the GIS lines;

11/27/2019 Document reference 9

Additional

pressure-switch

Design and production of two new vacuum hubs

Production ongoing – will be ready by beginning of 2020

Spare pressure

switches to be

ordered

Modification of the GIS lines to make

space for CO2 cooling system

• To be scheduled (Q1 2020)

Page 10: th of November 2019 VELO vacuum system status · 2019. 12. 1. · Activities motivated by VELO upgrade • Extension of the VELO differential pressure control unit; • Modification

Activities motivated by SMOG 2

11/27/2019 Document reference 10

Design and production of custom flange for Storage cell connection

Production ongoing – will be ready by beginning of 2020

All-metal right angle UHV valve (DN10) – Storage cell injection

Equipment available for installation

Custom DN10 capillary – production by Q1 2020

Instrumented pumping group

Penning + Pirani gauge;

PV503 – SMOG injection;

Connection to Neon injection line;

Connection to SMOG injection line;

Current SMOG inlet

(will be used for connection after the LS2)

Page 11: th of November 2019 VELO vacuum system status · 2019. 12. 1. · Activities motivated by VELO upgrade • Extension of the VELO differential pressure control unit; • Modification

Activities motivated by SMOG 2

• Installation of the GFS line;

• Installation of the GFS table;

• Position on the balcony next to the current GIS;

• GIS table needs some small modifications (BVO);

• Bypass from the SMOG to GFS;

• Feasible during the YETS period.

11/27/2019 Document reference 11

Expected by 2020

Run 3

Page 12: th of November 2019 VELO vacuum system status · 2019. 12. 1. · Activities motivated by VELO upgrade • Extension of the VELO differential pressure control unit; • Modification

Additional activities

• Installation of the RGA with long-range cables;

• Inspection of the components related with

corrosion issue on the VELO vacuum system;

• Relocation of the calibrated Bayard-Alpert gauge

closer / on the VELO (ECR LHC-VGI-EC-0001).

11/27/2019 Document reference 12

Page 13: th of November 2019 VELO vacuum system status · 2019. 12. 1. · Activities motivated by VELO upgrade • Extension of the VELO differential pressure control unit; • Modification

Thank you for your attention

11/27/2019 Document reference 13